MONTHYEARPMNS20250218, Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes2025-02-12012 February 2025 Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes Project stage: Approval NL-25-0030, License Amendment Request: Addition of RCS Tcold Engineered Safety Feature Actuation System (ESFAS) Instrumentation Function2025-02-14014 February 2025 License Amendment Request: Addition of RCS Tcold Engineered Safety Feature Actuation System (ESFAS) Instrumentation Function Project stage: Request ML25055A2532025-03-0303 March 2025 SNC Slides - SNC Presentation - Public Meeting on March 3, 2025 - Proposed Vogtle 3 and 4 PRHR LAR Project stage: Meeting ML25079A3312025-03-0606 March 2025, 18 March 2025, 1 April 2025 Summary of March 18, 2025, Follow-Up Observation Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request to Change Table 3.3.8-1 for Vogtle Electric Generating Plant, Units 3 and 4 Project stage: Request PMNS20250291, Follow-Up Meeting - Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes2025-03-0606 March 2025 Follow-Up Meeting - Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes Project stage: Meeting ML25071A1022025-03-18018 March 2025 SNC Presentation Material - Public Meeting - Vogtle 3 and 4 - PRHR LAR - ISG-06 Applicability Table - 2025-03-18 Project stage: Meeting ML25071A1032025-03-18018 March 2025 SNC Presentation Material - Public Meeting - Vogtle 3 and 4 - PRHR LAR - UFSAR 6.3.3.4.1 Markup - 2025-03-18 Project stage: Meeting ML25073A1032025-03-18018 March 2025 SNC Slides - Revised - Public Meeting on March 18, 2025 - Proposed Vogtle 3 and 4 PRHR LAR Project stage: Meeting ML25071A1042025-03-18018 March 2025 SNC Slides -Public Meeting - Vogtle 3 and 4 - PRHR Actuation LAR - 2025-03-18 Project stage: Meeting ML25063A1902025-03-19019 March 2025 Summary of Observation Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request to Change Table 3.3.8 1 for Vogtle Electric Generating Plant, Units 3 and 4 Project stage: Meeting PMNS20250364, Closed Meeting - Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes2025-03-20020 March 2025 Closed Meeting - Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes Project stage: Meeting NL-25-0072, – Units 3 and 4, License Amendment Request: Addition of RCS Tcold Engineered Safety Feature Actuation System (ESFAS) Instrumentation Function - Supplement2025-03-31031 March 2025 – Units 3 and 4, License Amendment Request: Addition of RCS Tcold Engineered Safety Feature Actuation System (ESFAS) Instrumentation Function - Supplement Project stage: Supplement ML25079A3322025-04-0101 April 2025 March 18, 2025, Summary of Follow-Up Observation Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request to Change Table 3.3.8-1 for Vogtle Electric Generating Plant, Units 3 and 4 Project stage: Meeting ML25084A2622025-04-0202 April 2025 MTS - Meeting Summary - Vogtle 3 and 4 - Closed Meeting on 03-24-2025 - Proposed PRHR License Amendment Request Project stage: Meeting ML25092A1252025-04-0909 April 2025 Request for Withholding Information from Public Disclosure License Amendment Request Supplement to Add New Reactor Coolant System Tcold - High Function for the Technical Specification for the Engineered Safety Feature Actuation System Instr Project stage: Withholding Request Acceptance ML25100A0532025-04-24024 April 2025 Regulatory Audit Plan in Support of the Review of the License Amendment Request to Add a New Tcold - High Function to Engineered Safety Feature Actuation System Instrumentation Project stage: Other ML25176A1772025-06-25025 June 2025 NRR E-mail Capture - for Your Action - RAIs - Vogtle 3 and 4 Technical Specifications (TS) 3.3.8, Engineered Safeguards Actuation System Instrumentation License Amendment Request (L-2025-LLA-0035) Project stage: RAI ML25177C9762025-07-0101 July 2025 Extension of the Regulatory Audit Plan in Support of the Review of the LAR to Add a New Reactor Coolant System Tcold - High Function to Engineered Safety Feature Actuation System Instrumentation Project stage: Approval NL-25-0258, License Amendment Request: Addition of RCS Tcold Engineered Safety Feature Actuation System (ESFAS) Instrumentation Function - Response to Request for Additional Information2025-07-0909 July 2025 License Amendment Request: Addition of RCS Tcold Engineered Safety Feature Actuation System (ESFAS) Instrumentation Function - Response to Request for Additional Information Project stage: Response to RAI ML25199A0482025-08-0808 August 2025 Issuance of Expedited Amendment to Revise Technical Specification 3.3.8, Engineered Safety Feature Actuation System (ESFAS) Instrumentation Project stage: Approval 2025-03-06
[Table View] |
Text
July 1, 2025 Ms. Jamie M. Coleman Regulatory Affairs Director Southern Nuclear Operating Co., Inc.
3535 Colonnade Parkway Birmingham, AL 35243
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 3 AND 4 - EXTENSION OF THE REGULATORY AUDIT PLAN IN SUPPORT OF THE REVIEW OF THE LICENSE AMENDMENT REQUEST TO ADD A NEW REACTOR COOLANT SYSTEM Tcold - HIGH FUNCTION TO ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION (EPID L-2025-LLA-0035)
Dear Ms. Coleman:
By letter dated February 14, 2025 (Agencywide Documents and Access Management System (ADAMS) Accession No. ML25045A166), as supplemented by letter dated March 31, 2025 (ML25090A283), Southern Nuclear Operating Company (SNC, the licensee) submitted a license amendment request (LAR) for Vogtle Electric Generating Plant (Vogtle), Units 3 and 4. The proposed LAR would change the Technical Specifications (TSs) 3.3.8, Engineered Safety Feature Actuation System Instrumentation, Table 3.3.8-1, to add a new Function 11.b, Reactor Coolant System Cold Leg Temperature (Tcold) - High. SNC requested that the U. S. Nuclear Regulatory Commission (NRC) complete its safety review by August 29, 2025, to support planned implementation during the Vogtle, Unit 4 refueling outage.
The NRC staff has identified the need for a regulatory audit to examine SNCs non-docketed information with the intent of understanding, verify information, or identify information that will require docketing to support the basis of the licensing or regulatory decision. By letter dated April 24, 2025 (ML25100A053), the NRC staff issued the audit plan. The audit was scheduled from May 1 through July 15, 2025.
Audit discussions were held on May 27, and June 24, 2025. The NRC staff expects that further audit discussions may be needed beyond July 15, 2025. Therefore, the NRC staff is extending the audit until August 15, 2025.
If you have any questions, please contact me at (301) 415-3100 or by email at John.Lamb@nrc.gov.
Sincerely,
/RA/
John G. Lamb, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.52-025 and 52-026
Enclosure:
Audit Plan cc: Listserv
ML25177C976 NRR-106 OFFICE NRR/DORL/LPLII-1/PM NRR/DORL/LPLII-1/LA NRR/DORL/LPLII-1/BC NRR/DORL/LPLII-1/PM NAME JLamb KZeleznock MMarkley JLamb DATE 06/25/2025 06/30/2025 07/01/2025 07/01/2025