Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2025005 and 05000278/2025005)
ML25239B558
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/28/2025
From: Nicole Warnek
Division of Operating Reactors
To: Rhoades D
Constellation Energy Generation
References
IR 2025005
Download: ML25239B558 (1)


Text

August 28, 2025

SUBJECT:

UPDATED INSPECTION PLAN FOR PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (REPORT 05000277/2025005 AND 05000278/2025005)

Dear David Rhoades:

The enclosed inspection plan lists the inspections scheduled through June 30, 2027, for Peach Bottom Atomic Power Station, Units 2 and 3. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. As discussed in SECY-25-0045, Recommendations for Revising the Reactor Oversight Process, dated June 5, 2025 (ML25042A278), the NRC determined that a broad, comprehensive review of the Reactor Oversight Process (ROP) is necessary to reflect improvements in industry performance and advancements in technology. The outcome of the comprehensive review and recommendations to revise the ROP baseline inspection program, when approved by the NRC Commission, will require a revision to this inspection plan. The NRC will contact you as soon as possible to discuss any revisions after the new baseline inspection program is implemented.

The NRC plans to perform Inspection Procedure 92702, Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders, in January 2026. In addition, the NRC plans to conduct an inspection of your modification of instrumentation and control systems to digital in accordance with Inspection Procedure 52003, Digital Instrumentation and Control Modification Inspection. The specific schedule to be used for this inspection is being developed by NRC staff to coincide with specific milestones and activities in your project plan. NRC staff will communicate the specific schedule with you as it is identified.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-6954 with any questions you have regarding this letter.

Sincerely, Nicole S. Warnek, Chief Projects Branch 3 Division of Operating Reactor Safety

Docket Nos. 05000277 and 05000278 License Nos. DPR44 and DPR-56

Enclosure:

Peach Bottom Inspection Plan

cc w/encl: Distribution via ListServ NICOLE WARNEK Digitally signed by NICOLE WARNEK Date: 2025.08.28 06:46:12 -04'00'

ML25239B558

SUNSI Review

Non-Sensitive Sensitive

Publicly Available Non-Publicly Available

OFFICE RI/DORS RI/DORS

NAME JBresson NWarnek

DATE 8/27/2025 8/27/2025

Site Inspection Activity Plan Peach Bottom 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count PI&R Biennial Team Inspection - Peach Bottom

2,3 9/8/2025 9/12/2025 IP 71152B 000747 Problem Identification and Resolution 2,3 9/22/2025 9/26/2025 IP 71152B 000747 Problem Identification and Resolution RP - 71124.06 RETS

2,3 10/6/2025 10/10/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Inservice Inspection - Peach Bottom Unit 3

3 10/13/2025 10/24/2025 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP - 71124.01 Rad. Hazards

3 10/27/2025 10/31/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls ISFSI - IP 60859 License Renewal, Peach Bottom

2,3 11/3/2025 11/4/2025 IP 60859 Independent Spent Fuel Storage Installation (ISFSI) License Renewal Inspection RP -71124.08 Rad Waste and Part 37

2,3 12/1/2025 12/31/2025 IP 71151 000746 Performance Indicator Verification 2,3 12/8/2025 12/12/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Access Control, AA, FFD, Sec Plan Review, PI, ISFSI - PB

2,3 1/5/2026 1/9/2026 IP 71130.01 000733 Access Authorization 2,3 1/5/2026 1/9/2026 IP 71130.02 000734 Access Control 2,3 1/5/2026 1/9/2026 IP 71130.08 000740 Fitness-For-Duty Program 2,3 1/5/2026 1/9/2026 IP 71130.09 001656 Security Plan Changes 2,3 1/5/2026 1/9/2026 IP 71151 001338 Performance Indicator Verification 2,3 1/5/2026 1/9/2026 IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations 2,3 1/5/2026 1/9/2026 IP 92702 001436 Follow-Up on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, and Orders Age Related Degradation - Peach Bottom

2,3 1/26/2026 1/30/2026 IP 71111.21N.04 001832 Age-Related Degradation 2,3 2/2/2026 2/6/2026 IP 71111.21N.04 001832 Age-Related Degradation 2,3 2/9/2026 2/13/2026 IP 71111.21N.04 001832 Age-Related Degradation Cyber Security - Peach Bottom

2,3 3/16/2026 3/20/2026 IP 71130.10 000741 Cybersecurity RP - 71124.03 Resp. Protection and 71124.04 Occupational Dose

2,3 4/20/2026 4/24/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2,3 4/20/2026 4/24/2026 IP 71124.04 000728 Occupational Dose Assessment Prepared on 7/28/2025 3:10:25 PM 1 of 3

Site Inspection Activity Plan EP Exercise Inspection - Peach Bottom

2,3 4/27/2026 5/1/2026 IP 71114.01 000716 Exercise Evaluation 2,3 4/27/2026 5/1/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2,3 4/27/2026 5/1/2026 IP 71151 001397 Performance Indicator Verification 2026 Peach Bottom Initial Operator Licensing Exam

2,3 4/13/2026 4/17/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

2,3 5/11/2026 5/15/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - PB

2,3 5/11/2026 5/15/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 2,3 6/1/2026 6/5/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing RP - 71124.07 REMP

2,3 9/14/2026 9/18/2026 IP 71124.07 000731 Radiological Environmental Monitoring Program Inservice Inspection - Peach Bottom Unit 2

2 10/19/2026 10/23/2026 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP - 71124.01 Rad Hazards

2 10/26/2026 10/30/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls RP - 71151 PIV

2,3 11/16/2026 11/18/2026 IP 71151 000746 Performance Indicator Verification Comprehensive Engineering Team Inspection

2,3 1/25/2027 1/29/2027 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 2,3 2/8/2027 2/12/2027 IP 71111.21M 000713 Comprehensive Engineering Team Inspection EP Program Inspection - Peach Bottom

2,3 2/22/2027 2/26/2027 IP 71114.02 000717 Alert and Notification System Testing 2,3 2/22/2027 2/26/2027 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 2,3 2/22/2027 2/26/2027 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 2,3 2/22/2027 2/26/2027 IP 71114.05 000720 Maintenance of Emergency Preparedness 2,3 2/22/2027 2/26/2027 IP 71151 001397 Performance Indicator Verification Sec - Access Control, Equipment Testing and Maintenance, Training, SPR, PI - PB

2,3 3/22/2027 3/26/2027 IP 71130.02 000734 Access Control 2,3 3/22/2027 3/26/2027 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 2,3 3/22/2027 3/26/2027 IP 71130.07 000739 Security Training 2,3 3/22/2027 3/26/2027 IP 71130.09 001656 Security Plan Changes 2,3 3/22/2027 3/26/2027 IP 71151 001338 Performance Indicator Verification 2027 Peach Bottom Initial Operator Licensing Exam

2,3 4/12/2027 4/16/2027 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

2,3 5/17/2027 5/21/2027 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

Prepared on 7/28/2025 3:10:25 PM 2 of 3

Site Inspection Activity Plan Peach Bottom 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count Security ISFSI - PB

1/5/2026 1/9/2026 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations Prepared on 7/28/2025 3:10:25 PM 3 of 3