10 CFR 50.75(f)(1) 10 CFR 72.30(c)
A member of the STARS Alliance LLC Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek 102-08932-MDD/FDG March 28, 2025 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Palo Verde Nuclear Generating Station Units 1, 2, and 3 Docket Nos. STN 50-528, 50-529, and 50-530 Renewed Operating License Nos. NPF-41, NPF-51, NPF-74 Independent Spent Fuel Storage Installation Docket No. 72-44 Consolidated Decommissioning Funding Status Report - 2024 In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Part 50.75(f)(1), 10 CFR 72.30(c) and in accordance with the guidance in Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2001-07, Revision 1, 10 CFR 50.75 Reporting and Recordkeeping for Decommissioning Planning, dated January 8, 2009, Arizona Public Service Company (APS) is submitting the 2024 Decommissioning Funding Status Reports for Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2, and 3, and for the PVNGS Independent Spent Fuel Storage Installation (ISFSI).
APS is relying upon the 2024 Annual Funding Status Report from each Participant Owner as well as the 2023 Decommissioning Cost Study for the Palo Verde Nuclear Generating Station, issued December 2023, in providing the information in these reports. The report, provided in Enclosure 1 to this letter, contains the information described in NRC RIS 2001-07, Revision 1, as well as the status of decommissioning funding for each PVNGS unit and for each of the Participants.
In order to reduce the ongoing burden of submitting reports on separate schedules under 10 CFR 72.30(c) and under 10 CFR 50.75(f)(1), APS is including the ISFSI report as Enclosure 2.
Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 Mail Station 7636 Tel: (623) 393-3495 t ) aps
102-08932-MDD/FDG ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Consolidated Decommissioning Funding Status Report - 2024 Page 2 No commitments are being made in this letter. Should you need further information regarding this letter, please contact me at (623) 393-3495.
Sincerely, Michael D. DiLorenzo Licensing Department Leader, Nuclear Regulatory Affairs MDD/FDG
Enclosures:
- 1. 2024 Decommissioning Funding Status Report for Palo Verde Nuclear Generating Station Units 1, 2, and 3
- 2. 2024 Decommissioning Funding Status Report for the Independent Spent Fuel Storage Installation at Palo Verde Nuclear Generating Station cc:
J. Monninger NRC Region IV Regional Administrator W. T. Orders NRC NRR Project Manager for PVNGS N. Cuevas NRC Resident Inspector for PVNGS Dilorenzo, Michael D(Z99838)
Digitally signed by Dilorenzo, Michael D(Z99838)
Date: 2025.03.28 18:43:42 -07'00' y
2024 Decommissioning Funding Status Report for Palo Verde Nuclear Generating Station Units 1, 2, and 3 2024 Decommissioning Funding Status Report for PVNGS Units 1, 2 & 3 Page 1 The Decommissioning Funding Status Report for the period ending December 31, 2024, is being submitted pursuant to 10 CFR 50.75(f)(1) by Arizona Public Service Company (APS) as the operator of Palo Verde Nuclear Generating Station (PVNGS), Units 1, 2 and 3. The information contained in this report is based on the best available information as provided by the Palo Verde Participants updated to the current revision of NUREG-1307, Revision 20, Report on Waste Burial Charges, dated February 2025.
The authorized megawatts thermal (MWt) and expiration dates for authority to operate the PVNGS units pursuant to the licenses are as follows:
MWt Expiration date Unit 1 3990 June 1, 2045 Unit 2 3990 April 24, 2046 Unit 3 3990 November 25, 2047 APS is submitting this report on behalf of the seven Palo Verde Participants identified below.
Participant Share of Each Unit
- 1.
Arizona Public Service Company (APS) 29.10
- 2.
Salt River Project Agricultural Improvement and Power District (SRP) 17.49
- 3.
El Paso Electric Company (EPE) 15.80
- 4.
Southern California Edison Company (SCE) 15.80
- 5.
Public Service Company of New Mexico (PNM) 10.20
- 6.
Southern California Public Power Authority (SCPPA) 5.91
- 7.
