May 12, 2025 Brad Berryman Senior Vice President and Chief Nuclear Officer Susquehanna Nuclear, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 -
INTEGRATED INSPECTION REPORT 05000387/2025001 AND 05000388/2025001
Dear Brad Berryman:
On March 31, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Susquehanna Steam Electric Station, Units 1 and 2. On April 3, 2025, the NRC inspectors discussed the results of this inspection with Doug LaMarca, Director - Strategic Planning, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Sarah H. Elkhiamy, Chief Operations Branch Division of Operating Reactor Safety Docket Nos. 05000387 and 05000388 License Nos. NPF-14 and NPF-22
Enclosure:
As stated cc w/ encl: Distribution via LISTSERV SARAH ELKHIAMY Digitally signed by SARAH ELKHIAMY Date: 2025.05.12 06:42:29 -04'00'
ML25121A252 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DORS RI/DORS RI/DORS NAME JEngland SHaney SElkhiamy DATE 4/28/2025 4/30/2025 4/30/2025
Enclosure U.S. NUCLEAR REGULATORY COMMISSION Inspection Report Docket Numbers:
05000387 and 05000388 License Numbers:
NPF-14 and NPF-22 Report Numbers:
05000387/2025001 and 05000388/2025001 Enterprise Identifier: I-2025-001-0050 Licensee:
Susquehanna Nuclear, LLC Facility:
Susquehanna Steam Electric Station, Units 1 and 2 Location:
769 Salem Blvd., Berwick, PA Inspection Dates:
January 1, 2025 to March 31, 2025 Inspectors:
J. England, Senior Resident Inspector E. Brady, Resident Inspector S. Haney, Senior Project Engineer Approved By:
Sarah H. Elkhiamy, Chief Operations Branch Division of Operating Reactor Safety
2
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Susquehanna Steam Electric Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations No findings or violations of more than minor significance were identified.
Additional Tracking Items None.
3 PLANT STATUS Unit 1 began the inspection period at rated thermal power. On March 6, 2025, the unit down powered to 85 percent for scram time testing. On March 7, 2025, the unit down powered to 60 percent for a rod sequence exchange and returned to rated thermal power on March 9, 2025.
The unit remained at or near rated thermal power for the remainder of the inspection period.
Unit 2 began the inspection period at rated thermal power. On January 9, 2025, the unit was down powered to 78 percent for a rod pattern adjustment and returned to rated thermal power on January 10, 2025. On January 16, 2025, the unit was down powered to 77 percent for a rod pattern adjustment and returned to rated thermal power on January 17, 2025. On February 7, 2025, the unit was down powered to 74 percent for a rod pattern adjustment and returned to rated thermal power on February 9, 2025. On February 14, 2025, the unit commenced coast down and shut down for a refueling outage on March 23, 2025, and remained shut down for the remainder of the inspection period.
INSPECTION SCOPES Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program -
Operations Phase. The inspectors performed activities described in Inspection Manual Chapter 2515, Appendix D, Plant Status, conducted routine reviews using IP 71152, Problem Identification and Resolution, observed risk-significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY 71111.01 - Adverse Weather Protection Seasonal Extreme Weather IP Section 03.01) (1 Sample)
(1)
The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of hot weather for offsite power on March 11, 2025.
Impending Severe Weather (IP Section 03.02) (1 Sample)
(1)
The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather on January 16 and 17, 2025.
