MONTHYEARPMNS20240072, Status of the NRC Staffs Review of EPRI Technical Report 3002025288 Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components (Risk-Informed Cmpbc)2024-01-31031 January 2024 Status of the NRC Staffs Review of EPRI Technical Report 3002025288 Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components (Risk-Informed Cmpbc) Project stage: Approval ML24044A0002024-02-12012 February 2024 EPRI Technical Report 3002025288 Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components - NRC Public Meeting, February 12, 2024 Project stage: Meeting PMNS20240272, U. S. Nuclear Regulatory Commission (NRC) Public Meeting with the Nuclear Energy Institute (NEI) to Discuss the Review of NEI-99-01, Rev. 7, Development of Emergency Action Levels for Non-Passive Reactors2024-03-12012 March 2024 U. S. Nuclear Regulatory Commission (NRC) Public Meeting with the Nuclear Energy Institute (NEI) to Discuss the Review of NEI-99-01, Rev. 7, Development of Emergency Action Levels for Non-Passive Reactors Project stage: Request ML24054A0062024-03-29029 March 2024 Summary of Meeting to Discussion the Status of the NRC Staffs Review of Technical Report 3002025288 Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components Project stage: Meeting ML24100A0682024-04-0909 April 2024 Submittal of NRC Draft Slides for 04/20/2024 Meeting on Sufficiency Gaps Identified in EPRI Report 3002025288 on Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components (L-2023-TOP-0031) ML24117A2962024-04-23023 April 2024 E-Mail - EPRI Forwards Slides for Public Meeting on 4/30/2024 EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components Project stage: Meeting PMNS20240525, Sufficiency Gaps Identified in EPRI Report 3002025288 on Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components2024-04-26026 April 2024 Sufficiency Gaps Identified in EPRI Report 3002025288 on Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components Project stage: Other ML24100A0702024-04-30030 April 2024 Draft Slides for 04/30/2024 Meeting on Sufficiency Gaps Identified in EPRI Report 3002025288 on Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components ML24117A2562024-04-30030 April 2024 24-04-30 - Acceptance Review Status EPRI PRI TR 3002025288 Ri Cmpbc - NRC Slides Project stage: Acceptance Review ML24117A2592024-04-30030 April 2024 EPRI Technical Report 3002025288 Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components - NRC Public Meeting - April 30, 2024 Project stage: Meeting ML24117A2792024-06-10010 June 2024 Meeting Summary to Discuss Sufficiency Gaps Identified in EPRI Report 3002025288 on Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components Project stage: Meeting ML23352A0582024-07-11011 July 2024 E-Mail - Acceptance of Electric Power Research Institute Technical Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components Project stage: Acceptance Review ML23352A0622024-07-11011 July 2024 NRC Form 898, Topical Report Completeness Determination, for EPRI Technical Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components (RI-CMPBC) (EPRI L-2023-TOP-0045) Project stage: Other ML24166A0912024-07-16016 July 2024 NEI 99-01 R7 Meeting Summary March 15 and April 16, 2024 Project stage: Meeting ML24219A0222024-08-0101 August 2024 Change in Estimated Review Schedule for Electric Power Research Institute Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components Project stage: Other ML24211A0732024-08-0808 August 2024 Change in Estimated Review Schedule for Electric Power Research Institute Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components Project stage: Other ML24241A1662024-08-30030 August 2024 E-mail - Electric Power Research Institute Regulatory Audit in Support of Review of Technical Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components, Revision 0 Project stage: Approval ML24241A1732024-08-30030 August 2024 Electric Power Research Institute Regulatory Audit in Support of Review of Technical Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components, Revision 0 (EPID L?2023?TOP?0045) Project stage: Approval ML24352A4382024-12-17017 December 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-505-A, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b Commissioners Project stage: Request ML24352A4712025-01-13013 January 2025 E-Mail - Final Request for Additional Information - EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components Project stage: RAI ML24352A4812025-01-13013 January 2025 Final Request for Additional Information - EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components Project stage: RAI ML24352A4692025-01-13013 January 2025 Final Request for Additional Information - EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components Project stage: Request ML25029A1482025-01-29029 January 2025 Email, Wolf Creek Generating Station - Acceptance Review: Wolf Creek Revision to Technical Specifications to Adopt TSTF-505 Project stage: Acceptance Review ML25030A3842025-01-30030 January 2025 License Amendment Required to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Project stage: Other ML25063A2492025-03-0404 March 2025 Non Proprietary - EPRI 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components, RAI Responses - Draft for Public Meeting Only PMNS20250244, Public Meeting Between NRC and EPRI to Discuss the Status of Request for Additional Information Associated with the NRC Staffs Review of Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Componen2025-03-0505 March 2025 Public Meeting Between NRC and EPRI to Discuss the Status of Request for Additional Information Associated with the NRC Staffs Review of Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components Project stage: RAI ML25060A0012025-03-0606 March 2025 