MONTHYEARPMNS20250218, Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes2025-02-12012 February 2025 Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes Project stage: Approval NL-25-0030, License Amendment Request: Addition of RCS Tcold Engineered Safety Feature Actuation System (ESFAS) Instrumentation Function2025-02-14014 February 2025 License Amendment Request: Addition of RCS Tcold Engineered Safety Feature Actuation System (ESFAS) Instrumentation Function Project stage: Request ML25055A2532025-03-0303 March 2025 SNC Slides - SNC Presentation - Public Meeting on March 3, 2025 - Proposed Vogtle 3 and 4 PRHR LAR Project stage: Meeting PMNS20250291, Follow-Up Meeting - Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes2025-03-0606 March 2025 Follow-Up Meeting - Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes Project stage: Meeting ML25079A3312025-03-0606 March 2025, 18 March 2025, 1 April 2025 Summary of March 18, 2025, Follow-Up Observation Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request to Change Table 3.3.8-1 for Vogtle Electric Generating Plant, Units 3 and 4 Project stage: Request ML25073A1032025-03-18018 March 2025 SNC Slides - Revised - Public Meeting on March 18, 2025 - Proposed Vogtle 3 and 4 PRHR LAR Project stage: Meeting ML25071A1032025-03-18018 March 2025 SNC Presentation Material - Public Meeting - Vogtle 3 and 4 - PRHR LAR - UFSAR 6.3.3.4.1 Markup - 2025-03-18 Project stage: Meeting ML25071A1022025-03-18018 March 2025 SNC Presentation Material - Public Meeting - Vogtle 3 and 4 - PRHR LAR - ISG-06 Applicability Table - 2025-03-18 Project stage: Meeting ML25071A1042025-03-18018 March 2025 SNC Slides -Public Meeting - Vogtle 3 and 4 - PRHR Actuation LAR - 2025-03-18 Project stage: Meeting ML25063A1902025-03-19019 March 2025 Summary of Observation Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request to Change Table 3.3.8 1 for Vogtle Electric Generating Plant, Units 3 and 4 Project stage: Meeting PMNS20250364, Closed Meeting - Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes2025-03-20020 March 2025 Closed Meeting - Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes Project stage: Meeting NL-25-0072, – Units 3 and 4, License Amendment Request: Addition of RCS Tcold Engineered Safety Feature Actuation System (ESFAS) Instrumentation Function - Supplement2025-03-31031 March 2025 – Units 3 and 4, License Amendment Request: Addition of RCS Tcold Engineered Safety Feature Actuation System (ESFAS) Instrumentation Function - Supplement Project stage: Supplement ML25079A3322025-04-0101 April 2025 March 18, 2025, Summary of Follow-Up Observation Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request to Change Table 3.3.8-1 for Vogtle Electric Generating Plant, Units 3 and 4 Project stage: Meeting ML25084A2622025-04-0202 April 2025 MTS - Meeting Summary - Vogtle 3 and 4 - Closed Meeting on 03-24-2025 - Proposed PRHR License Amendment Request Project stage: Meeting ML25092A1252025-04-0909 April 2025 Request for Withholding Information from Public Disclosure License Amendment Request Supplement to Add New Reactor Coolant System Tcold - High Function for the Technical Specification for the Engineered Safety Feature Actuation System Instr Project stage: Withholding Request Acceptance ML25100A0532025-04-24024 April 2025 Regulatory Audit Plan in Support of the Review of the License Amendment Request to Add a New Tcold - High Function to Engineered Safety Feature Actuation System Instrumentation Project stage: Other ML25176A1772025-06-25025 June 2025 NRR E-mail Capture - for Your Action - RAIs - Vogtle 3 and 4 Technical Specifications (TS) 3.3.8, Engineered Safeguards Actuation System Instrumentation License Amendment Request (L-2025-LLA-0035) Project stage: RAI ML25177C9762025-07-0101 July 2025 Extension of the Regulatory Audit Plan in Support of the Review of the LAR to Add a New Reactor Coolant System Tcold - High Function to Engineered Safety Feature Actuation System Instrumentation Project stage: Approval ML25199A0482025-08-0808 August 2025 Issuance of Expedited Amendment to Revise Technical Specification 3.3.8, Engineered Safety Feature Actuation System (ESFAS) Instrumentation Project stage: Approval 2025-03-06