71111.04 - Equipment Alignment Partial Walkdown (IP Section 03.01) (3 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
4 (1)
Unit 1 core spray division 1 on January 21, 2025 (2)
Unit Common standby gas treatment during the week of February 10, 2025 (3)
Unit Common emergency service water during the week of March 3, 2025 71111.05 - Fire Protection Fire Area Walkdown and Inspection (IP Section 03.01) (4 Samples; 1 Partial)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
(1)
Unit 1 reactor building, 645-foot elevation, fire areas 1-1A, 1-1B, 1-1C, 1-1D, 1-1E, 1-1F, and 1-1G, on January 7, 2025 (2)
(Partial)
Unit Common control structure, 698-foot elevation, fire areas 0-24A, 0-24B, 0-24C, 0-24D, 0-24E, and 0-24G, on January 15, 2025 (3)
Unit Common FLEX equipment building, emergency service water building, and residual heat removal service water building, 685-foot and 721-foot elevations, fire areas 0-51, 0-52, and 0-FS, on February 11, 2025 (4)
Unit 2 reactor building, 779-foot elevation, fire areas 2-6A, 2-6B, 2-6C, and 2-6D, on February 12, 2025 (5)
Unit 2 turbine building, 676-foot and 699-foot elevations, fire areas 2-32B, 2-32C, 2-32D, 2-32E, 2-32F, 2-32I, 2-33B, 2-33C, 2-33D, 2-33E, 2-33F, and 2-33G, on March 27, 2025 Fire Brigade Drill Performance (IP Section 03.02) (1 Sample)
(1)
The inspectors evaluated the on-site fire brigade training and performance during an unannounced fire drill on January 17, 2025.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)
(1 Sample)
(1)
The inspectors observed and evaluated licensed operator performance in the Unit 2 control room during reactor shutdown on March 23 and 24, 2025.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
(1)
The inspectors observed and evaluated licensed operator requalification training in the simulator on January 27, 2025.
71111.12 - Maintenance Effectiveness Maintenance Effectiveness (IP Section 03.01) (1 Sample)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components remain capable of performing their intended function:
5 (1)
Unit Common 'B' emergency diesel generator (EDG) mid-cycle outage starting February 3, 2025 Quality Control (IP Section 03.02) (1 Sample)
The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following structures, systems, and components remain capable of performing their intended function:
(1)
Unit Common 'C' EDG synchronous selector switch on March 10, 2025 71111.13 - Maintenance Risk Assessments and Emergent Work Control Risk Assessment and Management (IP Section 03.01) (5 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
(1)
Unit 2 elevated risk during planned maintenance on division 2 core spray during the week of January 13, 2025 (2)
Units 1 and 2 elevated risk due to planned maintenance of the 'A' EDG resulting in the 125-volt direct current battery chargers supplied by an alternate source during the week of February 24, 2025 (3)
Unit 2 elevated risk during planned maintenance on reactor core isolation cooling during the week of March 10, 2025 (4)
Unit 2 elevated risk during planned maintenance on the high-pressure coolant injection system during the week of March 17, 2025 (5)
Unit 2 elevated risk during the refueling outage during the week of March 24, 2025 71111.15 - Operability Determinations and Functionality Assessments Operability Determination or Functionality Assessment (IP Section 03.01) (2 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
(1)
Unit 1 start up from cycle 24 maintenance outage was not in compliance with EC-FUEL-1973 on January 15, 2025 (CR-2024-13422)
(2)
Unit 2 foreign material in breaker cubicle on January 16, 2025 71111.20 - Refueling and Other Outage Activities Refueling/Other Outage (IP Section 03.01) (1 Partial)
(1)
(Partial)
The inspectors evaluated Unit 2 refueling outage 22 activities from March 4 to March 31, 2025. The inspectors completed sections a., b.1, b.2, c.3, c.4, c.6, c.7, c.9, and c.10.