Los Angeles Department of Water and Power (LADWP) 5.70 Pursuant to the Participation Agreement governing the obligations of the PVNGS owners, each owner is required to establish and maintain Termination Fund(s) for the accumulation of funds to decommission PVNGS, including a requirement that such funds meet the regulatory requirements of the NRC for providing financial assurance for decommissioning, as well as other requirements. Every year, each PVNGS owner provides an Annual Funding Status Report and certifies compliance with these requirements. Copies of the most recent certifications for the 2024 reports are provided as Appendix A to this Report. The information provided in this report is based upon the information in the 2024 Annual Funding Status Reports as certified by the Participants.
2024 Decommissioning Funding Status Report for PVNGS Units 1, 2 & 3 Page 2 10 CFR 50.75(f)(1) requires, and Regulatory Issue Summary 2001-07, Revision 1, requests, that the following information be provided:
- 1. The amount of decommissioning funds estimated to be required pursuant to 10 CFR 50.75 (b) and (c).
- 2. The amount accumulated to the end of the calendar year preceding the date of the report (This report is for the period ending December 31, 2024).
- 3. A schedule of the annual amounts remaining to be collected.
- 4. The assumptions used in determining rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections.
- 5. Any contracts upon which the licensee is relying pursuant to 10 CFR 50.75(e)(1)(v).
- 6. Any modifications occurring to a licensees current method of providing financial assurance since the last submitted report.
- 7. Any material changes to trust agreements.
Item 1 The amount of decommissioning funds estimated to be required pursuant to 10 CFR 50.75 (b) and (c).
Response
NUREG-1307, Revision 20, Report on Waste Burial Charges, dated February 2025, provides the following information.
Using the format used in the examples in Section 3.5 of NUREG-1307, Sample Calculations of Estimated Reactor Decommissioning Costs, along with end of year inflation numbers:
Scenario Description Reactor Type:
PWR Thermal Power Rating:
3990 MWt Location of Plant:
West Region, Southwestern Compact LLW Disposition Preference:
Generators Located in the Unaffiliated States and those Located in Compact-Affiliated States having no Disposal Facility LLW Burial Location:
Andrews County, Texas and Clive, Utah Base Cost (1986 Dollars)
$105 million [from 10 CFR 50.75(c)(1)]
Labor Cost Escalation (Lx)
=
3.568 Energy Cost Escalation (Ex)
=
2.921 LLW Burial Cost Escalation (Bx)
=
12.405 Decommissioning Cost (2024 dollars)
= ($105 million)*[(0.65)*(3.568)+(0.13)*(2.921)+(0.22)*(12.405)]
= $570 Million 2024 Decommissioning Funding Status Report for PVNGS Units 1, 2 & 3 Page 3 APS has reviewed the assumptions in this example as applicable to PVNGS. APS uses a site specific estimate of decommissioning costs. A comparison of the two costs is shown below:
TABLE 1 PVNGS Unit 10 CFR 50.75 (b) and (c)
Required1 Unit 1 570 Million (2024$)
Unit 2 570 Million (2024$)
Unit 3 570 Million (2024$)
- 1. From NUREG-1307, Revision 20 calculation TABLE 2 PVNGS Unit Site Specific Basic Radiological Decommissioning1 Unit 1 948 Million (2023$)
Unit 2 946 Million (2023$)
Unit 3 947 Million (2023$)
1.These values come from the 2023 Decommissioning Cost Study, Table 6.1, page 81 of 199.
Item 2 The amount accumulated to the end of the calendar year preceding the date of the report.
This report is for the period ending December 31, 2024.
Response
Each Participant is entitled to exercise its own judgment regarding additional contingency factors and scope of work beyond the scope of work assumed in the site specific study. In addition, assumptions regarding decommissioning cost escalation and trust fund earnings may affect funding levels. Therefore, Participants may accumulate funds based upon a Basic Radiological Decommissioning Cost Estimate and Total Decommissioning Cost Estimate that exceed the amounts noted above. Regardless of such independent judgments, each Participant meets NRC requirements for purposes of estimating the decommissioning funds to be required, because the site specific estimates of costs noted above for the Basic Radiological Decommissioning of each PVNGS unit exceed the NRC minimum formula amount calculated in accordance with 10 CFR 50.75(c), NUREG-1307, Revision 20, Report on Waste Burial Charges and Regulatory Guide 1.159, Assuring the Availability of Funds for Decommissioning Nuclear Reactors.