EPRI Slides for March 6, 2025, Public Meeting on EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components Project stage: Meeting ML25054A0012025-03-0606 March 2025 March 6, 2025, Public Meeting on Between NRC and EPRI on EPRI TR 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components, Requests for Additional Information Project stage: RAI ML25069A4712025-03-10010 March 2025 Acceptance Review - Wolf Creek Licensing Amendment Request to Adopt 10 CFR 50.69 Project stage: Acceptance Review ML25091A0932025-04-0101 April 2025 EPRI Report 3002025288 Requests for Additional Information Project stage: RAI PMNS20250361, Technical Discussion EPRIs Draft Responses to NRC Staff Issued Request for Additional Information for EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components2025-04-0202 April 2025 Technical Discussion EPRIs Draft Responses to NRC Staff Issued Request for Additional Information for EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components Project stage: Draft RAI ML25090A2172025-04-0202 April 2025 Regulatory Audit Plan in Support of License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69, Project stage: Other ML25078A2682025-04-29029 April 2025 Summary of Technical Discussion on EPRIs Draft Responses to NRC Staff Issued Request for Additional Information for EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components Project stage: Draft RAI ML25162A1172025-06-11011 June 2025 Proposed Limitations and Conditions to Be Contained in the Safety Evaluation for EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components Project stage: Request ML25162A1202025-06-11011 June 2025 Proposed Limitations and Conditions to Be Contained in the Safety Evaluation for EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components Project stage: Approval ML25163A0502025-06-11011 June 2025 EPRIs Thoughts and Response to the Limitations and Conditions in the Safety Evaluation for EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components Project stage: Other ML25162A1192025-06-11011 June 2025 E-mail - Proposed Limitations and Conditions to Be Contained in the Safety Evaluation for EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components Project stage: Approval PMNS20250719, Discussion Between NRC and EPRI on the Proposed Limitations/Conditions in the NRC Staffs Safety Evaluation for Proprietary Review for EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Compon2025-06-11011 June 2025 Discussion Between NRC and EPRI on the Proposed Limitations/Conditions in the NRC Staffs Safety Evaluation for Proprietary Review for EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components Project stage: Approval ML25147A1232025-06-12012 June 2025 Regulatory Audit Report in Support of Review of Electric Power Research Institute Technical Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components, Revision 0 (EPID L-2023-TOP-0045) Project stage: Approval ML25147A1182025-06-12012 June 2025 Regulatory Audit Report in Support of Review of Electric Power Research Institute Technical Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components, Revision 0 Project stage: Request ML25147A1222025-06-12012 June 2025 Email - Regulatory Audit Report in Support of Review of Electric Power Research Institute Technical Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components, Revision 0 (EPID L-2023-TOP-0045 Project stage: Approval ML25163A0102025-06-12012 June 2025 TSTF-505 Audit Questions (Aplb, Eeeb, Eicb) Dated June 12, 2025 Project stage: Other ML25149A0112025-06-13013 June 2025 Transmittal of Safety Evaluation EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components, for Proprietary Review (L-2023-NTR-0008) Project stage: Approval ML25171A1752025-06-20020 June 2025 TSTF-505 Audit Questions (Aplc, Scpb) Dated June 20, 2025 Project stage: Other ML25191A2132025-06-27027 June 2025 EPRI Statement Indicating That There Is No Proprietary Information in the Safety Evaluation for EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components, for Proprietary Review (L-2023-NTR-0 Project stage: Other ML25183A0162025-07-0101 July 2025 CFR 50.69 Audit Questions (Apla) Dated July 1, 2025 Project stage: Other ML25168A0112025-07-15015 July 2025 Transmittal of Final Safety Evaluation EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components (L-2023-NTR-0008) Project stage: Request ML25168A0142025-07-15015 July 2025 E-mail - Transmittal of Final Safety Evaluation EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components (L-2023-NTR-0008) Project stage: Approval ML25168A0152025-07-15015 July 2025 Final Safety Evaluation EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components (L-2023-NTR-0008) Project stage: Approval ML25225A0662025-08-12012 August 2025 Email - Wolf Creek 10 CFR 50.69 Audit Questions (Aplc) Dated August 12, 2025 Project stage: Other 2025-01-29
[Table View] |
Text
April 29, 2025 MEMORANDUM TO:
Jennie Rankin, Acting Chief Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:
Lois M. James, Senior Project Manager /RA/
Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF TECHNICAL DISCUSSION ON ELECTRIC POWER RESEARCH INSTITUTES DRAFT RESPONSES TO U.S. NUCLEAR REGULATORY COMMISSION STAFF ISSUED REQUEST FOR ADDITIONAL INFORMATION FOR ELECTRIC POWER RESEARCH INSTITUTE REPORT 3002025288, ENHANCED RISK-INFORMED CATEGORIZATION METHODOLOGY FOR PRESSURE BOUNDARY COMPONENTS (EPID NO. L-2023-NTR-0008)
On April 8, 2025, the U.S. Nuclear Regulatory Commission (NRC) staff met with Electric Power Research Institute (EPRI) to discuss of EPRIs draft responses to NRC staff issued request for additional information for EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components. The meeting summary is Enclosure 1, and the list of attendees is Enclosure 2.
