IR 05000327/2026420

From kanterella
(Redirected from ML26043A239)
Jump to navigation Jump to search
Security Baseline Cover Ltr. and Report 05000327/2026420, 05000328/2026420
ML26043A239
Person / Time
Site: Sequoyah  
Issue date: 02/20/2026
From: David Hostetter
Security Performance Evaluation Branch
To: Michael K
Tennessee Valley Authority
Shared Package
ML26043A234 List:
References
ML26043A234 IR 2026420
Download: ML26043A239 (0)


Text

SUBJECT:

SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000327/2026420 AND 05000328/2026420

Dear Kevin Michael:

On January 29, 2026, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Sequoyah Nuclear Plant, Units 1 and 2. On January 29, 2026, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jefferson K. Clark, Chief Security Performance Evaluation Branch Division of Security Operations Docket Nos. 05000327 and 05000328 License Nos. DPR-77 and DPR-79

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000327 and 05000328

License Numbers:

DPR-77 and DPR-79

Report Numbers:

05000327/2026420 and 05000328/2026420

Enterprise Identifier:

I-2026-420-0000

Licensee:

Tennessee Valley Authority

Facility:

Sequoyah Nuclear Plant, Units 1 and 2

Location:

Soddy Daisy, TN

Inspection Dates:

January 05, 2026, to January 30, 2026

Inspectors:

J. Berry, Team Leader, NSIR

M. Hein, Physical Security Inspector, RIV

D. Hostetter, Senior Physical Security Inspector, NSIR

J. Justice, Senior Physical Security Inspector, RII

Approved By:

Jefferson K. Clark, Chief

Security Performance Evaluation Branch

Division of Security Operations

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Sequoyah Nuclear Plant, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.03 - Contingency Response - Force-On-Force Testing

Contingency Response - Force-On-Force Testing (1 Sample)

(1) NRC inspectors completed the Contingency Response - Force-on-Force (FOF)

Testing inspection procedure by evaluating the licensees performance in implementing the physical protection program to detect, assess, interdict, and neutralize threats up to, and including, the design basis threat of radiological sabotage. One NRC-evaluated FOF exercise was conducted for the evaluation.

REPORT ATTACHMENTS

Supplemental Information for the report is considered Safeguards Information and is located separately within the NRCs Safeguards Information Local Area Network and Electronic Safe database (SLES), under NS125325.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On January 29, 2026, the inspectors presented the security baseline inspection results to Kevin Michael, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CR-2060042

CR-2064275

CR-2064357

CR-2064359

CR-2064363

CR-2064367

CR-2064370

CR-2064376

CR-2064386

CR-2064393

CR-2064394

CR-2064396

CR-2064402

CR-2064403

CR-2064404

Corrective Action

Documents

Resulting from

Inspection

CR-2064406

JIT Adversary

Controller Training

NEI 05-05 Revision 7 Changes

11/25/2025

Sequoyah Nuclear

Plant Security

Analysis

Temp Vent Covers for SQN

01/05/2026

Sequoyah Nuclear

Plant Security

Analysis

Egress Concrete Structure (Door)

01/08/2026

71130.03

Miscellaneous

Sequoyah Nuclear

Plant Security

Analysis

Barrier Island Analysis for Floor Joist

01/06/2026

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CDQ000999-

2004002

MSSD Circles for AQN

Revision 003

CDQ000999-

2004002

Engineering and Modifications to comply with April 2003 DBT

Security Order MSSD Circle Key

Revision 0

LP-SEC-ANN-001

TVA SAAB Training Initial and Annual Requirement, LMS

500004510

Revision 3

LP-SEC-ANN-001

TVA Controller Training, LMS 81545 and 81974

Revision 4

LP-SEC-ANN-006

Task 16, Use of Force, LMS 50004520

Revision 5

LP-SEC-TSK-009

Conduct Security Communications, LMS Module 81950

Revision 16

LP-SEC-TSK-18

Operate Base & Security Communications, LMS Module

81959

Revision 13

NPG-SPP-14.4

Nuclear Security

Revision 0014

NSD-27

Conduct of Security Drills and Exercise/Performance

Evaluation Program

Revision 0019

NSDP-18

Administration of Security Training

Revision 0022

NSDP-7.1

Security Shift Supervision

Revision 0003

NSDP-7.2

Motor Patrols

Revision 0002

Protective Strategy Sequoyah Nuclear Plant Protective Strategy

Revision 25

Sequoyah Nuclear

Plant

Target Sets

Revision 17

Procedures

Physical Security

Plan

Sequoyah Nuclear Plant Security Plan, Training and

Qualification Plan, Safeguards Contingency Plan, and

Independent Spent Fuel Storage Installation Security Program

Revision 25

ML26043A234; ML26043A239

OFFICE

NSIR/DSO/SPEB

R-II/DFRSS/NSB

NSIR/DSO/SPEB

/ETB

NSIR/DSO/SPEB

/ETA

NAME

DHostetter

JJustice

JBerry

JClark

DATE

Feb 12, 2026

Feb 17, 2026

Feb 19, 2026

Feb 20, 2026