IR 05000277/2025401

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000277/2025401 and 05000278/2025401
ML25161A006
Person / Time
Site: Peach Bottom  
Issue date: 06/10/2025
From: Brice Bickett
Decommissioning, ISFSI, and Reactor Health Physics Branch
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2025401
Download: ML25161A006 (1)


Text

June 10, 2025

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - SECURITY BASELINE INSPECTION REPORT 05000277/2025401 AND 05000278/2025401

Dear David Rhoades:

On May 22, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Peach Bottom Atomic Power Station, Units 2 and 3, and discussed the results of this inspection with Martin A. Bonifanti, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Brice A. Bickett, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security

Docket Nos. 05000277 and 05000278 License Nos. DPR-44 and DPR-56

Enclosure:

As stated

BRICE BICKETT Digitally signed by BRICE BICKETT Date: 2025.06.10 11:45:13 -04'00'

Inspection Report

Docket Numbers:

05000277 and 05000278

License Numbers:

DPR-44 and DPR-56

Report Numbers:

05000277/2025401 and 05000278/2025401

Enterprise Identifier: I-2025-401-0021

Licensee:

Constellation Energy Generation, LLC

Facility:

Peach Bottom Atomic Power Station, Units 2 and 3

Location:

Delta, PA

Inspection Dates:

May 19, 2025 to May 22, 2025

Inspectors:

K. Hussar, Senior Physical Security Inspector

C. Davis, Physical Security Inspector

J. Edwards, Physical Security Inspector

G. Stock, Reactor Operations Engineer

Approved By:

Brice A. Bickett, Chief

Security, Emergency Preparedness and Incident Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Peach Bottom Atomic Power Station, Units 2 and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

===inspection elements:

Access Control===

(1) Tier I: All Requirements Tier II: All Requirements Tier III: 1 Requirement (02.10)

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:

Protective Strategy Evaluation (2 Samples)

(1) Tier I: All Requirements Tier II: 18 Requirements (02.05 a, 02.06 a, c, d, f - n, 02.07 a - e)

Tier III: All Requirements

(2) The Inspectors evaluated the Security Performance Evaluation Program.

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following

===procedure elements:

Security Plan Changes===

(1) Since the last NRC baseline inspection of this program area, Security Plan Revision 24 was implemented. Based on Constellation's evaluation, and in accordance with 10 CFR 50.54(p)(2), the change(s) resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan change(s)continues to meet the requirements of 10 CFR 73.55(b). The inspector(s) conducted a review of the security plan change(s) to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of those change(s). Therefore, the change(s) remain subject to future NRC inspection in their entirety.

71130.14 - Review of Power Reactor Target Sets

The inspectors evaluated the Security Target Set Program. The following elements were

===evaluated:

Review of Power Reactor Target Sets===

(1)03.01, 03.02 (a-f), 03.03, 03.04 (a-b),

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) September 1, 2024 through April 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On May 22, 2025, the inspectors presented the security baseline inspection results to Martin A. Bonifanti, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.02

Procedures

SY-AA-101-117

Processing and Escorting of Personnel and Vehicles

Revision 34

SY-AA-101-120

Control of Security Access Control Devices

Revision 10

SY-PB-101-102-

F-01

Protected and Vital Area Access Log

Revision 1

SY-PB-101-112-

1001

Search Processes

Revision 12

SY-PB-101-124-

1001

Security Control Center Operations

Revision 18

71130.05

Corrective Action

Documents

04809815

04810435

04844361

04804156

04805016

04808534

Corrective Action

Documents

Resulting from

Inspection

04867793

Procedures

SY-AA-101-103

Observation and Inspection of Security Barriers

Revision 14

SY-AA-101-109

Response to Contingency Events

Revision 17

SY-AA-101-116

Conducting Patrols

Revision 18

SY-AA-500-127

Safety/Security Interface

Revision 7

SY-PB-101-116-

1001

Security Patrols

Revision 19

SY-PB-101-501

Site Protective Strategy

Revision 13

Self-Assessments NOSA-PEA-23-01 2023 Security Programs Audit Report

2/22/2023

NOSA-PEA-25-01 2025 Security Programs Audit Report

2/19/2025

71130.09

Miscellaneous

Physical Security Plan

Revision 24

71130.14

Corrective Action

Documents

4848183

Corrective Action

Documents

4867215

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Resulting from

Inspection

Engineering

Changes

EC 639893

Evaluate Beyond Design Basis Postulated ESW Pipe Break

Procedures

SY-AA-101-502

Target Set Analysis and Development

71151

Procedures

SY-AA-101-155

Security Events and Nuclear Regulatory Commission

Performance Indicators

Revision 11