|
---|
Category:Letter type:ND
MONTHYEARND-24-0103, (Vegp), Unit 4 - Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2024-04-26026 April 2024 (Vegp), Unit 4 - Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-24-0114, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-04-0101 April 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-24-0059, (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-03-0404 March 2024 (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0693, (Vegp), Unit 4 - Combined License (COL) License Condition 2.D.(4)(d) Completion of Initial Criticality and Low-Power Tests2024-02-15015 February 2024 (Vegp), Unit 4 - Combined License (COL) License Condition 2.D.(4)(d) Completion of Initial Criticality and Low-Power Tests ND-23-0690, (Vegp), Unit 4 - Combined License (COL) License Condition 2.D.(3)(e) Completion of Pre-Critical Tests2024-02-0808 February 2024 (Vegp), Unit 4 - Combined License (COL) License Condition 2.D.(3)(e) Completion of Pre-Critical Tests ND-24-0019, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-02-0101 February 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0912, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-01-0202 January 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0881, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-12-0404 December 2023 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0817, (Vegp), Units 3 and 4 - Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a)2023-11-17017 November 2023 (Vegp), Units 3 and 4 - Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a) ND-23-0823, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-11-0303 November 2023 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0723, (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-10-0404 October 2023 (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0697, (Vegp), Unit 4, Submittal of Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-09-0505 September 2023 (Vegp), Unit 4, Submittal of Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0669, (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-08-0707 August 2023 (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0205, (Vegp), Unit 3 - Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2023-07-28028 July 2023 (Vegp), Unit 3 - Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-23-0618, Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797)2023-07-20020 July 2023 Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797) ND-23-0609, Notification of Completion of All ITAAC2023-07-20020 July 2023 Notification of Completion of All ITAAC ND-23-0608, ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72) ND-23-0607, ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13) ND-22-0796, ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813) ND-23-0459, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587) ND-23-0162, ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165) ND-23-0575, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588) ND-23-0439, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07a.i (Index Number 265)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07a.i (Index Number 265) ND-23-0552, Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624)2023-07-18018 July 2023 Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624) ND-23-0483, ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4) ND-23-0586, ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159)2023-07-17017 July 2023 ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159) ND-23-0610, ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603)2023-07-17017 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603) ND-23-0573, ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497) ND-23-0406, ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498) ND-22-0816, ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19)2023-07-15015 July 2023 ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19) ND-23-0603, ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831) ND-23-0446, ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250) ND-23-0594, ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629) ND-23-0601, ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719) ND-23-0606, ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557) ND-23-0476, ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355) ND-23-0499, ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700) ND-23-0122, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668) ND-23-0121, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667) ND-23-0597, ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530) ND-23-0002, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270) ND-23-0588, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78) ND-23-0111, ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646) ND-22-0980, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75) ND-23-0587, ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595) ND-23-0461, ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652) ND-23-0543, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622) ND-23-0394, ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703) ND-23-0592, ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726) ND-23-0589, ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601) 2024-04-26
[Table view] Category:Licensee 30-Day Written Event Report
[Table view] |
Text
Southern Nuclear Operating Company, Inc.
42 Inverness Center Parkway Birmingham, AL 35242 April 26, 2018 Docket Nos.: 52-025 ND-18-0494 52-026 10 CFR 50.46(a)(3)(ii)
U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 10 CFR 50.46 Thirty Day Report Ladies and Gentlemen:
The purpose of this letter is to provide a required report in accordance with 10 CFR 50.46, "Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors," for the Vogtle Electric Generating Plant (VEGP) Units 3 and 4 combined licenses (COLs), License Nos. NPF-91 and NPF-92, respectively.
On March 31, 2017, Southern Nuclear Operating Company (SNC) submitted license amendment request (LAR)-17-009 [ML17090A209]. The requested amendment proposed changes to UFSAR Tier 2 and COL Appendix C (and plant-specific Tier 1) information with regard to the passive core cooling system (PXS) low pressure injection and fourth-stage automatic depressurization system (ADS) flow resistances.
