ML25344A040

From kanterella
Jump to navigation Jump to search

Letter to Applicant for NOA Draft SEIS
ML25344A040
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 12/31/2025
From: Stephen Koenick
NRC/NMSS/DREFS/EPMB1
To: Basta L
Duke Energy Progress
References
EPID L-2025-SLE-0000
Download: ML25344A040 (0)


Text

Laura Basta Site Vice President H. B. Robinson Steam Electric Plant Duke Energy Progress, LLC 3581 West Entrance Road, RNPA11 Hartsville, SC 29550

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENT 13, SECOND RENEWAL, TO THE GENERIC ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF NUCLEAR PLANTS (EPID NUMBER: L-2025-SLE-0000)

(DOCKET NUMBER: 50-261)

Dear Laura Basta:

The U.S. Nuclear Regulatory Commission (NRC) staff has prepared Draft Supplement 13, Second Renewal, to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437), regarding H. B. Robinson Steam Electric Plant, Unit 2 (RNP).

The draft supplemental environmental impact statement (DSEIS) includes the NRC staffs evaluation of the environmental impacts of the subsequent license renewal (SLR) issues applicable to RNP. The DSEIS considers information contained in Duke Energy Progress, LLC (Dukes) SLR application (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML25091A290). The NRC staff prepared the DSEIS in accordance with NRC regulations and federal law.

The NRC staff has prepared a Federal Register Notice (FR) of Availability to advise the public that the DSEIS is publicly available in ADAMS at accession number ML25344A144. ADAMS is accessible from the NRC website at https://www.nrc.gov/reading-rm/adams.html. In addition, the DSEIS will be available to the public near the site at the Hartsville Memorial Library, 147 West College Ave., Hartsville, SC 29550.

Based on the staffs evaluation in the DSEIS, the NRC staffs preliminary conclusion is there are no environmental reasons for energy-planning decisionmakers to prevent RNP from continuing to operate for an additional 20 years. The NRC staff based its recommendation on the following:

1) Dukes environmental report; 2) the NRC staffs consultation with Federal, State, Tribal, and local governmental agencies; 3) the NRC staffs independent environmental review; and 4) the NRC staffs consideration of public comments received during the scoping process.

December 30, 2025

L. Basta 2

A separate Notice of Availability of the DSEIS will be placed in the FR through the U.S.

Environmental Protection Agency (EPA). The 45-day public comment period end date is calculated from the date on which the EPA notice is published in the FR, expected January 9, 2026.

Should you have any questions concerning the NRC staffs environmental review of this SLR application, please contact Karen Loomis, via email at karen.loomis@nrc.gov.

Sincerely, Stephen S. Koenick, Chief Environmental Project Management Branch 1 Division of Rulemaking, Environmental, and Financial Support Office of Nuclear Material Safety and Safeguards Docket No. 50-261 cc: Listserv Signed by Koenick, Stephen on 12/30/25

L. Basta 3

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - NOTICE OF AVAILABILITY OF THE DRAFT SUPPLEMENT 13, SECOND RENEWAL, TO THE GENERIC ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF NUCLEAR PLANTS (EPID NUMBER: L-2025-SLE-0000)

(DOCKET NUMBER: 50-261)

DATED:

DISTRIBUTION:

PUBLIC RidsNrrDnrl Resource RidsACRS_MailCTR Resource RidsRgn2MailCenter Resource RidsRgn2Drp Resource RidsRgn2Drs Resource RidsRgn2Ora Resource RidsRgn2Opa Resource RidsNrrOd Resource MYoo, NRR/DNRL LBauer, NRR/DNRL RPenmetsa, NRR/DNRL MSampson, NRR/DNRL DRoth, OGC SBurnell, HQ/OPA LWilkins, RII/OCA NJordan, DORL JZeiler, RII/DORS CDorman, RII/DORS DGasperson, RII/OPA JPelchat, RII/FCO KHenry, RII/FCO EMAIL:

LBasta, Duke DRoberts, Duke EGlenn, Duke MPyne, Duke ADAMS Accession Number: ML25344A040

  • via email OFFICE NMSS/REFS NMSS/REFS NMSS/REFS NAME KLoomis AWalker-Smith SKoenick DATE 12/9/2025 12/9/2025 12/30 /2025 OFFICIAL RECORD COPY December 30, 2025