Waterford Steam Electric Station - Integrated Inspection Report 05000382/2025001
ML25129A097
Person / Time
Site: Waterford 
Issue date: 05/13/2025
From: John Dixon
NRC/RGN-IV/DORS/PBD
To: Sullivan J
Entergy Operations
Sanchez A
References
IR 2025001
Download: ML25129A097 (1)


Text

May 12, 2025 Joseph Sullivan, Site Vice President Entergy Operations Inc.

17265 River Road Killona, LA 70057

SUBJECT:

WATERFORD STEAM ELECTRIC STATION - INTEGRATED INSPECTION REPORT 05000382/2025001

Dear Joseph Sullivan:

On March 31, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Waterford Steam Electric Station. On April 21, 2025, the NRC inspectors discussed the results of this inspection with David Oertling, General Manager of Plant Operations, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Operating Reactor Safety Docket No. 05000382 License No. NPF-38

Enclosure:

As stated cc w/ encl: Distribution via LISTSERV Signed by Dixon, John on 05/12/25

ML25129A097

SUNSI Review AAS

Non-Sensitive

Sensitive

Publicly Available

Non-Publicly Available OFFICE RI:DORS/PBD SRI:DORS/PBD SPE:DORS/PBD BC:DORS/PBD NAME KCook-Smith KChambliss ASanchez JDixon SIGNATURE

/RA/

/RA/

/RA/

/RA/

DATE 05/12/25 05/09/25 05/10/25 05/12/25

Enclosure U.S. NUCLEAR REGULATORY COMMISSION Inspection Report Docket Number:

05000382 License Number:

NPF-38 Report Number:

05000382/2025001 Enterprise Identifier:

I-2025-001-0003 Licensee:

Entergy Operations Inc.

Facility:

Waterford Steam Electric Station Location:

Killona, LA Inspection Dates:

January 1, 2025, to March 31, 2025 Inspectors:

K. Chambliss, Senior Resident Inspector K. Cook-Smith, Resident Inspector Approved By:

John L. Dixon, Jr., Chief Reactor Projects Branch D Division of Operating Reactor Safety

2

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Waterford Steam Electric Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations No findings or violations of more than minor significance were identified.

Additional Tracking Items None.

3 PLANT STATUS Unit 3 operated at or near 94 percent rated thermal for the entire inspection period.

INSPECTION SCOPES Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk-significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY 71111.01 - Adverse Weather Protection Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1)

The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather due to severe winter storm conditions on January 30, 2025.

71111.04 - Equipment Alignment Partial Walkdown Sample (IP Section 03.01) (1 Sample)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) emergency diesel generator train B during extended emergency diesel generator A maintenance window on March 28, 2025 71111.05 - Fire Protection Fire Area Walkdown and Inspection Sample (IP Section 03.01) (1 Sample)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) fire area RAB 7-001, elevation +35.00 feet relay room on January 15, 2024

4 Fire Brigade Drill Performance Sample (IP Section 03.02) (1 Sample)

(1)

The inspectors evaluated the onsite fire brigade training and performance during an unannounced fire drill on March 13, 2025.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1)

The inspectors observed and evaluated licensed operator examination scenario in the simulator on March 10, 2025.

71111.12 - Maintenance Effectiveness Maintenance Effectiveness (IP Section 03.01) (3 Samples)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) reactor coolant maintenance rule function proposed return to (a)(2) status after completion of (a)(1) goals on March 27, 2025 (2) plant protection system maintenance rule scoping and (a)(2) status following component failures on March 28, 2025 (3) overall deviation tag use and deficient SSC tracking on March 31, 2025 71111.13 - Maintenance Risk Assessments and Emergent Work Control Risk Assessment and Management Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) elevated risk due to planned maintenance on startup transformer A on January 15, 2025 (2) elevated risk due to the failure of a plant protection system fuse that resulted in a half-trip configuration on January 24, 2025 (3) elevated risk due to planned maintenance on emergency diesel generator A on February 11, 2025 (4) elevated risk due to the discovery of no oil in startup transformer A bushing on March 30, 2025 (5) elevated risk due to planned maintenance of component cooling water and auxiliary component cooling water train B on March 31, 2025