2024 Decommissioning Funding Status Report for PVNGS Units 1, 2 & 3 Page 4 The following table shows the actual accumulated funds by Participant at the end of the reporting year 2024.
Total Trust Balances at End of Reporting Period (In Thousands $) 1,2,3 Participant Unit 1 Accumulation Unit 2 Accumulation Unit 3 Accumulation APS 442,689 299,551 447,622 SRP 234,101 232,921 242,181 EPE 141,552 142,117 133,284 SCE 523,801 536,293 553,368 PNM 114,781 125,058 144,796 SCPPA 62,903 63,073 69,649 LADWP 55,485 53,246 54,987 Total 1,575,312 1,452,260 1,645,886
- 1.
These values represent liquidation values (i.e., after fees, expenses and taxes) as estimated by each Participant.
- 2.
As indicated these amounts are total accumulated trust balances as of December 31, 2024, that eventually will be utilized to pay for radiological, non-radiological, spent fuel and ISFSI decommissioning costs.
- 3.
Totals may not sum due to rounding.
Based upon the 2023 Decommissioning Cost Study, the portion of the Total Trust Balances reported above that are intended to be utilized to pay for NRC radiological license termination and ISFSI radiological license termination costs, in 2023 dollars, are as follows:
Decommissioning Cost Study Estimates for Selected Decommissioning Functions (In Thousands $) 1 Purpose Unit 1 Unit 2 Unit 3 Radiological 948,303 946,224 946,672 ISFSI2 8,008 8,008 8,008
- 1.
These values come from the 2023 Decommissioning Cost Study, Table 6.1, page 81 of 199 and Appendix L, page 164 of 199 and have not been escalated to 2024 dollars.
- 2.
ISFSI decommissioning is a common cost for all three units, and is equally allocated above. The total ISFSI decommissioning cost estimate is $24.024 million and is consistent with the reported value in Enclosure 2.
2024 Decommissioning Funding Status Report for PVNGS Units 1, 2 & 3 Page 5 Item 3 A schedule of the annual amounts remaining to be collected.
Response
Pursuant to the Participation Agreement, as amended and reformed, the Participants agreed that each Participant would commit to minimum levels of accumulation of funds, regardless of fund investment performance, pursuant to a pre-established percentage funded commitment or "Funding Curve" for each year through the end of plant life. Every three years a site specific decommissioning cost estimate is performed, and each Participant applies the new site specific cost estimate to its pre-established Funding Curve. Each Participant is committed to minimum levels of accumulations, which cannot drop below a Funding Floor (which is never less than eighty percent of the Participant's Funding Curve and was established to take into account market fluctuations in the early years of fund accumulation).
For purposes of determining compliance with NRCs minimum financial assurance requirements, based upon an evaluation of the existing balances and earnings to be credited using the 2% real rate of return as authorized in 10 CFR 50.75(f)(1)(i) & (ii),
minimum financial assurance is achieved. Some Participants continue to make annual contributions of additional amounts as authorized by rate setting authorities and/or as required by the Participation Agreement.
The amounts of additional annual funding reported by the Participants for the year 2024 are as follows:
Annual Contributions by Participant in 2024 Participant Unit 1 Contribution Unit 2 Contribution Unit 3 Contribution APS
$0
$2,281,000
$0 SRP
$165,045
$164,213
$170,741 EPE
$384,036
$284,640
$0 SCE
$0
$0
$0 PNM
$0
$0
$1,300,000 SCPPA
$0
$0
$0 LADWP
$2,700,000
$2,700,000
$2,700,000 2024 Decommissioning Funding Status Report for PVNGS Units 1, 2 & 3 Page 6 Item 4 The assumptions used in determining rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections.
Response
For purposes of determining compliance with NRCs minimum financial assurance requirements, NRCs regulations authorize a 2% real rate of return. The actual rates of earnings and escalation assumed by rate setting authorities for the Participants may vary, but compliance with NRCs requirements is demonstrated when the NRCs 2% real rate of return is applied.
Item 5 Any contracts upon which the licensee is relying pursuant to 10 CFR 50.75(e)(1)(v).
Response
No PVNGS Participant is relying upon a contract for purposes of providing decommissioning funding within the meaning of 10 CFR 50.75(e)(1)(v).