6 71111.24 - Testing and Maintenance of Equipment Important to Risk The inspectors evaluated the following testing and maintenance activities to verify system operability and/or functionality:
Post-Maintenance Testing (IP Section 03.01) (5 Samples)
(1)
Unit 2 reactor water cleanup steam isolation following temperature switch replacement on January 23, 2025 (2)
Unit Common 'C' EDG following synchroscope replacement on January 29, 2025 (3)
Unit Common 'B' EDG post-maintenance test following mid-cycle overhaul on February 11, 2025 (4)
Unit Common 125-volt direct current station batteries monthly and quarterly electrical parameter checks for Unit 2 following planned maintenance during the week of February 24, 2025 (5)
Unit Common measure currents and perform voltage regulator checks after 'A' EDG linear reactor replacement on February 27, 2025 Surveillance Testing (IP Section 03.01) (4 Samples)
(1)
Unit 2 SO-249-007, Residual Heat Removal Logic System Functional Test (Div I),
on February 3, 2025 (2)
Unit 1 SO-193-001, Turbine Valve Cycling, on March 11, 2025 (3)
Unit 2 SO-225-101, Long-Term Nitrogen Supply System Functional Test (A Header), on March 18, 2025 (4)
Unit 2 SO-224-117, Division I Diesel Generator Loss of Coolant Accident Loss of Offsite Power Test (Infrequently Performed Test or Evolution), on March 27, 2025 Containment Isolation Valve Testing (IP Section 03.01) (1 Sample)
(1)
Unit 2 SE-259-150, Hydraulic Leak Test of Control Rod Drive Seismic Island Check, on March 31, 2025 OTHER ACTIVITIES - BASELINE 71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
IE01: Unplanned Scrams per 7000 Critical Hours (IP Section 02.01) (2 Samples)
(1)
Unit 1 January 1, 2024 through December 31, 2024 (2)
Unit 2 January 1, 2024 through December 31, 2024 IE03: Unplanned Power Changes per 7000 Critical Hours (IP Section 02.02) (2 Samples)
(1)
Unit 1 January 1, 2024 through December 31, 2024 (2)
Unit 2 January 1, 2024 through December 31, 2024
7 IE04: Unplanned Scrams with Complications (USwC) (IP Section 02.03) (2 Samples)
(1)
Unit 1 January 1, 2024 through December 31, 2024 (2)
Unit 2 January 1, 2024 through December 31, 2024 BI01: Reactor Coolant System Specific Activity (IP Section 02.10) (2 Samples)
(1)
Unit 1 January 1, 2024 through December 31, 2024 (2)
Unit 2 January 1, 2024 through December 31, 2024 BI02: Reactor Coolant System Leak Rate (IP Section 02.11) (2 Samples)
(1)
Unit 1 January 1, 2024 through December 31, 2024 (2)
Unit 2 January 1, 2024 through December 31, 2024 71152A - Annual Follow-up of Problem Identification and Resolution Annual Follow-up of Selected Issues (Section 03.03) (1 Partial)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
(1)
(Partial)
The inspectors reviewed the completed corrective actions for CR-2024-13422, Startup from Unit 1 Cycle 24 Maintenance Outage Not in Compliance with Control Rod Drop Analysis.
INSPECTION RESULTS No findings were identified.
EXIT MEETINGS AND DEBRIEFS The inspectors verified no proprietary information was retained or documented in this report.
On April 3, 2025, the inspectors presented the integrated inspection results to Doug LaMarca, Director - Strategic Planning, and other members of the licensee staff.
THIRD PARTY REVIEWS The inspectors reviewed Institute of Nuclear Power Operations Continuum Site Visit Report dated June 2024 on January 22, 2025.
