ML24352A471

From kanterella
Jump to navigation Jump to search

E-Mail - Final Request for Additional Information - EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components
ML24352A471
Person / Time
Site: Electric Power Research Institute
Issue date: 01/13/2025
From: Lois James
Licensing Processes Branch
To: Ferrante F
Electric Power Research Institute
References
EPRI TR 3002025288, EPID L-2023-TOP-0031 pre-app, EPID L-2023-TOP-0045 pre-fee, EPID L-2023-NTR-0008 post-fee
Download: ML24352A471 (1)


Text

1 Lois James From:

Lois James Sent:

Monday, January 13, 2025 4:01 PM To:

Ferrante, Fernando Cc:

RidsNrrOd Resource; RidsNrrDnrl Resource; RidsNrrDnrlNphp Resource; RidsNrrDnrlNvib Resource; RidsNrrDra Resource; RidsNrrDraApla Resource; RidsNrrDro Resource; RidsNrrDroIqvb Resource; RidsNrrLADHarrison Resource; RidsNrrDorl Resource; RidsNrrDorlLlpb Resource; RidsACRS_MailCTR Resource; Lois James; Stephen Cumblidge; Jeff Circle; Mihaela Biro; David Gennardo; Dan Widrevitz; Yiu Law; Deanna Zhang; Aixa Belen; Gerond George; Matthew Mitchell; Bob Pascarelli; Kerri Kavanagh; Angie Buford; Bo Pham; Jamie Pelton (She/Her); Aida Rivera-Varona; Michele Sampson (She/Her/Hers); Samuel Lee; Meena Khanna (She/Her/Hers); Antonios Zoulis; Demetrius Murray; Eric Palmer; fferrante@epri.com; RFougerousse@epri.com; poregan@comcast.net; mruszkowski@epri.com

Subject:

Final Request for Additional Information - EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components (EPID No.

L-2023-NTR-0008)

Attachments:

Non Prop - EPRI 3002025288 RAI - final 01-13.pdf Fernando Ferrante, Program Manager, Risk & Safety Electric Power Research Institute 1300 West W.T. Harris Boulevard Charlotte, NC 28262-8550

Dear Fernando Ferrante:

By letter dated August 17, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23234A266), as supplemented on November 30, 2023 (ADAMS Accession No. ML23334A210), and June 14, 2024 (ADAMS Accession No. ML24180A016), Electric Power Research Institute (EPRI) submitted EPRI Technical Report (TR) 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components, dated June 2023, to the U.S. Nuclear Regulatory Commission (NRC) for review and approval. EPRI TR 3002025288 presents an enhanced methodology for categorizing pressure boundary components in support of 10 CFR 50.69 applications.

By letter dated July 11, 2024 (ADAMS Accession No. ML23352A054), the NRC staff accepted EPRI TR 3002025288 for review.

The NRC staff in the Piping and Head Penetrations Branch (NPHP) and Piping and Head Penetrations Branch (NPHP) in the Division of New and Renewed Licenses (DNRL), and in the PRA Licensing Branch A (APLA) in the Division of Risk Assessment is in the process of reviewing your application. Based on our review, the NRC staff has identified the attached draft requests for additional information (RAIs).

These requests for additional information were discussed with you and your staff on December 18, 2024, and RAI 1 was revised slightly in response to the discussion. In addition, a mutually agreeable date for the response is as soon as reasonably possible, but no later than 90 days from the date of this email.

ML24352A469 (pkg); ML24352A471 (email); ML24352A481 (RAIs)

^via RAI App *via email NRR-106 OFFICE NRR/DORL/LLPB/PM NRR/DNRL/NPHP/BC NRR/DRA/APLA DORL/LLPB/BC NAME LJames*

MMitchell*

BPascarelli*

GGeorge*

DATE 12/17/2024 01/13/2025 01/13/2025 01/13/2025 OFFICE DORL/LLPB/PM NAME LJames*

DATE 01/13/2025