ML24199A074

From kanterella
Jump to navigation Jump to search

Memo and Enclosure 1: Summary of June 20, 2024, Meeting with Holtec International
ML24199A074
Person / Time
Site: 07109397
Issue date: 07/19/2024
From: Pierre Saverot
Storage and Transportation Licensing Branch
To: Roman C
Division of Fuel Management
Shared Package
ML24199A065 List:
References
EPID L-2022-NEW-0002
Download: ML24199A074 (1)


Text

OFFICIAL USE ONLYPROPRIETARY INFORMATION OFFICIAL USE ONLYPROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 MEMORANDUM TO: Cinthya Román, Deputy Director Division of Fuel Management Office of Nuclear Material Safety and Safeguards FROM: Pierre Saverot, Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards

SUBJECT:

SUMMARY

OF JUNE 20, 2024, MEETING WITH HOLTEC INTERNATIONAL

Background

On June 20, 2024, an Observation Public Meeting was held by teleconference between the U.S.

Nuclear Regulatory Commission staff and representatives from Holtec International (Holtec, or the applicant) to discuss a pending amendment request for the Model No. HI-STAR 330 package.

This Observation Public Meeting was noticed on May 29, 2024 (Agencywide Documents Access and Management System Accession No. ML24149A141). The attendance list and the publicly available presentation slides are provided as Enclosure Nos. 1 and 2, respectively.

Discussion Holtec requested this meeting to present the design for a new package, the Model No. HI-STAR 330 package (Docket No. 71-9397).

The Model No. HI-STAR 330 is designed to transport reactor-related waste in a solid form, such as Top Guides/Core Grids, Core Shrouds, Core Shroud Heads, as well as secondary wastes (i.e. debris/chips/fines) generated by the mechanical cutting process, chip drums with surface contamination, etc., with a maximum weight of 110,000 lbs., including the secondary packaging (liner tanks) and dunnage.

CONTACT: Pierre Saverot, NMSS/DFM 301-415-7505Enclosure 3 transmitted herewith contains proprietary information. When separated from the sensitive conditions in Enclosure 3, this memorandum and Enclosures 1 and 2 are decontrolled.July 19, 2024 Signed by Saverot, Pierre on 07/19/24

OFFICIAL USE ONLYPROPRIETARY INFORMATION C. Román 2

Holtec explained that the cask is not submerged in pool for waste loading operations and that the secondary packaging, if submerged in pool, will be procedurally controlled to limit moisture content. The secondary packaging, i.e., the liner tank, is used for that purpose with or without a cassette for waste loading operations.

Holtec explained that the package design, the materials selected, and the safety analyses approaches follow the licensing approach for the Model No. HI-STAR ATB 1T, and also include lessons learned from the licensing effort of the HI-STAR ATB1T. In particular, the shielding MCNP geometry of the HI-STAR 330 is very similar to the one of the HI-STAR ATB 1T with only minor geometric changes. Likewise, only conduction and radiation heat transfer are credited in the package and only the bounding scenario of the waste heat load distribution is evaluated.

Holtec explained those approaches are reasonable based on the comparison - as well as similarities - of the designs between the ATB 1T and the HI-STAR 330.

Holtec intends to submit an application in September 2024 and will request approval by February 2026.

Staff said it understood well the licensing approach as presented and had a few specific questions on each technical discipline during the proprietary session, including testing required for the crushable material of the impact limiters, evaluation of pressures inside the package, fixed versus non-fixed contamination, etc.

No regulatory commitments were made during this meeting.

Docket No. 71-9397 EPID L-2022-NEW-0002

Enclosures:

1. Meeting Attendees
2. Public Presentation Slides
3. Proprietary Presentation Slides

OFFICIAL USE ONLYPROPRIETARY INFORMATION

ML24199A065(Pkg); ML24199A074(Ltr & Encl1);

ML24199A081(Encl2); ML24199A084(Encl3, non-public)

OFFICE NMSS/DFM NMSS/DFM NMSS/DFM NMSS/DFM NAME PSaverot SFigueroa YDiaz-Sanabria PSaverot DATE 7/17/2024 7/17/2024 7/19/2024 7/19/2024

OFFICIAL USE ONLYPROPRIETARY INFORMATION

Meeting Between Holtec International and the U.S.

Nuclear Regulatory Commission June 20, 2024 Meeting Attendees

The U.S. Nuclear Regulatory Commission

Pierre Saverot Sujit Samaddar Jennifer Gutierrez Jason Huang Joe Borowski

Holtec

Ali Elzhari Debu Majumdar Abrar Mohammad Kim Manzione Robert Tinker Robert Mahorter Giancarlo Delfini Venkat Prabhala Justin Sledzinski Emanuel Chirayath Stanislav Kravets

PUBLIC

Carlyn Greene

Enclosure 1 OFFICIAL USE ONLYPROPRIETARY INFORMATION