Meeting Summary to Discuss Sufficiency Gaps Identified in EPRI Report 3002025288 on Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components
ML24117A279
Person / Time
Site: Electric Power Research Institute
Issue date: 06/10/2024
From: Lois James
Licensing Processes Branch
To: Gerond George
Licensing Processes Branch
References
EPID L-2023-TOP-0031 EPRI Report 3002025288
Download: ML24117A279 (1)


Text

MEMORANDUM TO: Gerond A. George, Chief FROM:

Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Lois M. James, Senior Project Manager /RA/

Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

MEETING

SUMMARY

FOR APRIL 30, 2024, TO DISCUSS SUFFICIENCY GAPS IDENTIFIED IN ELECTRIC POWER RESEARCH INSTITUTE REPORT 3002025288 ON ENHANCED RISK-INFORMED CATEGORIZATION METHODOLOGY FOR PRESSURE BOUNDARY COMPONENTS (EPID NO. L-2023-TOP-0045)

On April 30, 2024, the U.S. Nuclear Commission (NRC) staff met with Electric Power Research Institute (EPRI) representatives to discuss sufficiency gaps identified in EPRI Report 3002025288 on enhanced risk-informed categorization methodology for pressure boundary components. The meeting summary is Enclosure 1 and the list of attendees is.

If you have any questions or comments, please contact me via e-mail at Lois.James@nrc.gov.

Docket No. 99902021

Enclosures:

1.

Meeting Summary 2.

List of Attendees CONTACT: Lois M. James, NRR/DORL/LLPB 301-415-3306 June 10, 2024 Signed by James, Lois on 06/10/24

U.S. Nuclear Regulatory Commission Public Meeting Summary

Title:

Sufficiency Gaps Identified in Electric Power Research Institute (EPRI)

Report 3002025288 on Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components Date of Meeting:

April 30, 2024 Location:

Hybrid Type of Meeting:

This was an Observation meeting in which attendees had an opportunity to observe the U.S. Nuclear Regulatory Commission (NRC) performing its regulatory function or discussing regulatory issues. Attendees had an opportunity to ask questions of the NRC staff or make comments about the issues discussed following the business portion of the meeting; however, the NRC was not actively soliciting comments toward regulatory decisions at this meeting.

Purpose of the Meeting:

To discuss the NRC's staff's sufficiency gaps in EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components.

General Details:

The NRC staff held a public, observational meeting with EPRI representatives to discuss the NRC's staff's sufficiency gaps in EPRI Report 3002025288, Enhanced Risk-Informed Categorization Methodology for Pressure Boundary Components. The meeting began at 10:00 am and ended 4:00 pm. There were thirty-seven NRC staff members, eight EPRI representatives, two Nuclear Energy Institute representatives, eight industry members, and three members of the public or individuals who did not identify an affiliation. The meeting began with introductions of the NRC staff and EPRI representatives.

Summary of Meeting:

The NRC staff began the meeting by identifying key messages:

1.

What is meant by a detailed technical basis, why having one documented is essential to start a detailed review of the TR, and the path forward to getting to one.

2.

An adequate, detailed technical basis is necessary to answer the whys of the proposed methodology.

3.

Answering the whys of the proposed methodology is not only essential for the current review, but for the use of the methodology going forward.

The NRC staff and EPRI representatives held a detailed discussion of the whys:

Why does this criterion exist in your methodology?

Why is this criterion written exactly this way?

EPRI representatives stated that they understand the NRC staffs questions and concerns and will provide a supplement to the EPRI Report 3002025288 by June 14, 2024.

Public Participation Themes:

No member of the public spoke at the hybrid meeting.

Action Items/Next Steps:

The NRC staff will prepare and issue a meeting summary.

Attachments:

Meeting description and agenda - ADAMS Accession No. ML24117A331 NRC slide presentation - ADAMS Accession No. ML24117A256 EPRI slide presentation - ADAMS Accession No. ML24117A259

ATTENDEE LIST MEETING ON APRIL 30, 2024, TO DISCUSS SUFFICIENCY GAPS IDENTIFIED IN EPRI REPORT 3002025288 ON ENHANCED RISK-INFORMED CATEGORIZATION METHODOLOGY FOR PRESSURE BOUNDARY COMPONENTS (EPID NO. L-2023-TOP-0045)

April 30, 2024 Name NRC Participants David Beaulieu U.S. Nuclear Reactor Regulations (NRC)

David Bennardo NRC Mihaela Biro NRC Billy Blaney NRC Steven Bloom NRC John Bozga NRC Adrienne Brown NRC Mat Burton NRC Stephen Cumblidge NRC James Delosreyes NRC Stephen Dinsmore NRC Mike Franovich NRC Gerond George NRC Todd Hilsmeier NRC Jo Jacobs NRC Lois James NRC Michael King NRC Andrea Kock NRC Samuel Lee NRC Kamal Manoly NRC Matthew Mitchell NRC Demetrius Murray NRC Ching Ng NRC Carol Nove NRC Robert Pascarelli NRC Amar Patel NRC Jamie Pelton NRC Bo Pham NRC April Pulvirenti NRC Aida Rivera-Varona NRC Anthony Rossi NRC David Rudland NRC Jeff Smith NRC Robert Taylor NRC Shilp Vasavada NRC Name NRC Participants Sunil Weerakkody NRC Dan Widrevitz NRC EPRI Participants Name Affiliation James Cirilli Electric Power Research Institute (EPRI)

Fernando Ferante EPRI Rick Fougerousse EPRI Doug Kull EPRI Ashley Lindeman EPRI Jim Moody EPRI Patrick O'Regan EPRI Michael Ruszkowski EPRI NEI Participants Name Affiliation Victoria Anderson Nuclear Energy Institute (NEI)

Thomas Basso NEI Industry Participants Name Affiliation Roy Llinthicum Consellation Nuclear Jeff Stone Consellation Nuclear Jana Bergman Curtiss-Wrights Nuclear Regulatory Services Heather Davis Szews Duke Energy Jennifer Varnedoe Duke Energy Bob Post Enercon Kenneth L. Fossum Idaho National Laboratory Bradley Dolan Tennessee Valley Authority Public Participants Name Affiliation 3 unidentified individuals

ML24117A279 (NRC and EPRI slides are listed in summary)

^via eConcurrence

  • via email NRR-106 OFFICE DORL/LLPB/PM DORL/LLPB/LA DNRL/NPHP/BC DRA/APLA/BC NAME LJames^

DHarrison^

MMitchell*

BPascarelli^

DATE 06/05/2024 06/06/2024 06/10/2024 06/10/2024 OFFICE DORL/LLPB/BC DORL/LLPB/PM NAME GGeorge^

LJames^

DATE 06/10/2024 06/10/2024