Enclosure 2 - NRC Pre-Application Meeting Slides
ML24348A191
Person / Time
Site: 07109319
Issue date: 12/10/2024
From:
Framatome
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML24348A189 List:
References
EPID L-2024-LLA-0084
Download: ML24348A191 (1)


Text

1 MAP License Amendment - December 10, 2024

© Framatome All right reserved NRC Pre-Application Meeting MAP Package Amendment Docket No. 9319 December 10, 2024

© Framatome All right reserved

2 MAP License Amendment - December 10, 2024

© Framatome All right reserved

1. Framatome Team
2. Project Description
3. Contents up to 8 wt.% 235U Enrichment
4. Criticality Evaluation a) Methods of Analysis b) Benchmarking c) Results
5. Drawing Changes
6. Proposed Schedule
7. Opportunity for Public Comment Agenda

3 MAP License Amendment - December 10, 2024

© Framatome All right reserved Framatome

Steve Cole, AFM Project Manager

Tim Tate, Manager, Environmental, Health, Safety, and Licensing

Calvin Manning, Manager, Licensing and Compliance

Brandon Hanson, Acting Manager, Licensing and Compliance

Bryan Flanagan, Packaging Engineer, Licensing and Compliance

Dan Talmadge, PWR Product Engineer

Michelle Guzzardo, Nuclear Criticality Safety Engineer

ORANO Federal Services

Chris Backus, Licensing Manager

Slade Klein, Engineering Manager

Erik Gonsiorowski, Nuclear Criticality Safety Engineer

Max Morrow, Nuclear Criticality Safety Engineer Framatome Team

4 MAP License Amendment - December 10, 2024

© Framatome All right reserved

1. Framatome Team
2. Project Description
3. Contents up to 8 wt.% 235U Enrichment
4. Criticality Evaluation a) Methods of Analysis b) Benchmarking c) Results
5. Drawing Changes
6. Proposed Schedule
7. Opportunity for Public Comment Agenda

5 MAP License Amendment - December 10, 2024

© Framatome All right reserved Project Description

Advanced Fuel Management (AFM) Project

Significantly reduce the utility customers operating costs in the near term by bringing to market technologies which increase cycle lengths and capacity factors

Reducing the number of refueling outages

Improving fuel cycle economics

Framatome is working in conjunction with a US reactor site to realize these benefits

NRC License Amendment Request

Increase allowable enrichment up to 8 wt.% 235U for all fuel assembly designs

Miscellaneous drawing changes to facilitate package manufacturing

Applicable for both the MAP-12 and MAP-13 packages

6 MAP License Amendment - December 10, 2024

© Framatome All right reserved

1. Framatome Team
2. Project Description
3. Contents up to 8 wt.% 235U Enrichment
4. Criticality Evaluation a) Methods of Analysis b) Benchmarking c) Results
5. Drawing Changes
6. Proposed Schedule
7. Opportunity for Public Comment Agenda

7 MAP License Amendment - December 10, 2024

© Framatome All right reserved Contents 8 wt.% 235U Enrichment

Type A and Type B Contents

Both Type A and Type B contents shall remain the same material, fuel pellets loaded in rods are uranium oxides primarily as ceramic UO2 and U3O8. The maximum enrichment is being increased to 8.0 wt.% 235U for all fuel assembly arrays and remains within high assay low enriched limits.

Contents Tables for <5 and 8.0 wt.% 235U Material

No changes to content tables

Allowable Quantities of Radioactive Material

No changes to allowable quantities

Gadolina Requirements

Gadolina requirements expanded to all array types for enrichment above 5.0 wt.%

8 MAP License Amendment - December 10, 2024

© Framatome All right reserved

1. Framatome Team
2. Project Description
3. Contents up to 8 wt.% 235U Enrichment
4. Criticality Evaluation a) Methods of Analysis b) Benchmarking c) Results
5. Drawing Changes
6. Proposed Schedule
7. Opportunity for Public Comment Agenda

9 MAP License Amendment - December 10, 2024

© Framatome All right reserved Criticality Evaluation

Methods of Analysis

Criticality evaluations performed using SCALE 6.3.1

CSAS6 (Keno-VI) with ENDF/B-VII.1 group library

Gd2O3 fuel rods used for criticality control (multiple configurations evaluated for different enrichments)

Modeling choices shown to be conservative in prior analyses are assumed still conservative for the new payload.