[Table View] |
Text
Vogtle Electric Generating Plant Units 3 and 4 License Amendment Request Add a New Tcold - High Function to Technical Specification Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes Second Post-submittal Meeting: March 18, 2025 (LAR Submitted ML25045A166)
Agenda
- Address ISG-06 for Software-Only Change
- Address Additional Detail on Safety Analysis
New TS 3.3.8 Tcold - High Function for PRHR Actuation Logic Changes Background - DI&C-ISG-06, Licensing Process
- Guidance for the NRC staffs review of LARs for the installation of DI&C equipment
- Scope of the LAR is software-only change to PMS
- Lack of hardware/architectural changes provide for streamlined application of ISG-06 scope
- When based on an NRC-approved platform topical report, the NRC staff should be able, where appropriate, to limit its review to assessing whether the application of the DI&C modification conforms to the topical report approval
- WCAP-16096-P-A, Software Program Manual for Common Q Systems [ML13081A047]
- Alternate Review Process (in accordance with ISG-06 Revision 2)
- Safety determination before completion of detailed design, implementation, and testing 3
New TS 3.3.8 Tcold - High Function for PRHR Actuation Logic Changes DI&C-ISG-06 Enclosure B - Information for Planned Supplement
- Summary of Vendor Oversight Plan (VOP) (ISG-06, C.2.2)
- SNC Vendor Oversight Plan (VOP) is an umbrella document that describes SNC processes and procedures that establish governance for oversight of WEC quality activities and product development during the project life cycle
- VOP Summary provided with the LAR Supplement will:
- Describe processes and procedures to be used to review Design Artifacts and other technical products
- Distinguish between SNC verification efforts and the V&V that WEC will conduct, as required by WCAP-16096-P-A, Software Program Manual for Common Q Systems
- Identify the administrative control of, and change process for, the VOP, which will have provisions for maintaining and controlling the VOP to remain consistent with the NRC issued Amendment Safety Evaluation 4
New TS 3.3.8 Tcold - High Function for PRHR Actuation Logic Changes DI&C-ISG-06 Enclosure B - Information for Planned Supplement
- Sections D.1 through D.8:
- As applicable to PRHR logic changes proposed in the LAR
- As applicable refer to reference approved Topical Report(s) rather than repeat details
- Where LAR provided expected content, refer to LAR Section
- Proprietary detailed design documents (e.g., I&C functional diagrams) available for audit
- Refer to separate attachment for additional details 5
New TS 3.3.8 Tcold - High Function for PRHR Actuation Logic Changes Safety Analysis Impacts (Reference UFSAR Table 15.0-6)
As stated in LAR Section 3, the safety analyses that credit PRHR actuation on Low-2 narrow range SG level coincident with Low-2 startup feedwater flow are:
- Loss of Alternating Current (LOAC)
- Loss of Normal Feedwater - Both SGs Affected (LONF), including LONF with consequential LOAC As stated in LAR Section 3, additional evaluation was performed:
- Loss of Normal Feedwater - Only One SG Affected (Partial LONF)
Other non-limiting analyses not crediting PRHR actuation on Low-2 narrow range SG level remain unaffected by the LAR proposed change (inferred in LAR Section 3)
- Planned Supplement to provide Table of each limiting event in which PRHR actuation is credited and the credited actuation signal, along with applicable UFSAR subsection Additional UFSAR subsection 6.3.3.4.1 markup to be included in Supplement 6
New TS 3.3.8 Tcold - High Function for PRHR Actuation Logic Changes Schedule
March 20, 2025
- WEC Software Development Project Schedule:
Proprietary / Export Controlled
- SNC Request NRC Issuance of Amendment:
Prior to Unit 4 1st Refueling Outage (Early Fall 2025)
- SNC Planned Implementation:
Unit 3: 2nd Refueling Outage - Spring 2026 Unit 4: 1st Refueling Outage - Early Fall 2025 7