5 71111.15 - Operability Determinations and Functionality Assessments Operability Determination or Functionality Assessment (IP Section 03.01) (3 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) restoration of emergency diesel generator A missing linkage washers causing wearing of pivot arm on March 17, 2025 (2) wet cooling tower breaker thermography indicating differences between phases on March 20, 2025 (3) wet cooling tower fan 7A failure to start on March 27, 2025 71111.24 - Testing and Maintenance of Equipment Important to Risk The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:

Post-Maintenance Testing (PMT) (IP Section 03.01) (3 Samples)

(1) auxiliary component cooling water train B pump discharge motor operated valve post maintenance testing on January 31, 2025 (2) emergency diesel generator A maintenance post maintenance testing following maintenance activities after a failed surveillance on March 5, 2025 (3) low-pressure safety injection pump A discharge flow control valve post maintenance testing following maintenance window on March 12, 2025 Surveillance Testing (IP Section 03.01) (3 Samples)

(1) high-pressure safety injection pump A operability verification on February 21, 2025 (2) component cooling water and auxiliary component cooling water train B pump and valve operability test on March 5, 2025 (3) emergency diesel generator A 24-hour surveillance run on March 12, 2025 Inservice Testing (IST) (IP Section 03.01) (1 Sample)

(1) containment spray pump train A inservice test on March 7, 2025 71114.06 - Drill Evaluation Required Emergency Preparedness Drill (1 Sample)

(1)

The inspectors evaluated an emergency preparedness drill involving a small break loss of coolant accident on March 18, 2025.

6 OTHER ACTIVITIES - BASELINE 71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 02.01) (1 Sample)

(1)

Unit 3 (January 1 through December 31, 2024)

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 02.02) (1 Sample)

(1)

Unit 3 (January 1 through December 31, 2024)

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 02.03) (1 Sample)

(1)

Unit 3 (January 1 through December 31, 2024) 71152A - Annual Follow-up Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03) (1 Sample)

The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:

(1) follow-up on corrective actions and compliance restoration resulting from multiple non-cited violations concerning design control and corrective action program adverse condition identification issues related to steam supply valves to emergency feedwater pump turbines INSPECTION RESULTS No findings were identified.

EXIT MEETINGS AND DEBRIEFS The inspectors verified no proprietary information was retained or documented in this report.

On April 21, 2025, the inspectors presented the integrated inspection results to David Oertling, General Manager of Plant Operations, and other members of the licensee staff.

7 DOCUMENTS REVIEWED Inspection Procedure Type Designation Description or Title Revision or Date 71111.01 Corrective Action Documents CR-WFE-YYYY-NNNN 2025-00207, 2025-00219 71111.01 Procedures OP-901-521 Severe Weather and Flooding 344 71111.04 Corrective Action Documents CR-WF3-YYYY-NNNN 2024-00552, 2024-00845, 2024-01017, 2024-02319, 2024-03288, 2024-03290, 2025-00017, 2025-00200 71111.04 Procedures ME-004-21 Emergency Diesel Generator 45 71111.04 Procedures OP-902-002 Emergency Diesel Generator 362 71111.04 Procedures OP-902-002 Emergency Diesel Generator 361 71111.05 Drawings 5817-6309 Reactor Auxiliary Building Relay Room Elevation +35 Multi-Cycle System FP-M29 6

71111.05 Drawings G1375 Fire Protection Reactor Auxiliary Building Plan Elevation +35 2

71111.05 Fire Plans RAB 7-001 Relay Room 14 71111.05 Procedures FP-001-019 Fire Brigade Equipment 313 71111.05 Procedures FP-001-020 Fire Emergency/Fire Report 315 71111.05 Procedures OP-009-004 Fire Protection 331 71111.11Q Procedures EN-OP-115 Conduct of Operations 34 71111.11Q Procedures OP-009-007 Plant Protection System 24 71111.11Q Procedures OP-901-110 Pressurizer Level Malfunction 11 71111.11Q Procedures OP-901-130 Reactor Coolant Pump Malfunction 12 71111.11Q Procedures OP-901-201 Steam Generator Level Control Malfunction 7