Licensing basis consistent with current SAR methodology to identify the most reactive credible configuration consistent with the chemical and physical form of the material

Configuration based on fuel at T.D. and fully flooded fuel cavity, void in outer cavity for HAC array

Benchmarking

Benchmark experiments were selected from the International Handbook of Evaluated Criticality Safety Benchmark Experiments (IHECSBE).

Methodology used to determine the Upper Safety Limit (USL) is consistent with NUREG-6698, Guide for Validation of Nuclear Criticality Safety Calculational Methodology.

Sensitivity/Uncertainty Analysis are being used to mathematically identify applicable critical experiments to the application model

TSUNAMI-3D (Scale module) used to generate sensitivity data file (SDF) for licensing basis application model

TSUNAMI-IP (Scale module) used to evaluate the similarity of critical experiments to application model (SDFs for critical experiments are taken from IHECSBE)

the bias and uncertainties associated with the calculation method, including use of the administrative subcritical margin of 0.05 to set an upper subcritical limit (USL) of 0.94083

10 MAP License Amendment - December 10, 2024

© Framatome All right reserved Criticality Evaluation

Selection of critical experiments

The critical experiments and the safety basis model need to use the nuclear data in a similar energy-dependent manner; otherwise, an incorrect bias could be generated

163 benchmarks used within the evaluation to calculate the USL

Correlation coefficients (Ck) were determined for each application/experiment model pair

All selected models have significantly more than 20 correlation coefficients above 0.90 showing that selected benchmarks are valid

11 MAP License Amendment - December 10, 2024

© Framatome All right reserved Criticality Evaluation

Results - Keff example

12 MAP License Amendment - December 10, 2024

© Framatome All right reserved Criticality Evaluation

Results - Gadolinia Requirements for >5 wt.% 235U Remaining Arrays

Includes CSI 8.3, 25, and 50 (not shown)

Clarification to be added: Required gadolinia rods may be placed asymmetrically. (Not required to be distributed symmetrically along the major diagonal as currently stated in license)

13 MAP License Amendment - December 10, 2024

© Framatome All right reserved

1. Framatome Team
2. Project Description
3. Contents up to 8 wt.% 235U Enrichment
4. Criticality Evaluation a) Methods of Analysis b) Benchmarking c) Results
5. Drawing Changes
6. Proposed Schedule
7. Opportunity for Public Comment Agenda

14 MAP License Amendment - December 10, 2024

© Framatome All right reserved

All changes implemented to facilitate fabrication of new packaging

Drawing 9045393 - BOM

Revised part number of items 53, 54, and 58 to reflect current Cherry Aerospace rivet nomenclature

Revised items 44, 45, 55, and 68 to include OR EQUIV to facilitate procurement of equivalent parts

Revised part number of item 55 to include next size rivet to allow appropriate grip length (with flag note)

Drawing Changes

15 MAP License Amendment - December 10, 2024

© Framatome All right reserved

Drawing 9045402

Removed 1/4 bevel weld callout. The U-channel used for the rail is tapered to 3/16 at the ends where the fillet weld is prescribed.

Drawing Changes

16 MAP License Amendment - December 10, 2024

© Framatome All right reserved

Drawing 9045403

Removed 1/8 weld size callout on flare bevel weld due to thickness of base material of 0.09 Drawing Changes

17 MAP License Amendment - December 10, 2024

© Framatome All right reserved

1. Framatome Team
2. Project Description
3. Contents up to 8 wt.% 235U Enrichment
4. Criticality Evaluation a) Methods of Analysis b) Benchmarking c) Results
5. Drawing Changes
6. Proposed Schedule
7. Opportunity for Public Comment Agenda

18 MAP License Amendment - December 10, 2024

© Framatome All right reserved

Schedule:

NRC Submittal - January 31, 2024

Amendment Request - 1 year, approximately January 2025 Proposed Schedule

19 MAP License Amendment - December 10, 2024

© Framatome All right reserved

1. Framatome Team
2. Project Description
3. Contents up to 8 wt.% 235U Enrichment
4. Criticality Evaluation a) Methods of Analysis b) Benchmarking c) Results
5. Drawing Changes
6. Proposed Schedule
7. Opportunity for Public Comment Agenda

20 MAP License Amendment - December 10, 2024

© Framatome All right reserved Opportunity for Public Comment

21 MAP License Amendment - December 10, 2024

© Framatome All right reserved Thank You