June 10, 2025
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 - SECURITY BASELINE INSPECTION REPORT 05000277/2025401 AND 05000278/2025401
Dear David Rhoades:
On May 22, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Peach Bottom Atomic Power Station, Units 2 and 3, and discussed the results of this inspection with Martin A. Bonifanti, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Brice A. Bickett, Chief Security, Emergency Preparedness and Incident Response Branch Division of Radiological Safety and Security
Docket Nos. 05000277 and 05000278 License Nos. DPR-44 and DPR-56
Enclosure:
As stated
BRICE BICKETT Digitally signed by BRICE BICKETT Date: 2025.06.10 11:45:13 -04'00'
Inspection Report
Docket Numbers:
05000277 and 05000278
License Numbers:
Report Numbers:
05000277/2025401 and 05000278/2025401
Enterprise Identifier: I-2025-401-0021
Licensee:
Constellation Energy Generation, LLC
Facility:
Peach Bottom Atomic Power Station, Units 2 and 3
Location:
Delta, PA
Inspection Dates:
May 19, 2025 to May 22, 2025
Inspectors:
K. Hussar, Senior Physical Security Inspector
C. Davis, Physical Security Inspector
J. Edwards, Physical Security Inspector
G. Stock, Reactor Operations Engineer
Approved By:
Brice A. Bickett, Chief
Security, Emergency Preparedness and Incident Response Branch
Division of Radiological Safety and Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Peach Bottom Atomic Power Station, Units 2 and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.02 - Access Control
The inspectors evaluated the access control program through completion of the following
===inspection elements:
Access Control===
- (1) Tier I: All Requirements Tier II: All Requirements Tier III: 1 Requirement (02.10)
71130.05 - Protective Strategy Evaluation
The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:
Protective Strategy Evaluation (2 Samples)
- (1) Tier I: All Requirements Tier II: 18 Requirements (02.05 a, 02.06 a, c, d, f - n, 02.07 a - e)
Tier III: All Requirements
- (2) The Inspectors evaluated the Security Performance Evaluation Program.
71130.09 - Security Plan Changes
The inspectors evaluated the security plan changes through completion of the following
===procedure elements:
Security Plan Changes===
- (1) Since the last NRC baseline inspection of this program area, Security Plan Revision 24 was implemented. Based on Constellation's evaluation, and in accordance with 10 CFR 50.54(p)(2), the change(s) resulted in no decrease in safeguards effectiveness of the security plan and the revised security plan change(s)continues to meet the requirements of 10 CFR 73.55(b). The inspector(s) conducted a review of the security plan change(s) to evaluate for a potential decrease in safeguards effectiveness of the security plan; however, this review does not constitute formal NRC approval of those change(s). Therefore, the change(s) remain subject to future NRC inspection in their entirety.
71130.14 - Review of Power Reactor Target Sets
The inspectors evaluated the Security Target Set Program. The following elements were
===evaluated:
Review of Power Reactor Target Sets===
(1)03.01, 03.02 (a-f), 03.03, 03.04 (a-b),
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)
=
- (1) September 1, 2024 through April 30,
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On May 22, 2025, the inspectors presented the security baseline inspection results to Martin A. Bonifanti, Site Vice President, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Procedures
Processing and Escorting of Personnel and Vehicles
Revision 34
Control of Security Access Control Devices
Revision 10
SY-PB-101-102-
F-01
Protected and Vital Area Access Log
Revision 1
SY-PB-101-112-
1001
Search Processes
Revision 12
SY-PB-101-124-
1001
Security Control Center Operations
Revision 18
Corrective Action
Documents
04809815
04810435
04844361
04804156
04805016
04808534
Corrective Action
Documents
Resulting from
Inspection
04867793
Procedures
Observation and Inspection of Security Barriers
Revision 14
Response to Contingency Events
Revision 17
Conducting Patrols
Revision 18
Safety/Security Interface
Revision 7
SY-PB-101-116-
1001
Security Patrols
Revision 19
SY-PB-101-501
Site Protective Strategy
Revision 13
Self-Assessments NOSA-PEA-23-01 2023 Security Programs Audit Report
2/22/2023
NOSA-PEA-25-01 2025 Security Programs Audit Report
2/19/2025
Miscellaneous
Physical Security Plan
Revision 24
Corrective Action
Documents
4848183
Corrective Action
Documents
4867215
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Resulting from
Inspection
Engineering
Changes
Evaluate Beyond Design Basis Postulated ESW Pipe Break
Procedures
Target Set Analysis and Development
71151
Procedures
Security Events and Nuclear Regulatory Commission
Performance Indicators
Revision 11