71111.11Q Procedures OP-901-512 Loss of Turbine Cooling Water 3

71111.11Q Procedures OP-902-002 Loss of Coolant Accident Recovery 22 71111.12 Corrective Action Documents CR-WF3-YYYY-NNNN 2021-07042, 2022-03722, 2024-01600, 2024-02494, 2025-00205, 2025-00229 71111.12 Procedures EN-DC-150 Condition Monitoring of Maintenance Rule Structures 18 71111.12 Procedures EN-DC-203 Maintenance Rule Program 8

71111.12 Procedures EN-DC-204 Maintenance Rule Scope and Basis 9

71111.12 Procedures EN-DC-205 Maintenance Rule Monitoring 9

71111.12 Procedures EN-DC-206 Maintenance Rule (A)(1) Process 7

71111.12 Procedures EN-FAP-OP-024 Operations Deviation Control Process 0

71111.12 Procedures EN-OP-115-07 Configuration Control 4

8 Inspection Procedure Type Designation Description or Title Revision or Date 71111.12 Procedures OP-100-009 Control of Valves and Breakers 44 71111.13 Corrective Action Documents CR-WF3-YYYY-NNNN 2024-1145, 2025-00205 71111.13 Procedures EN-OM-132 Nuclear Risk Management Process 4

71111.13 Procedures EN-OM-132 Nuclear Risk Management Process 3

71111.13 Procedures EN-OP-119 Protected Equipment Postings 19 71111.13 Procedures EN-OP-119 Protected Equipment Postings 18 71111.13 Procedures OI-037-000 Operations Risk Assessment Guideline 322 71111.13 Procedures OI-037-000 Operations Risk Assessment Guideline 323 71111.15 Corrective Action Documents CR-WF3-YYYY-NNNN 2021-00184, 2022-00163, 2025-00386, 2025-00444, 2025-00530, 2025-00540, 2025-00872 71111.15 Miscellaneous W3-DBD-004 Auxiliary Component Cooling Water 3

71111.15 Miscellaneous W3-DBD-2 Emergency Diesel Generator and Automatic Load Sequencer Design Basis Document 306 71111.15 Procedures EN-OP-104 Operability Determination Process 20 71111.15 Work Orders 00542710, 54224230, 71111.24 Procedures OP-009-002 Emergency Diesel Generator 362 71111.24 Procedures OP-009-002 Emergency Diesel Generator 361 71111.24 Procedures OP-009-002 Emergency Diesel Generator 360 71111.24 Procedures OP-009-118 Primary Auxiliaries Quarterly IST Valve Tests 66 71111.24 Procedures OP-902-121 Safety Systems Quarterly IST Valve Tests 37 71111.24 Procedures OP-903-013 Monthly Channel Checks 23 71111.24 Procedures OP-903-030 Safety Injection Pump Operability Verification 41 71111.24 Procedures OP-903-050 Component Cooling Water and Auxiliary Component Cooling Water Pump and Valve Operability Test 47 71111.24 Procedures OP-903-068 Emergency Diesel Generator Operability and Subgroup Relay Verification 327 71111.24 Procedures OP-903-119 Secondary Auxiliaries Quarterly IST Valve Test 38 71111.24 Work Orders 5054130, 53030371, 54003565, 54005756, 54034338, 54154641, 54158213, 54211319, 54215929, 54241828 71114.06 Procedures EN-EP-308 Emergency Planning Critiques 8

71114.06 Procedures EN-EP-604 Emergency Classifications 1

71114.06 Procedures EN-FAP-EP-013 Emergency Preparedness Program Maintenance 3

9 Inspection Procedure Type Designation Description or Title Revision or Date 71114.06 Procedures EP-003-070 Emergency Preparedness Routine Tests and Checks 307 71151 Corrective Action Documents CR-WF3-YYYY-NNNN 2024-03830 71151 Procedures EN-LI-114 Regulatory Performance Indicator Process 21 71151 Procedures EN-LI-114 Regulatory Performance Indicator Process 22 71152A Corrective Action Documents CR-WF3-YYYY-NNNN 2017-6700, 2022-02645, 2022-06932, 2022-06957, 2022-07091, 2022-07298, 2022-07300, 2023-15004 71152A Procedures EN-LI-102 Corrective Action Program 54 71152A Work Orders 153070, 482181, 586705, 586708