MONTHYEARPMNS20250218, Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes2025-02-12012 February 2025 Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes Project stage: Approval NL-25-0030, License Amendment Request: Addition of RCS Tcold Engineered Safety Feature Actuation System (ESFAS) Instrumentation Function2025-02-14014 February 2025 License Amendment Request: Addition of RCS Tcold Engineered Safety Feature Actuation System (ESFAS) Instrumentation Function Project stage: Request ML25055A2532025-03-0303 March 2025 SNC Slides - SNC Presentation - Public Meeting on March 3, 2025 - Proposed Vogtle 3 and 4 PRHR LAR Project stage: Meeting PMNS20250291, Follow-Up Meeting - Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes2025-03-0606 March 2025 Follow-Up Meeting - Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes Project stage: Meeting ML25079A3312025-03-0606 March 2025, 18 March 2025, 1 April 2025 Summary of March 18, 2025, Follow-Up Observation Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request to Change Table 3.3.8-1 for Vogtle Electric Generating Plant, Units 3 and 4 Project stage: Request ML25073A1032025-03-18018 March 2025 SNC Slides - Revised - Public Meeting on March 18, 2025 - Proposed Vogtle 3 and 4 PRHR LAR Project stage: Meeting ML25071A1032025-03-18018 March 2025 SNC Presentation Material - Public Meeting - Vogtle 3 and 4 - PRHR LAR - UFSAR 6.3.3.4.1 Markup - 2025-03-18 Project stage: Meeting ML25071A1022025-03-18018 March 2025 SNC Presentation Material - Public Meeting - Vogtle 3 and 4 - PRHR LAR - ISG-06 Applicability Table - 2025-03-18 Project stage: Meeting ML25071A1042025-03-18018 March 2025 SNC Slides -Public Meeting - Vogtle 3 and 4 - PRHR Actuation LAR - 2025-03-18 Project stage: Meeting ML25063A1902025-03-19019 March 2025 Summary of Observation Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request to Change Table 3.3.8 1 for Vogtle Electric Generating Plant, Units 3 and 4 Project stage: Meeting PMNS20250364, Closed Meeting - Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes2025-03-20020 March 2025 Closed Meeting - Expedited License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes Project stage: Meeting NL-25-0072, – Units 3 and 4, License Amendment Request: Addition of RCS Tcold Engineered Safety Feature Actuation System (ESFAS) Instrumentation Function - Supplement2025-03-31031 March 2025 – Units 3 and 4, License Amendment Request: Addition of RCS Tcold Engineered Safety Feature Actuation System (ESFAS) Instrumentation Function - Supplement Project stage: Supplement ML25079A3322025-04-0101 April 2025 March 18, 2025, Summary of Follow-Up Observation Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a License Amendment Request to Change Table 3.3.8-1 for Vogtle Electric Generating Plant, Units 3 and 4 Project stage: Meeting ML25084A2622025-04-0202 April 2025 MTS - Meeting Summary - Vogtle 3 and 4 - Closed Meeting on 03-24-2025 - Proposed PRHR License Amendment Request Project stage: Meeting ML25092A1252025-04-0909 April 2025 Request for Withholding Information from Public Disclosure License Amendment Request Supplement to Add New Reactor Coolant System Tcold - High Function for the Technical Specification for the Engineered Safety Feature Actuation System Instr Project stage: Withholding Request Acceptance ML25100A0532025-04-24024 April 2025 Regulatory Audit Plan in Support of the Review of the License Amendment Request to Add a New Tcold - High Function to Engineered Safety Feature Actuation System Instrumentation Project stage: Other ML25176A1772025-06-25025 June 2025 NRR E-mail Capture - for Your Action - RAIs - Vogtle 3 and 4 Technical Specifications (TS) 3.3.8, Engineered Safeguards Actuation System Instrumentation License Amendment Request (L-2025-LLA-0035) Project stage: RAI ML25177C9762025-07-0101 July 2025 Extension of the Regulatory Audit Plan in Support of the Review of the LAR to Add a New Reactor Coolant System Tcold - High Function to Engineered Safety Feature Actuation System Instrumentation Project stage: Approval ML25199A0482025-08-0808 August 2025 Issuance of Expedited Amendment to Revise Technical Specification 3.3.8, Engineered Safety Feature Actuation System (ESFAS) Instrumentation Project stage: Approval 2025-03-06
[Table View] |
Text
April 9, 2025 Jamie M. Coleman Regulatory Affairs Director Southern Nuclear Operating Co., Inc.
3535 Colonnade Parkway Birmingham, AL 35243
SUBJECT:
VOGTLE ELECTRIC GENERATING PLANT, UNITS 3 AND 4 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE RE: LICENSE AMENDMENT REQUEST SUPPLEMENT TO ADD A NEW REACTOR COOLANT SYSTEM TCOLD - HIGH FUNCTION FOR THE TECHNICAL SPECIFICATION FOR THE ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION - ATTACHMENT 2, LTR-GIC-25-017, REVISION 0, DETAILED FUNCTIONAL DIAGRAMS (PROPRIETARY)
(EPID L-2025-LLA-0035)
Dear Jamie Coleman:
By letter dated February 14, 2025 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML25045A166), as supplemented by letter dated March 31, 2025 (ML25090A283 - Public version, Non-Proprietary), Southern Nuclear Operating Company (SNC, the licensee) submitted a license amendment request (LAR) to add a new reactor coolant system (RCS) TCOLD - High function to the technical specification (TS) Table 3.3.8-1 for TS 3.3.8, Engineered Safety Feature Actuation System (ESFAS) Instrumentation.
By letter dated March 31, 2025, SNC submitted a supplement to the U.S. Nuclear Regulatory Commission (NRC) regarding the proposed LAR for Vogtle Electric Generating Plant (Vogtle),
Units 3 and 4.
In Attachment 3 of the letter dated March 31, 2025, SNC submitted an affidavit dated March 21, 2025, executed by Rachel Christian, Manager, New Plants Licensing, on behalf of Westinghouse Electric Company LLC (Westinghouse), requested that the information contained in the following document be withheld from public disclosure pursuant to Section 2.390 of Title 10 of the Code of Federal Regulations (10 CFR):
- LTR-GIC-25-017, Revision 0, Detailed Functional Diagrams (Proprietary)
The affidavit stated that the submitted information should be withheld from public disclosure for the following reasons:
(5)(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouses competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(5)(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
The NRC staff has reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, because of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. The NRC staff will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, please contact me at 301-415-3100 or John.Lamb@nrc.gov.
Sincerely,
/RA/
John G. Lamb, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 52-025 and 52-026 cc: Rachel Christian Manager, New Plants Licensing Ref. CAW-25-013 Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066 Listserv
ML25092A125 OFFICE DORL/LPL2-1/PM DORL/LPL2-1/LA DORL/LPL2-1/BC DORL/LPL2-1/PM NAME JLamb KZeleznock MMarkley JLamb DATE 04/04/2025 04/09/2025 04/09/2025 04/09/2025