If you have any questions or comments, please contact me via e-mail at Lois.James@nrc.gov.
Docket No. 9902021
Enclosures:
- 1. Meeting Summary
- 2. List of Attendees CONTACT: Lois M. James, NRR/DORL/LLPB 301-415-3306
U.S. Nuclear Regulatory Commission Public Meeting Summary
Title:
SUMMARY
OF TECHNICAL DISCUSSION ON ELECTRIC POWER RESEARCH INSTITUTES DRAFT RESPONSES TO U.S. NUCLEAR REGULATORY COMMISSION STAFF ISSUED REQUEST FOR ADDITIONAL INFORMATION FOR ELECTRIC POWER RESEARCH INSTITUTE REPORT 3002025288, ENHANCED RISK-INFORMED CATEGORIZATION METHODOLOGY FOR PRESSURE BOUNDARY COMPONENTS (EPID NO. L-2023-NTR-0008)
Date of Meeting: April 8, 2025, 1:00 pm - 5:00 pm Location:
Hybrid Type of Meeting: This was an Observation Meeting in which attendees were given an opportunity to observe the U.S. Nuclear Regulatory Commission (NRC) performing its regulatory function or discussing regulatory issues. Attendees had an opportunity to ask questions of the NRC staff or make comments about the issues discussed following the business portion of the meeting; however, the NRC is not actively soliciting comments toward regulatory decisions at this meeting.
Purpose of the Meeting: To discuss Electric Power Research Institutes (EPRIs) draft responses to NRC staff issued request for additional information (RAI) for EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components (topical report or TR).
General Details: The NRC staff held a public, observational meeting with EPRI to discuss EPRIs draft responses to NRC staff issued RAIs for EPRI Report 3002025288. The meeting began at 1:00 pm and ended at 1:45 pm. There were seventeen NRC staff, four EPRI representatives and contractor, seven industry representatives, and three members of the public. The meeting began with introductions of the NRC staff and EPRI representatives.
Summary of Meeting:
The NRC staff led the discussion of each RAI response. The NRC RAIs can be found in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML24352A481. The EPRI draft RAI responses discussed at the April 8, 2025, public meeting can be found at ADAMS Accession No. ML25091A093.
NRC RAI No.
Discussion RAI 01 - Accounting for High Consequence Scenarios The NRC staff stated that, in general, the edits, changes and rewording, especially for this RAI, were very helpful. The NRC staff further stated there was one outstanding question regarding the information provided. Specifically, how much of the RAI response will be incorporated into the TR to ensure consistent implementation?
The Nuclear Energy Institute (NEI) representative stated that the process for procurement exist and are in industry process. The NEI representative further stated that duplication would not be good
NRC RAI No.
Discussion for consistency and asked if referencing the information be sufficient?
The NRC staff agreed that reference could be sufficient if the industry documents were available for reference.
The EPRI representative agreed to summarize the RAI response in the TR and provide the reference to the industry guidance, not duplicate information.
RAI 02 - SSC Categorization as a Single Plant Unit For RAI 2, the NRC staff noted one item - the use of the words the whole plant. This appears to be the same as a single system encompasses all passive component. Can EPRI discuss?
The EPRI representative clarified that the TR provides guidance on categorizing the entire pressure boundary system as one system, with notes on how this will be worked through the analysis. EPRI asked if the NRC was concerned with the introduction of the term the whole plant?
The NRC staff stated that the new words were the concern and sought clarification.
The EPRI representatives stated they understood the question and will clarify the terminology For RAI 2b through RAI 2e, the NRC staff did not have any comments or questions.
RAI 03 - Addressing Uncertainty and Other Events in Individual Assessments For RAI 3a and RAI 3b, the NRC staff did not have any comments or questions.
For RAI 3c, the EPRI representative referenced Section 6 of the TR, Attachment A (Supplemental Information Related to the Enhanced Risk Informed Categorizing Methodology for Pressure Boundary Components, EPRI Technical Report 3002025288, dated June 2023), and NEI 00-04 where defense-in-depth is addressed in the methodology. The NRC staff did not have any further comments or questions.