On February 28, 2018, the NRC approved the changes proposed in LAR-17-009 as Amendment No. 111 for Vogtle Unit 3 and Amendment No. 110 for Vogtle Unit 4 [ADAMS Package -
ML18026A565]. SNC incorporated these amendments into the Vogtle 3&4 Licensing Basis via licensing document change request (LDCR)-2017-040 on March 28, 2018. Analyses performed by Westinghouse Electric Company (WEC) have shown that the design changes associated with LAR-17-009 result in an estimated peak clad temperature (PCT) increase of 144°F for the small break loss-of-coolant accident (SBLOCA) transient. This increase is in addition to SBLOCA PCT increases of 32°F and 13°F reported in WEC letter DCP_NRC_003328 dated March 23, 2018 [ML18086A025], as referenced in SNC letter ND-18-0393 dated April 6, 2018
[ML18096A283].
The attachment to this letter provides the background, affected evaluation model, estimated effect for the changes, and an updated SBLOCA PCT rackup sheet. The attachment refers to LAR-114 and LAR-133, which are Westinghouses LAR numbers for SNC LAR-16-012 and LAR-17-009, respectively.
A full SBLOCA reanalysis is scheduled to be performed and implemented in an upcoming LAR.
The LAR will incorporate cumulative design changes, including those from LAR-16-012 and
U.S. Nuclear Regulatory Commission ND-18-0494 Page 2 of4 LAR-17-009, and update the licensing basis accordingly. This LAR is currently scheduled to be submitted April 16, 2019.
Southern Nuclear Operating Company's (SNC's) COLs for VEGP Units 3 and 4 incorporate by reference Appendix D to 10 CFR Part 52, and thus, utilize the Peak Cladding Temperature (PCT) calculations performed by WEC. Therefore, the PCT calculations performed by WEC are applicable to the VEGP Units 3 and 4 COLs.
If there are any questions regarding this report, please contact Mr. Wesley Sparkman at (205) 992-5061.
Respectfully submitted,
Attachment:
10 CFR 50.46 30-Day Report Content for the AP1 000 Vogtle Units 3 & 4 SBLOCA Analysis of Record
U.S. Nuclear Regulatory Commission ND-18-0494 Page 3 of 4 Southern Nuclear Operating Company / Georgia Power Company Mr. S. E. Kuczynski (w/o attachment)
Mr. M. D. Rauckhorst Mr. D. G. Bost (w/o attachment)
Mr. M. D. Meier (w/o attachment)
Mr. D. H. Jones (w/o attachment)
Mr. J. B. Klecha Mr. G. Chick Mr. D. L. McKinney (w/o attachment)
Mr. T. W. Yelverton (w/o attachment)
Mr. B. H. Whitley Ms. C. A. Gayheart Mr. C. R. Pierce Ms. A. G. Aughtman Mr. D. L. Fulton Mr. M. J. Yox Mr. J. Tupik Mr. W. A. Sparkman Ms. A. C. Chamberlain Ms. A. L. Pugh Mr. F. J. Redwanz Document Services RTYPE: VND.LI.L00 File AR.01.02.06 Nuclear Regulatory Commission Mr. W. Jones (w/o attachment)
Ms. J. Dixon-Herrity Mr. C. Patel Ms. J. M. Heisserer Mr. B. Kemker Mr. G. Khouri Ms. S. Temple Mr. F. Brown Mr. T.E. Chandler Ms. P. Braxton Mr. T. Brimfield Mr. C. J. Even Mr. A. Lerch State of Georgia Mr. R. Dunn
U.S. Nuclear Regulatory Commission ND-18-0494 Page 4 of 4 Oglethorpe Power Corporation Mr. M. W. Price Mr. K. T. Haynes Ms. A. Whaley Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Mr. L. Oriani (w/o attachment)
Mr. G. Koucheravy (w/o attachment)
Mr. M. Corletti Mr. M. L. Clyde Ms. L. Iller Mr. D. Hawkins Mr. J. Coward Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. A. Matis, Tetra Tech NUS, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.
Mr. S. Roetger, Georgia Public Service Commission Ms. S. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham Mr. R. Grumbir, APOG NDDocumentinBox@duke-energy.com, Duke Energy Mr. S. Franzone, Florida Power & Light
Southern Nuclear Operating Company ND-18-0494 Attachment Vogtle Electric Generating Plant (VEGP) Units 3 and 4 10 CFR 50.46 30-Day Report Content for the AP1000 Vogtle Units 3&4 SBLOCA Analysis of Record (This Attachment consists of 3 pages, including this cover page.)