8 DOCUMENTS REVIEWED Inspection Procedure Type Designation Description or Title Revision or Date 71111.01 Procedures OI-AD-029 Emergency Load Control Revision 19 71111.04 Corrective Action Documents Resulting from Inspection CR-2024-01145 CR-2025-01142 CR-2025-01143 CR-2025-01144 CR-2025-01146 CR-2025-02352 Drawings E106216 Sheet 1 Susquehanna S.E.S. Common PI&D Emergency Service Water System Revision 52 E106680 Sheet 3 Susquehanna S.E.S. Common P&ID HVAC Control Diagram Reactor Building Standby Gas Treatment System Revision 35 E162640 Sheet 1 Susquehanna S.E.S. Unit 2 P&ID Emergency Service Water System A Loop Revision 51 Miscellaneous CL-054-0012 Common ESW System Revision 47 CL-054-0016 Unit 2 Emergency Service Water System Revision 39 CL-070-0011 Common Standby Gas Treatment System Revision 8 CL-070-0012 Standby Gas Treatment Revision 11 CL-151-0012 Instruments Unit 1 Core Spray System Div 1 Revision 16 CL-151-0012 Valves Unit 1 Core Spray System Div 1 Revision 16 71111.05 Calculations EC-013-1913 PGCC Halon Systems for the Units 1 & 2 Upper & Lower Relay Rooms Revision 0 NEDO-10466-A Licensing Topical Report Power Generation Control Complex Design Criteria and Safety Evaluation February 1979 SSES-FPRR Susquehanna Steam Electric Station - Fire Protection Review Report Section 6.2 Revision 28 Corrective Action Documents Resulting from Inspection AR-2025-02597 AR-2025-04821 CR-2025-02177 CR-2025-02262 CR-2025-03212
9 Inspection Procedure Type Designation Description or Title Revision or Date CR-2025-04702 CR-2025-04829 Fire Plans FP-013-382 Flex Storage Building Fire Zone 0-FS, Elevation 721 Revision 0 FP-013-CS Susquehanna S.E.S. Prefire Plan Unit 1 Control Structure Revision 0 FP-1-ESSW-685 Susquehanna S.E.S. Prefire Plan Unit 1 Pump House -
ESSW Revision 0 FP-1-RB-645 Susquehanna S.E.S. Prefire Plan Unit 1 645 Revision 0 FP-2-RB-779 Susquehanna S.E.S. Prefire Plan Unit 2 779 Revision 0 FP-2-TB-676 Susquehanna S.E.S. Prefire Plan Unit 2 676 Revision 0 FP-2-TB-699 Susquehanna S.E.S. Prefire Plan Unit 2 699 Revision 0 Miscellaneous Scenario U1LCR Fire Unit #1 Lower Cable Spreading Room, Elevation 714' Revision 2 71111.11Q Procedures GO-200-004 Plant Shutdown to Minimum Power Revision 88 GO-200-005 Plant Shutdown to Hot/Cold Shutdown Revision 73 OP-293-002 Main Turbine Testing Revision 56 71111.12 Miscellaneous 285262 Receipt Inspection Report 10/13/2021 675791 Purchase Order Revision 001 EDU-SWH-0023 Dedication Document Revision 3 Procedures NOSP-QA-303 Receipt Inspection Revision 10 Work Orders RTSV 2780208 71111.13 Corrective Action Documents Resulting from Inspection CR-2025-00954 CR-2025-02731 CR-2025-04075 CR-2025-04392 Miscellaneous03-001 Outage Offsite Power-U222RIO Offsite Power Feeds Protected During U222RIO Revision 0 16-001 RHRSW 2A Pump-U222RIO Protected While 1A RHRSW Pump OOS Revision 0 49-001-U1 RHR FPC Assist-U222RIO Unit 1 DIV 1 FPC Assist Revision 0