Item 6 Any modifications occurring to a licensees current method of providing financial assurance since the last submitted report.
Response
Based upon trust fund balances reported as of December 31, 2024, and credit for a 2% real rate of return for projected earnings, all Participants currently satisfy NRCs decommissioning financial assurance requirements in accordance with the requirements of the prepayment method in 10 CFR 50.75(e)(1)(i). However, some Participants continue to make annual contributions of additional amounts as authorized by rate setting authorities and/or as required by the Participation Agreement.
Item 7 Any material changes to trust agreements.
Response
Based upon the Annual Funding Status Reports submitted to APS by the Participants, EPE and PNM changed their trustees during 2024.
APPENDIX A Certifications
ARIZONA PUBLIC SERVICE COMPANY'S CERTIFICATE FOR ANNUAL FUNDING STATUS REPORT FOR PERIOD ENDING DECEMBER 31, 2024 Chris Bauer, Vice President & Treasurer of Arizona Public Service Company certifies on behalf of Arizona Public Service Company that the provisions of trust agreement(s) establishing, and all other instruments providing for investment management of, the Termination Fund(s) of Arizona Public Service Company, taken together, comply with Section 8A.7.2.2 and all other provisions of the Arizona Nuclear Power Project Participation Agreement, dated as of August 23, 1973, as amended by Amendment Nos. 1 through 16, establishing requirements for such agreements and instruments; and further certifies that, to the best of the knowledge of Chris Bauer, the information contained in the report to which this Certificate is attached is true and correct and accurately sets forth the status of the Termination Funds of Arizona Public Service Company as of the date stated.
DATED:
March 10, 2025 Chris Bauer Vice President & Treasurer
Delivering water and power'"
SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT'S CERTIFICATE FOR ANNUAL FUNDING STATUS REPORT FOR PERIOD ENDING DECEMBER 31, 2024 Jon W. Hubbard, Treasurer and Senior Director of Financial Operations and Compliance, Salt River Project Agiicultural Improvement and Power District, ce1iifies on behalf of Salt River Project Agiicultural Improvement and Power District that the provisions of the trust agreement establishing, and all other instruments providing for investment management of, the Tennination Fund of Salt River Project Agiicultural Improvement and Power District, taken together, comply with Section 8A.7.2.2. and all other provisions of the Alizona Nuclear Power Project Participation Agreement, dated as of August 23, 1973, as amended by Alnendment Nos. 1 through 16, establishing requirements for such agreements and instruments; and further certifies that, to the best of the knowledge of Jon Hubbard, the infonnation contained in the report to which this Ce1iificate is attached is true and con-ect and accurately sets forth the status of the Termination Fund of the Salt River Project Agiicultural Improvement and Power Districts as of the date stated.
Dated:
nior Director, Financial Operations and Compliance
EL PASO ELECTRIC COMPANY CERTIFICATE FOR ANNUAL FUNDING STATUS REPORT FOR PERIOD ENDING DECEMBER 31, 2024 Lisa Budtke, Chief Financial Officer, certifies on behalf of El Paso Electric Company that the provisions of trust agreements establishing, and all other instruments providing for investment management of, the Termination Funds of El Paso Electric Company, taken together, comply with Section 8A.7.2.2 and all other provisions of the Arizona Nuclear Power Project Participation Agreement, dated as of August 23, 1973, as amended by Amendment Nos. 1 through 16, establishing requirements for such agreements and instruments; and further certifies that, to the best of the knowledge of Lisa Budtke, the information contained in the report to which this Certificate is attached is true and correct and accurately set forth the status of the Termination Funds of El Paso Electric Company as of the date stated.
DATED: February 28, 2025 Lisa Budtke Chief Financial Officer
Southern California Edison Company Certificate for Annual Funding Status Report For the Period Ending December 31, 2024 Brendan Bond, Vice President and Treasurer of Southern California Edison, certifies on behalf of Southern California Edison that the provisions of the trust agreement(s) establishing, and all other instruments providing for investment management, of the Termination Funds of Southern California Edison Company, taken together, comply with Section 8.A.7.2.2 and all other provisions of the Arizona Nuclear Power Project Participation Agreement, dated as of August 23, 1973, as amended by Amendments No. 1 through 16, establishing requirements for such agreements and instruments; and further certifies that, to the best of the knowledge of Brendan Bond, the information contained in the report to which this Certificate is attached is true and correct and accurately sets forth the status of the Termination Funds of Southern California Edison Company as of the date stated.