ND-18-0494 Attachment 10 CFR 50.46 30-Day Report Content for the AP1000 Vogtle Units 3 & 4 SBLOCA Analysis of Record Page 2 of 3 AP1000 PLANT LAR-133 EVALUATION
Background
The design changes associated with License Amendment Request (LAR) 133 are changes to automatic depressurization system (ADS) Stages 1, 2, 3, and 4 line resistances and in-containment refueling water storage tank (IRWST) line resistances. These changes impact the AP1000 plant small break loss-of-coolant accident (SBLOCA) analysis. These items represent changes in plant configuration or associated set points, distinguished from an evaluation model change in Section 4 of WCAP-13451 [1].
Affected Evaluation Model(s) 1985 Westinghouse Advanced Plant Small Break LOCA Evaluation Model with NOTRUMP.
Estimated Effect Updated SBLOCA calculations using the latest limiting SBLOCA transient have been performed to assess the impact of the changes to the ADS Stages 1 - 4 and IRWST injection line resistances associated with LAR-133. The updated calculations resulted in a 144°F PCT penalty, which is assessed against the AP1000 Core Reference Report analysis [2].
References
- 1. WCAP-13451, Westinghouse Methodology for Implementation of 10 CFR 50.46 Reporting, October 1992.
- 2. WCAP-17524-P-A, Revision 1, AP1000 Core Reference Report, May 2015.
AP1000 is a trademark or registered trademark of Westinghouse Electric Company LLC, its affiliates and/or its subsidiaries in the United States of America and may be registered in other countries throughout the world. All rights reserved. Unauthorized use is strictly prohibited. Other names may be trademarks of their respective owners.
ND-18-0494 Attachment 10 CFR 50.46 30-Day Report Content for the AP1000 Vogtle Units 3 & 4 SBLOCA Analysis of Record Page 3 of 3 Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Small Break Plant Name: AP1000 - Vogtle Units 3 & 4 Utility Name: Southern Nuclear Operating Company Revision Date: 3/14/2018 Analysis Information EM: NOTRUMP-AP Analysis Date: 8/26/2013 Limiting Break Size: 2 Inch FQ: 2.6 FdH: 1.75 Fuel: RFA SGTP (%): 10 Notes:
Clad Temp (°F) Ref. Notes LICENSING BASIS Analysis-Of-Record PCT 663.5 1 PCT ASSESSMENTS (Delta PCT)
A. PRIOR ECCS MODEL ASSESSMENTS 1 . NOTRUMP Bubble Rise/Drift Flux Model Inconsistencies 32 2 B. PLANNED PLANT MODIFICATION EVALUATIONS 1 . LAR-114 Evaluation 13 3, 4, 5 (a) 2 . LAR-133 Evaluation 144 6, 7 (b)
C. 2018 ECCS MODEL ASSESSMENTS 1 . None 0 D. OTHER*
1 . None 0 LICENSING BASIS PCT + PCT ASSESSMENTS PCT = 852.5
- It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.
References 1 . WCAP-17524-P-A, Revision 1, AP1000 Core Reference Report, May 2015.
2 . LTR-LIS-15-5, "Updates to the AP1000 Plant SBLOCA 10 CFR 50.46 PCT Rackups," January 2015.
3 . LTR-LIS-16-144, "Update to the AP1000 Plant SBLOCA 10 CFR 50.46 PCT Rackups for LAR-114," January 2017.
4 . LTR-LIS-17-59, "AP1000 Plant 10 CFR 50.46 Annual Notification and Reporting for 2016," March 2017.
5 . ND-16-0984 (ML16207A340), Automatic Depressurization System (ADS) Stage 2, 3 & 4 Valve Flow Area Changes and Clarifications (LAR-16-012), July 2016. Approved by NRC December 29, 2016 as Amendment 62 (ML16357A640).
6 . LTR-LIS-16-429, Update of the AP1000 Plant SBLOCA 10 CFR 50.46 PCT Rackups for LAR-133, January 2017.
7 . ND-17-0443 (ML17090A209), PXS/ADS Line Resistance Changes (LAR-17-009), March 2017. Approved by NRC February 28, 2018 as Amendments 111 (VEGP Unit 3) and 110 (VEGP Unit 4) (ML18026A566/ML18026A571).
Notes:
(a) The LAR-114 evaluation assesses the impact of reduced automatic depressurization system (ADS) Stage 2, 3, and 4 flow areas described in design change proposals (DCPs) 5051 and 5054.
(b) The LAR-133 evaluation assesses the impact of updated ADS Stages 1 - 4 and In-Containment Refueling Water Storage Tank (IRWST) line resistances described in DCPs 4903 and 5138.