ND-19-0025, Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.7.04.01 (Index Number 712)

From kanterella
Jump to navigation Jump to search
Unit 4 - Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.7.04.01 (Index Number 712)
ML19017A133
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/16/2019
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk
References
ND-19-0025
Download: ML19017A133 (6)


Text

Michael J. Yox 7825 River Road

>-. Southern Nuclear Regulatory Affairs Director Vogtle 3 & 4 Waynesboro, GA 30830 706-848-6459 tel 41 0-4 74-8587 cell myox@southernco.com JAN 1 6 2019 Docket Nos.: 52-025 52-026 ND-19-0025 10 CFR 52.99(c)(3)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 and Unit 4 Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.7.04.01 [Index Number 7121 Ladies and Gentlemen :

Pursuant to 10 CFR 52.99(c)(3) , Southern Nuclear Operating Company hereby notifies the NRC that as of January 14, 2019, Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Uncompleted Inspections, Tests, Analyses , and Acceptance Criteria (ITAAC) Item 2.7.04.01 [Index Number 7121 has not been completed greater than 225-days prior to initial fuel load. The Enclosure describes the plan for completing this ITAAC. Southern Nuclear Operating Company will , at a later date, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.

This notification is informed by the guidance described in NEI 08-01, Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01 , this notification includes ITAAC for which required inspections, tests, or analyses have not been performed or have been only partially completed . All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met prior to plant operation , as required by 10 CFR 52.103(g) .

This letter contains no new NRC regulatory commitments.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Re;,:1;:t,:,111 MichaelJ . Yox 9*{!/'J Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.7.04.01 [Index Number 7121 MJY/GDUsfr

U.S. Nuclear Regulatory Commission ND-19-0025 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. D. A. Bost (w/o enclosures)

Mr. D. L. McKinney (w/o enclosures)

Mr. M. D. Meier (w/o enclosures)

Mr. D. H. Jones (w/o enclosures)

Mr. J. B. Klecha Mr. G. Chick Mr. M. J. Yox Mr. A. S. Parton Ms. K. A. Roberts Mr. T. G. Petrak Mr. W. A. Sparkman Mr. C. T. Defnall Mr. C. E. Morrow Mr. J. L. Hughes Ms. K. M. Stacy Ms. A. C. Chamberlain Mr. J. C. Haswell Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Regulatory Commission Mr. W. Jones (w/o enclosures)

Mr. F. D. Brown Ms. J.M. Heisserer Mr. C. P. Patel Mr. G. J. Khouri Ms. S. E. Temple Mr. N. D. Karlovich Mr. A. Lerch Mr. C. J. Even Mr. B. J. Kemker Ms. N. C. Coovert Mr. C. Welch Mr. I. Cozens Mr. J. Gaslevic Mr. V. Hall Oglethorpe Power Corporation Mr. R. B. Brinkman Mr. E. Rasmussen Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros

U.S. Nuclear Regulatory Commission ND-19-0025 Page 3 of 3 Westinghouse Electric Company, LLC Dr. L. Oriani (w/o enclosures)

Mr. D. C. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G. Iller Ms. J. Monahan Mr. J. L. Coward Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W.R. Jacobs, Jr., Ph.D., GOS Associates, Inc.

Mr. S. Roetger, Georgia Public Service Commission Ms. S. W. Kemizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham

U.S. Nuclear Regulatory Commission ND-19-0025 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-19-0025 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.7.04.01 [Index Number 712]

U.S. Nuclear Regulatory Commission ND-19-0025 Enclosure Page 2 of 3 ITAAC Statement Design Commitment

1. The functional arrangement of the VZS is as described in the Design Description of this Section 2.7.4.

Inspections/Tests/Analyses Inspection of the as-built system will be performed.

Acceptance Criteria The as-built VZS conforms with the functional arrangement described in the Design Description of this Section 2.7.4.

ITAAC Completion Description An inspection of the as-built diesel generator building ventilation system (VZS) is conducted after completion of construction to confirm the functional arrangement of the VZS is as described in the Design Description of Combined License (COL) Appendix C Section 2.7.4. This inspection encompasses the structures, systems, and components (SSCs) identified in the COL Appendix C Section 2.7.4, Design Description, including those in Figure 2.7.4-1 and Table 2.7.4-3.

The inspection (walkdown) is completed in accordance with ND-RA-001-012, Functional Arrangement Scoping Process (Reference 1), which requires the preparation of a detailed inspection plan. This inspection plan includes the use of detailed drawings such as Piping and Instrumentation Drawings (P&IDs) or Single Line Elementary Drawings to perform visual observations and compare the as-built system to the Design Description.

The inspection results are documented in the Unit 3 and Unit 4 Principal Closure Documents XXX and YYY (References 2 and 3, respectively) supporting the Unit 3 and Unit 4 ITAAC 2.7.04.01 Completion Packages (References 4 and 5, respectively) and verify the SSCs are physically arranged and located to perform the functions described in the Design Description and referenced figure and table. The inspection results confirm that the as-built VZS conforms with the functional arrangement as described in the COL Appendix C Section 2.7.4, Design Description.

The Unit 3 and Unit 4 Principal Closure Documents XXX and YYY are available for NRC inspection as part of the Unit 3 and Unit 4 ITAAC 2.7.04.01 Completion Packages.

List of ITAAC Findings In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all findings pertaining to the subject ITAAC and associated corrective actions. This review found there are no relevant ITAAC findings associated with this ITAAC.

References (available for NRC inspection)

1. ND-RA-001-012 Version 2.1, "Functional Arrangement Scoping Process"
2. Principal Closure Document XXX (Unit 3)

U.S. Nuclear Regulatory Commission ND-19-0025 Enclosure Page 3 of 3

3. Principal Closure Document YYY (Unit 4)
4. ITAAC 2.7.04.01 Completion Package (Unit 3)
5. ITAAC 2.7.04.01 Completion Package (Unit 4)
6. NEI 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"