Dated: March 12, 2025 Brendan Bond Vice President and Treasurer Southern California Edison Company
I/
DocuSigned by:
L ~1 8E~
PUBLIC SERVICE COMPANY OF NEW MEXICO CERTIFICATE FOR ANNUAL FUNDING STATUS REPORT FOR PERIOD ENDING DECEMBER 31, 2024 Elisabeth Eden, Senior Vice President and Chief Financial Officer of TXNM Energy, Inc.,
certifies on behalf of the Public Service Company of New Mexico (PNM) that the provisions of the trust agreements establishing, and all other instruments providing for investment management of, the Termination Funds of PNM, taken together, comply with Section 8A.7.2.2 and all other provisions of the Arizona Nuclear Power Project Participation Agreement, dated as of August 23, 1973, as amended by Amendment Nos. 1 through 16, establishing requirements for such agreements and instruments; and further certifies that, to the best of the knowledge of Elisabeth Eden, the information contained in the report to which this Certificate is attached is true and correct and accurately sets forth the status of the Termination Funds of PNM as of the date stated.
Dated: February 28, 2025 Elisabeth Eden Senior Vice President & Chief Financial Officer
ANAHEIM* AZUSA* BANNING* BURBANK* CERRITOS* COLTON* GLENDALE* IID
- LOS ANGELES* PASADENA* RIVERSIDE* VERNON Southern California Public Power Authority 111 North Hope Street, Room 462 Los Angeles, CA 90012 (213) 367 -4668
- Fax (213) 367 - 4330 www.scppa.org SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY CERTIFICATE FOR ANNUAL FUNDING STATUS REPORT FOR THE PERIOD ENDING DECEMBER 31, 2024 Aileen Ma, Chief Financial and Administrative Officer of Southern California Public Power Authority certifies on behalf of Southern California Public Power Authority that the provisions of the trust agreements establishing, and all other instruments providing for investment management of the Termination Funds of Southern California Public Power Authority, taken together, comply with Section 8A.7.2.2 and all other provisions of the Arizona Nuclear Power Project Participation Agreement, dated August 23, 1973, as amended by Amendment Nos. 1 through 16, establishing requirements for such agreements and instruments; and further certifies that, to the best of the knowledge of Aileen Ma, the information contained in the report to which this certificate is attached is true and correct and accurately sets forth the status of the Termination Funds of Southern California Public Power Authority as of the date stated.
Dated: February 28, 2025 AILEEN MA Chief Financial and Administrative Officer Southern California Public Power Authority Page 24
DWP Los Angeles Department of Water & Power Karen Bass. Mayor B UI LD IN G A STRONGER L. A.
Board of Commissioners Richard Katz, President George S. McGraw, Vice President Nurlt D. Katz Mia Lehrer Wilma J. Pinder Chante L. Mitchell, Secretary Janisse Ouinones, Chief Executive Officer and Chief Engineer LOS ANGELES DEPARTMENT OF WATER & POWER CERTIFICATE FOR ANNUAL FUNDING STATUS REPORT FOR THE PERIOD ENDING DECEMBER 31, 2024 Ann M. Santilli, Chief Financial Officer of Los Angeles Department of Water and Power certifies on behalf of Los Angeles Department of Water and Power that the provisions of the trust agreements establishing, and all other instruments providing for investment management of, the Termination Funds of Los Angeles Department of Water and Power, taken together, comply with Section 8A.7.2.2 and all other provisions of the Arizona Nuclear Power Project Participation Agreement, dated August 23, 1973, as amended by Amendments Nos. 1 through 16, establishing requirements for such agreements and instruments; and further certifies that, to the best of the knowledge of Ann M. Santilli, the information contained in the report to which this certificate is attached is true and correct and accurately sets forth the status of the Termination Funds of Los Angeles Department of Water and Power as of the date stated.
