March 11, 2025 Delson Erb Vice President, OPS Support Tennessee Valley Authority 1101 Market Street, LP 4A-C Chattanooga, TN 37402-2801

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2 AND 3 - REPORT 05000259/2024006, 05000260/2024006 AND 05000296/2024006

Dear Delson Erb:

The Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Browns Ferry Nuclear Plant, Units 1, 2 and 3, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2024, through December 31, 2024. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at Browns Ferry Nuclear Plant, Units 1 and 3, during the most recent quarter was within the Licensee Response Column (Column 1), the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility for these units.

Browns Ferry Nuclear Plant, Unit 2, was in the Regulatory Response Column (Column 2), the second highest performance category of the NRCs ROP Action Matrix, for the last two quarters of calendar year 2024 due to a Unit 2 high pressure coolant injection pump exhaust rupture disc failure on March 19, 2024. On January 15, 2025, the NRC was notified of your readiness for the supplemental inspection to review the actions taken to address the performance issues. The supplemental inspection was completed on February 13, 2025, in accordance with inspection procedure (IP) 95001, Supplemental Inspection Response to Action Matrix Column 2 (Regulatory Response) Inputs. The results of the supplemental inspection and NRCs ROP Action Matrix assessment for Browns Ferry Unit 2 will be documented in inspection report 05000260/2025040.

The enclosed inspection plan lists the inspections scheduled through December 31, 2026.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

D. Erb 2

This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact Louis McKown at (404) 997-4545 with any questions you may have regarding this letter.

Sincerely, Mark E. Franke, Director Division of Operating Reactor Safety Docket Nos. 05000259, 05000260, 05000296 License Nos. DPR-33, DPR-52, DPR-68

Enclosure:

Browns Ferry Inspection/Activity Plan (03/01/2025-12/31/2026) cc w/ encl: Distribution via LISTSERV Signed by Franke, Mark on 03/11/25

ML25066A107 X

SUNSI Review X

Non-Sensitive

Sensitive X

Publicly Available

Non-Publicly Available OFFICE RII / DORS RII / DORS RII / DORS RII / DORS NAME N. Childs T. Steadham L. McKown M. Franke DATE 3/7/25 3/7/25 3/7/25 3/11/25

Site Inspection Activity Plan 1 of 3 Browns Ferry 03/01/2025 - 12/31/2026 RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 2

1,2,3 3/3/2025 3/7/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2,3 3/3/2025 3/7/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2,3 3/3/2025 3/7/2025 IP 71124.04 000728 Occupational Dose Assessment 1,2,3 3/3/2025 3/7/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2,3 3/3/2025 3/7/2025 IP 71151 000746 Performance Indicator Verification 1,2,3 3/17/2025 3/21/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2,3 3/17/2025 3/21/2025 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2,3 3/17/2025 3/21/2025 IP 71124.04 000728 Occupational Dose Assessment 1,2,3 3/17/2025 3/21/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2,3 3/17/2025 3/21/2025 IP 71151 000746 Performance Indicator Verification SECURITY BASELINE INSPECTION 1

1,2,3 3/3/2025 3/6/2025 IP 71130.02 000734 Access Control 1,2,3 3/3/2025 3/6/2025 IP 71130.09 001656 Security Plan Changes 1,2,3 3/3/2025 3/6/2025 IP 71151 001338 Performance Indicator Verification UNIT 2 IN-SERVICE INSPECTION 1

2 3/10/2025 3/14/2025 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - BFN 5

1,2,3 4/28/2025 5/2/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2,3 5/19/2025 5/23/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing BROWNS FERRY INITIAL EXAM 4

1,2,3 3/30/2025 4/5/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV) 1,2,3 5/11/2025 5/24/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