10 52-001-U2 HPCI SOW Week of 3/17/25 Protected for Unit 2 HPCI SOW Revision 0 52-001-U2 HPCI-WK OF 3/10/25 Unit 2 HPCI Protected Revision 0 M-2155 Susquehanna S.E.S. Unit 2 High-Pressure Coolant Injection Revision 46 Procedures NDAP-QA-0340 Protected Equipment Program Revision 46 71111.15 Corrective Action Documents CR-2024-13422 CR-2024-16975 Drawings D107252 Sheet 21 Unit 2 Schematic Diagram 4.16KV Bus 2C Incoming Feeder Breaker from Engineered Safeguard System ESS Transformer 211 Revision 28 FF103090 Sheet 1958 Unit 2 Medium Voltage Switchgear Safeguard Connection Diagram Unit 8 Bus 2C 2A20308 Revision 18 Engineering Changes EC-FUEL-1973 Unit 1 Cycle 24 RWM Sequence Configuration Changes Revision 0 Procedures RE-0TP-101 Control Rod Sequence Development and Controls Revision 14 71111.20 Corrective Action Documents Resulting from Inspection CR-2025-04356 CR-2025-04359 CR-2025-04362 CR-2025-04363 CR-2025-04366 CR-2025-04375 CR-2025-04376 CR-2024-04817 Procedures IC-280-005 Installation and Removal of Temporary Unit 2 RPV Shutdown Level Transmitter Revision 7 NDAP-QA-0505 Crane, Hoist, and Rigging Process Revision 48 71111.24 Corrective Action Documents CR-2025-01225 CR-2025-01812 Corrective Action Documents Resulting from Inspection CR-2025-03974 CR-2025-04533 Drawings FF110683 Sheet 2302 Schematic Wiring Diagram Valve Test Logic TB (EHC)
Revision 0
11 Procedures SI-261-309 Quarterly Calibration of Reactor Water Clean-Up (RWCU)
Steam Leak Detection Logic B (Div. 2) Temperature Channels Revision 11 SM-202-001 125 Volt DC Station Batteries Monthly and Quarterly Electrical Parameter Checks - Unit 2 Revision 24 SO-024-001B Monthly Diesel Generator 'B' Operability Test Revision 30 SO-193-001 Turbine Valve Cycling Revision 59 SO-224-117 Unit 2 Division I Diesel Generator LOCA LOOP (Infrequently Performed Test or Evolution)
Revision 9 SO-225-101 Long-Term Nitrogen Supply System Functional Test (A Header)
Revision 4 SO-249-007 RHR Logic System Functional Test (Div 1) - Online (Partial)
Revision 7 Work Orders PCWO 2345661-0 PCWO 2363336-4 PCWO 2771647-1 PCWO 2783650-0 RACT 2655198 RLWO 2784525 RLWO 2784526 RTSV 2627008 RTSV 2637300 RTSV 2767574 RTSV 2771607 RTSV 2771647-1 RTSV 2779484 71151 Corrective Action Documents DI-2024-00641 DI-2024-02046 DI-2024-03475 DI-2024-05806 DI-2024-05806 DI-2024-07751 DI-2024-09002 DI-2024-10154 DI-2024-11919 DI-2024-13029 DI-2024-14244
12 DI-2024-15840 DI-2025-00509 DPA-01-DI-2024-00374 DPA-02-DI-2024-00374 DPA-03-DI-2024-00374 DPA-04-DI-2024-00374 DPA-05-DI-2024-00374 DPA-06-DI-2024-00374 DPA-07-DI-2024-00374 DPA-08-DI-2024-00374 DPA-09-DI-2024-00374 DPA-10-DI-2024-00374 DPA-11-DI-2024-00374 DPA-12-DI-2024-00374 Miscellaneous NEI 99-02 Regulatory Assessment Performance Indicator Guideline Revision 8 Procedures NDAP-QA-0737 Reactor Oversight Process (ROP) Performance Indicators Revision 22 OI-AD-094 NRC Performance Indicator Monthly Update Reactor System Total Leakage (RCSL)
Revision 10 71152A Engineering Changes EC-FUEL-1971 Unit 1 Cycle Step Out Revision 0 EC-FUEL-1973 Unit 1 Cycle 24 RWM Sequence Configuration Changes Revisions 0, 1, and 2 Miscellaneous NF-220 Technical Instructions - RWM Startup Sequence Development Revision 5
13 Procedures GO-100-002 Plant Startup, Heatup, and Power Operation Revision 128 RE-0TP-101 Control Rod Sequence Development and Controls Revisions 14 and 15 SR-131-001 Validating Rod Worth Minimizer Sequences Revision 10