Dated: February 28, 2025 d)~~-
Ann M. Santilli Chief Financial Officer 111 N Hope Street. Los Angeles. Californ,a 90012-2607 Mailing Address PO Box 51111, Los Angeles, CA 90051-5700 Telephone (213) 367-4211 ladwp.com
2024 Decommissioning Funding Status Report for the Independent Spent Fuel Storage Installation at Palo Verde Nuclear Generating Station 2024 Decommissioning Funding Status Report for PVNGS ISFSI Page 1 Pursuant to 10 CFR 72.30, each licensee for an Independent Spent Fuel Storage Installation (ISFSI),
including an ISFSI licensed under the General License provided for in 10 CFR Part 72, Subpart K, is required, at intervals not to exceed 3 years, to resubmit a decommissioning funding plan with adjustments as necessary to account for changes in costs and the extent of contamination, as well as information regarding the financial assurance provided for funding such costs. On behalf of the owners of Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (PVNGS) and the PVNGS ISFSI, Arizona Public Service Company (APS) provides the requested information below:
- 1.
Information on how reasonable assurance will be provided that funds will be available to decommission the ISFSI:
See response to number 4 below, which discusses the appropriate method of financial assurance contemplated under 10 CFR 72.30(e).
- 2.
A detailed cost estimate (DCE) for decommissioning:
In 1998, TLG Services, Inc. (TLG) prepared a site specific Decommissioning Cost Study for the PVNGS (DCE), which included the costs of decommissioning the ISFSI. This report has been updated, most recently in 2023. The most recent TLG Report found that the total cost of decommissioning the PVNGS ISFSI (license termination radiological only) after sixty years of operation would be $24.0 million in 2023 dollars. This cost estimate includes the cost of an independent contractor to perform all radiological decommissioning activities, an adequate contingency factor of 15 percent, and the cost of meeting the 10 CFR 20.1402 criteria for unrestricted release.
Below is the effect of the following on the detailed cost estimate since the previous report:
- a. Spills of radioactive material producing additional residual radioactivity in onsite subsurface material: None
- b. Facility modifications: None
- c. Changes in authorized possession limits: None
- d. Actual remediation costs that exceed the previous cost estimate: None
- 3.
Identification of and justification for using the key assumptions contained in the decommissioning cost estimate:
The key ISFSI assumption from the 2023 Decommissioning Cost Study is that some activation of the liner material in the casks is assumed to occur over the dry storage period of the spent fuel.
The cost of the disposition of this material, as well as the conventional demolition of the ISFSI facility, is included in the estimate.
2024 Decommissioning Funding Status Report for PVNGS ISFSI Page 2
- 4.
A description of the method of assuring funds for decommissioning from 10 CFR 72.30(e), including means of adjusting cost estimates and associated funding levels periodically over the life of the facility:
The PVNGS owners are using the prepayment and external sinking fund methods as authorized in 10 CFR 72.30(e)(5) and 50.75(e)(1)(i)-(ii). The owners recover their costs for decommissioning through cost of service ratemaking, including the estimated costs to decommission the PVNGS ISFSI, which are included in the TLG Report.
In the event that funds remaining to be placed into the PVNGS owners external sinking funds are no longer approved for recovery in rates by competent rate making authorities or if the funds no longer qualify using the prepayment method, the PVNGS owners will make changes to provide financial assurance using one or more of the methods stated in 10 CFR 72.30(e)(1)-(4).
The Participation Agreement governing the obligations of the PVNGS owners requires that the site specific DCE for PVNGS be updated once every three years. This provides the means for updating the cost estimate and required funding levels associated with the decommissioning of the PVNGS ISFSI.
- 5.
The volume of onsite subsurface material containing residual radioactivity that will require remediation to meet the criteria for license termination:
APS assumes that there is no volume of onsite subsurface material at the PVNGS ISFSI that contains residual radioactivity that will require remediation to meet the criteria for license termination.
- 6.
A certification that financial assurance for decommissioning has been provided in the amount of the cost estimate for decommissioning:
Pursuant to the Participation Agreement governing the obligations of the PVNGS owners, each owner is required to establish and maintain Termination Fund(s) for the accumulation of funds to decommission PVNGS, including a requirement that such funds meet the regulatory requirements of the NRC for providing financial assurance for decommissioning, as well as other requirements.
Every year, each PVNGS owner provides an Annual Funding Status Report and certifies compliance with these requirements. Copies of the most recent certifications for the 2024 reports are provided as Appendix A to Enclosure 1.