For RAI 3d and RAI 3e, the NRC staff did not have any comments or questions.
RAI Qualitative Considerations for Shutdown Operations and External Events For RAI 4, the NRC staff did not have any comments or questions.
RAI 05 - Plant Design Scope for Methodology The NRC staff stated that they understood and agreed with the 1st sentence in the RAI response.
However, the NRC staff noted that the language to be added to the TR does not say precisely what
NRC RAI No.
Discussion is stated in the 1st sentence. Future new plants licensed under Title 10 of the Code of Federal Regulation Part 50, Domestic licensing of production and utilization facilities, could have very different structure than current operating fleet. The NRC staff further stated that previously operating plants and Watts Bar 2 would fit within the envelope of this TR. The NRC staff would appreciate it if EPRI made this clearer.
The EPRI representatives stated that they understood the question and would review and address it in the final submittal.
RAI 06 - Clarification for Required Prerequisite Programs to the Methodology For RAI 6a through RAI 6e, the NRC staff did not have any comments or questions.
RAI 07 - Reference to Industry Guidance for Quantitative Assessment The NRC staff did not have any comments or questions.
RAI 08 - Clarification of Reactor Coolant Boundary Categorization The NRC staff did not have any comments or questions.
RAI 09 - Sensitivity Calculation to Account for Uncertainty The NRC staff stated that the RAI response provided the information needed to resolve this RAI. The NRC staff noted that if approved, the sensitivity factor of 3 would be only applicable to this TR and not necessarily appropriate to future TR submittals.
The EPRI representatives stated that they understood that doing the analysis is the important part and not specifically the sensitivity factor of 3. The EPRI representatives stated that implementation of this TR should include a sensitive analysis consistent with NEI 00-04.
The NRC staff and EPRI representatives agreed that the RAI responses and a marked-up version of the TR would be submitted to the NRC by April 30, 2025.
Public Participation Themes:
No member of the public spoke on the webinar.
Action Items/Next Steps:
The NRC staff will prepare and issue a meeting summary.
Attachments:
Meeting description and agenda - ADAMS Accession No. ML25092A071 NRC RAIs - ADAMS Accession No. ML24352A481 EPRI Draft RAI Responses - ADAMS Accession No. ML25091A093
U.S. Nuclear Regulatory Commission Public Meeting - Attendees List April 8, 2025
Title:
SUMMARY
OF TECHNICAL DISCUSSION ON ELECTRIC POWER RESEARCH INSTITUTES DRAFT RESPONSES TO U.S. NUCLEAR REGULATORY COMMISSION STAFF ISSUED REQUEST FOR ADDITIONAL INFORMATION FOR ELECTRIC POWER RESEARCH INSTITUTE REPORT 3002025288, ENHANCED RISK-INFORMED CATEGORIZATION METHODOLOGY FOR PRESSURE BOUNDARY COMPONENTS (EPID NO. L-2023-NTR-0008)
Name U.S. Nuclear Regulatory Commission (NRC) Participants Mihaela Biro NRC Jeff Circle NRC Stephen Cumblidge NRC Carolyn Fairbanks NRC David Gennardo NRC Lois James NRC Meena Khanna NRC Matthew Mitchell NRC Demetrius Murray NRC Ching Ng NRC Bob Pascarelli NRC Jennie Rankin NRC Aida Rivera-Varona NRC Shilp Vasavada NRC Sunit Weerakkody NRC Dan Widrevitz NRC John Wise NRC EPRI Participants Name Affiliation Richard Fougerousse EPRI Doug Kull EPRI Ashley Lindeman EPRI Jim Moody EPRI Industry Participants Name Affiliation Sari Alkhatib Argonne National Laboratory Jana Bergman Curtiss Wright Rob Burg Engineering, Management, and Planning Inc. (EMP)
Chico Pellizzari EMP David Bidwell Jensen Hughes David Passehl Jensen Hughes Kelli Voelsing Nuclear Energy Institute
Public Participants Name Affiliation Lara Chern member of the public Brad Dolan member of the public York member of the public
ML25078A268
^via eConcurrence *via e-mail NRR-106 OFFICE DORL/LLPB/PM DORL/LLPB/LA DNRL/NPHP/BC DRA/APLA/BC NAME LJames^
DHarrison^
MMitchell^
BPascarelli^
DATE 04/17/2025 04/23/2025 04/23/2025 04/28/2025 OFFICE DORL/LLPB/BC DORL/LLPB/PM NAME JRankin (A)^
LJames^
DATE 04/29/2025 04/29/2025