MRP-227, Revision 2, PWR Internals Inspection and Evaluations Guideline - E-mail for Completeness Review
ML22145A444
Person / Time
Site: Electric Power Research Institute
Issue date: 06/17/2022
From: Lois James
Licensing Processes Branch
To: Amberge K, Mcgill R
Electric Power Research Institute, Southern Nuclear Operating Co
Lois James, NRR/DORL/LLPB, 301-415-3306
Shared Package
ML22145A401 List:
References
EPID L-2022-TOP-0029, MRP-227, Rev 2
Download: ML22145A444 (1)


Text

From:

James, Lois To:

McGill, Robert; Amberge, Kyle Cc:

James, Lois; Chang, Richard; Medoff, James; Buford, Angie; Moyer, Carol; Tsao, John

Subject:

NRC Staff Acceptance for MRP-227, Revision 2, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines (EPID L-2022-TOP-0029)

Date:

Friday, June 17, 2022 11:20:01 AM Attachments:

MRP-227 Revision 2 PWR Internals Inspection and Evaluations Guideline - NRC 898 Completeness - signed.pdf Brad Adams, Chairman, PMMP EC, Southern Nuclear Robert O. McGill, MRP Program Manager, Electric Power Research Institute CC: Morgan Saucier, Kyle Amberge Materials Reliability Program 3420 Hillview Avenue Palo Alto, CA 94304-1338

SUBJECT:

NRC Staff Acceptance for MRP-227, Revision 2, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines (EPID L-2022-TOP-0029)

Attached please find the completed form for the U.S. Nuclear Regulatory Commission staff completeness determination for MRP-227, Revision 2, Materials Reliability Program:

Pressurized Water Reactor Internals Inspection and Evaluation Guidelines.

The schedule assumes that the safety evaluation associated with MRP-227, Revision 2, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guidelines, is not a rule in accordance with the Congressional Rule Act.

If you have any questions, please feel free to contact me at lois.james@nrc.gov.

Lois M. James, Sr. Project Manager Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.: 99902021 EPID: L-2022-TOP-0029 ADAMS No.: ML22145A401 (pkg); ML22145A444 (email); ML22145A445 (Form 898)