ISFSI LICENSE RENEWAL 2

EMERGENCY PREPAREDNESS EXERCISE INSPECTION 5

1,2,3 6/23/2025 6/27/2025 IP 71114.01 000716 Exercise Evaluation 1,2,3 6/23/2025 6/27/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2,3 6/23/2025 6/27/2025 IP 71151 001397 Performance Indicator Verification COMPREHENSIVE ENGINEERING TEAM INSPECTION (CETI) 7 1,2,3 11/2/2025 11/8/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection 1,2,3 11/16/2025 11/22/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection MATERIAL CONTROL AND ACCOUNTING 1

1,2,3 6/16/2025 6/20/2025 IP 60859 Independent Spent Fuel Storage Installation (ISFSI) License Renewal Inspection Unit Start End Activity CAC Title Staff Count

Site Inspection Activity Plan 2 of 3 1,2,3 1/1/2026 3/31/2026 IP 71130.11 000742 Material Control and Accounting (MC&A)

TVA CORPORATE SECURITY INSPECTION AA/FFD (BF) 2 1,2,3 1/12/2026 1/15/2026 IP 71130.01 000733 Access Authorization 1,2,3 1/12/2026 1/15/2026 IP 71130.08 000740 Fitness-For-Duty Program SECURITY BASELINE INSPECTION 2

1,2,3 2/2/2026 2/5/2026 IP 71130.01 000733 Access Authorization 1,2,3 2/2/2026 2/5/2026 IP 71130.02 000734 Access Control 1,2,3 2/2/2026 2/5/2026 IP 71130.08 000740 Fitness-For-Duty Program 1,2,3 2/2/2026 2/5/2026 IP 71130.09 001656 Security Plan Changes 1,2,3 2/2/2026 2/5/2026 IP 71151 001338 Performance Indicator Verification RP OCCUPATIONAL RAD SAFETY AND TRANSPORTATION BASELINE INSPECTION 2

1,2,3 2/23/2026 2/27/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2,3 2/23/2026 2/27/2026 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1,2,3 2/23/2026 2/27/2026 IP 71151 000746 Performance Indicator Verification UNIT 3 IN-SERVICE INSPECTION 1

3 3/2/2026 3/6/2026 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2

1,2,3 4/6/2026 4/10/2026 IP 71114.02 000717 Alert and Notification System Testing 1,2,3 4/6/2026 4/10/2026 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2,3 4/6/2026 4/10/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2,3 4/6/2026 4/10/2026 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2,3 4/6/2026 4/10/2026 IP 71151 001397 Performance Indicator Verification OPERATION OF AN ISFSI 2

1,2,3 4/27/2026 5/1/2026 IP 60855 001001 Operation Of An ISFSI FOCUSED ENGINEERING INSPECTION (FPTI) 3 1,2,3 5/4/2026 5/8/2026 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI) 1,2,3 5/18/2026 5/22/2026 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

BROWNS FERRY INITIAL EXAM 4

1,2,3 4/5/2026 4/11/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV) 1,2,3 5/10/2026 5/23/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

RP PUBLIC RAD SAFETY BASELINE INSPECTION 2

1,2,3 6/1/2026 6/5/2026 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1,2,3 6/1/2026 6/5/2026 IP 71124.07 000731 Radiological Environmental Monitoring Program 1,2,3 6/1/2026 6/5/2026 IP 71151 000746 Performance Indicator Verification CYBER SECURITY INSPECTION 2

1,2,3 7/27/2026 7/31/2026 IP 71130.10 000741 Cybersecurity

Site Inspection Activity Plan 3 of 3 SECURITY BASELINE INSPECTION 2

UNIT 1 IN-SERVICE INSPECTION 1

PROBLEM IDENTIFICATION AND RESOLUTION 4

1,2,3 11/2/2026 11/6/2026 IP 71152B 000747 Problem Identification and Resolution 1,2,3 11/16/2026 11/20/2026 IP 71152B 000747 Problem Identification and Resolution BROWNS FERRY REQUAL 2

1,2,3 11/16/2026 11/20/2026 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance 1,2,3 8/24/2026 8/27/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2,3 8/24/2026 8/27/2026 IP 71130.07 000739 Security Training 1

9/21/2026 9/25/2026 IP 71111.08G 000701 Inservice Inspection Activities (BWR)