Letter Sequence Meeting |
|---|
EPID:L-2023-LLA-0124, NAC International, Inc., Submission of a Request to Revise the NAC-LWT Certificate of Compliance (CoC) to Permit LANL MOX Fuel Rods as Approved Contents for Transport (Approved, Closed) |
|
MONTHYEARML24011A2772024-01-11011 January 2024 NAC International, Inc., Submission of a Request to Revise the NAC-LWT Certificate of Compliance (CoC) to Permit LANL MOX Fuel Rods as Approved Contents for Transport Project stage: Request ML24080A3532024-03-21021 March 2024 Acknowledgement Letter for Certificate of Compliance 9225 Amendment to Add Mixed Oxide Rods Project stage: Other ML24108A1502024-04-17017 April 2024 Notice of Partially Closed Post Submittal Meeting with Holtec International (Holtec) to Add Unirradiated Los Alamos National Laboratory Mixed Oxide Fuel as Authorized Contents in the Model No. NAC-LWT Package Project stage: Meeting ML24109A1992024-04-18018 April 2024 Revised Notice of Partially Closed Post Submittal Meeting with Holtec International (Holtec) to Add Unirradiated Los Alamos National Laboratory Mixed Oxide Fuel as Authorized Contents in the Model No. NAC-LWT Package Project stage: Meeting ML24109A2852024-04-18018 April 2024 Revised Notice of Partial Closed Post Submittal Meeting with NAC International to Add Unirradiated Los Alamos National Laboratory Mixed Oxide Fuel as Authorized Contents in the Model No. NAC-LWT Package Project stage: Meeting ML24150A2072024-04-30030 April 2024 NAC International - NAC-LWT, Legal Weight Truck Cask System, Safety Analysis Report, RAI Responses LANL MOX, Revision 24B, Non-Proprietary Version Project stage: Request ML24178A3572024-05-0101 May 2024 Enclosure 2 - NAC-LWT LANL MOX, Rev. 00 Non-Proprietary Meeting Slides Project stage: Meeting ML24114A0302024-05-10010 May 2024 Enclosurequest for Additional Information for NAC-LWT Amendment Project stage: RAI ML24114A0282024-05-10010 May 2024 Application for Revision of Certificate of Compliance No. 9225 for the Model No. NAC-LWT Transportation Package - Request for Additional Information Project stage: RAI ML24150A2062024-05-28028 May 2024 NAC International - Submission of a Responses to the Nuclear Regulatory Commission Request for Additional Information for the Request to Revise the NAC-LWT Certificate of Compliance (CoC) to Permit LANL MOX Fuel Rods as Approved Contents Fo Project stage: Request ML24162A2712024-06-11011 June 2024 Enclosure - Request for Additional Information NAC-LWT Fecral Cladding Project stage: RAI ML24162A2722024-06-11011 June 2024 Letter Issuing First Request for Additional Information for NAC-LWT Fecral Amendment Project stage: RAI ML24178A3552024-06-19019 June 2024 Enclosure 4 - NAC International Affidavit for Proprietary Slides NAC-LWT MOX Meeting Project stage: Meeting ML24178A3582024-06-27027 June 2024 Memorandum - Summary of May 1 2024 Meeting with NAC International on LANL MOX Fuel Project stage: Meeting ML24240A0542024-09-0606 September 2024 Enclosure 1 - Certificate of Compliance 9225 Revision 75 Project stage: Other ML24240A0532024-09-0606 September 2024 Letter and Enclosure 2 Safety Evaluation Report - Revision 75 to Certificate of Compliance 9225 Project stage: Approval 2024-05-01
[Table View] |
Text
The Skills and Experience to Deliver Nuclear Excellence Date: May 1, 2024 (Open Session)
NAC-LWT LANL MOX Fuel Rods Revised Design Meeting
Agenda
- Overview Original Request Revised Request Mike Valenzano - Project Manager Holger Pfeifer - Director, Engineering Marc Griswold - Manager, Applied Mechanics Kevin Klein - Manager, Design Heath Baldner - Director Licensing Others - as needed
3
© NAC International, Inc.
Original Request
- Request to revise the NAC-LWT CoC to permit LANL MOX Fuel Rods as approved contents for transport submitted to NRC on January 11, 2024 Content change to allow up to sixteen (16) transfer tubes filled with LANL MOX Fuel Rods The transfer tubes must be loaded in the PWR/BWR transport can assembly including the divider assembly Different types of LANL MOX fuels may be loaded in the same package but only one fuel type may be loaded into any one Transfer Tube
4
© NAC International, Inc.
Revised Request
- Engineering determined the divider assembly does not perform a safety function Removed divider assembly from SAR structural and criticality analysis Simplified divider assembly design and made optional