ML24304B030

From kanterella
Jump to navigation Jump to search

E-mail - Transmittal of Public Version of Draft Safety Evaluation for MRP-227, Revision 2, Pressurized Water Reactor Internals Inspection and Evaluations Guideline to Advisory Committee on Reactor Safeguards
ML24304B030
Person / Time
Site: Electric Power Research Institute
Issue date: 11/01/2024
From: Lois James
Licensing Processes Branch
To: Ballinger R
Advisory Committee on Reactor Safeguards
References
MRP-227, EPID L-2022-TOP-0029
Download: ML24304B030 (1)


Text

1 Lois James From:

Lois James Sent:

Friday, November 1, 2024 7:14 AM To:

Ronald Ballinger; Christopher Brown Cc:

RidsNrrOd Resource; RidsNrrDorl Resource; RidsNrrDorlLlpb Resource; RidsNrrDnrl Resource; RidsNrrDnrlNvib Resource; RidsNrrLADHarrison Resource; RidsACRS_MailCTR Resource; Lois James; Gerond George; James Medoff; Carol Moyer; John Tsao; Dan Widrevitz; kamberge@epri.com; msaucier@epri.com

Subject:

Transmittal of Public Version of Draft Safety Evaluation for MRP-227, Revision 2, Pressurized Water Reactor Internals Inspection and Evaluations Guideline to Advisory Committee on Reactor Safeguards (EPID L-2022-TOP-0029)

Ronald G. Ballinger, Chair Fuels, Materials, and Structures Subcommittee Advisory Committee on Reactor Safeguards Nuclear Regulatory Commission

Dear Ronald Ballinger,

My letter dated May 9, 2022 (Agencywide Documents Access Management System (ADAMS) Accession No. ML22129A138), the Electric Power Research Institute (EPRI) submitted technical report Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines (MRP-227, Revision 2) to the U.S. Nuclear Regulatory Commission (NRC) staff for review and approval (Agencywide Documents Access and Management System Accession No. ML21301A194). The staff reviewed and accepted the technical report on June 17, 2022 (ADAMS Accession No. ML22145A401).

By email dated September 30, 2024 (ADAMS Accession No. ML24233A065), the NRC staff issued the draft SE to EPRI for a proprietary review to ensure that no sensitive unclassified nonsafeguards information (SUNSI) is accidently released in violation of Section 2.390 of Title 10 of the Code of Federal Regulations (10 CFR).

By email dated October 30, 2024 (ADAMS Accession No. ML24304B021), EPRI responded and informed the NRC that the SE does not contain any SUNSI. Therefore, the NRC staff is releasing the September 30, 2024, SE to support the November 2024 meeting between the NRC staff and the Fuels, Materials, and Structures Subcommittee of the Advisory Committee on Reactor Safeguards.

The publicly available draft SE can be found at Agencywide Documents Access Management System (ADAMS) Accession No. ML24304B031 and will be available after November 1, 2024.

If you have any questions, please feel free to contact me at lois.james@nrc.gov.

Lois James, Senior Project Manager Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.: 99902021 EPID: L-2022-TOP-0029 ADAMS Accession Nos.: ML24304B019 (pkg); ML24304B030 (email); ML24304B031 (nonproprietary draft SE) ^via eConcurrence *via email NRR-106

2 OFFICE DORL/LLPB/PM DORL/LLPB/BC DORL/LLPB/PM NAME LJames*

GGeorge*

LJames*

DATE 10/30/2024 10/31/2024 11/01/2024 OFFICIAL RECORD COPY