ML24088A309

From kanterella
Jump to navigation Jump to search
LLC, Submittal of Human Factors Engineering Task Analysis Implementation Plan, TR-130413, Revision 1
ML24088A309
Person / Time
Site: 05200050
Issue date: 03/28/2024
From: Fosaaen C
NuScale
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML24088A308 List:
References
LO-158053, TR-130413-P, Rev 1
Download: ML24088A309 (1)


Text

LO-158053

March 2, 2024 Docket No.52-050

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738

SUBJECT:

NuScale Power, LLC Submittal of Human Factors Engineering Task Analysis Implementation Plan, TR-130413, Revision 1

REFERENCES:

1. NuScale letter to NRC, NuScale Power, LLC, Human Factors Engineering Task Analysis Implementation Plan, TR-130413-P, Revision 0 (ML23304A376), attachment to NuScale Power, LLC letter to U.S. Nuclear Regulatory Commission, NuScale Power, LLC Submittal of the NuScale Standard Design Approval Application, Revision 1, October 31, 2023 (ML23304A316).

NuScale Power, LLC (NuScale) hereby submits Revision 1 of the Human Factors Engineering Task Analysis Implementation Plan, TR-130413. This revision includes changes made during the Standard Design Approval Application audit. The next revision of the Standard Design Approval Application (Revision 2) will reference this revision of TR-130413.

contains the proprietary version of the report entitled Human Factors Engineering Task Analysis Implementation Plan, TR-130413-P, Revision 1. NuScale requests that the proprietary version be withheld from public disclosure in accordance with the requirements of 10 CFR § 2.390. The enclosed affidavit (Enclosure 3) supports this request. Enclosure 2 contains the nonproprietary version of the report.

This letter makes no regulatory commitments and no revisions to any existing regulatory commitments.

If you have any questions, please contact Thomas Griffith at 541-452-7813 or at tgriffith@nuscalepower.com.

I declare under penalty of perjury that the foregoing is true and correct. Executed on March 2, 2024.

Sincerely,Sincerely,

CaCarrie Fosaaen rrieFosaaen Vice President, Regulatory Affairs NuScale Power, LLC

NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvallis, Oregon 97330 Office 541.360.0500 Fax 541.207.3928 www.nuscalepower.com LO-158053 Page 2 of 2 03/2 /24

Distribution: Mahmoud Jardaneh, NRC Getachew Tesfaye, NRC Thomas Hayden, NRC

Human Factors Engineering Task Analysis Implementation Plan, TR-130413-P, Revision 1, proprietary version : Human Factors Engineering Task Analysis Implementation Plan, TR-130413-NP, Revision 1, nonproprietary version : Affidavit of Carrie Fosaaen, AF-158055

NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvallis, Or egon 97330 Office 541.360.0500 Fax 541.207.3928 www.nuscalepower.com LO-158053

Human Factors Engineering Task Analysis Implementation Plan, TR-130413-P, Revision 1, proprietary version

NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvallis, Oregon 97330 Office 541.360.0500 Fax 541.207.3928 www.nuscalepower.com

LO-158053

Human Factors Engineering Task Analysis Implementation Plan, TR-130413-NP, Revision 1, nonproprietary version

NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvallis, Oregon 97330 Office 541.360.0500 Fax 541.207.3928 www.nuscalepower.com

Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1 Licensing Technical Report

Human Factors Engineering Task Analysis Implementation Plan

March 2024 Revision 1 Docket: 52-050

NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvallis, Oregon 97330 www.nuscalepower.com

© Copyright 2024 by NuScale Power, LLC

© Copyright 2024 by NuScale Power, LLC i

Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1 Licensing Technical Report

COPYRIGHT NOTICE

This document bears a NuScale Power, LLC, copyright notice. No right to disclose, use, or copy any of the information in this document, other than by the U.S. Nuclear Regulatory Commission (NRC), is authorized without the express, written permission of NuScale Power, LLC.

The NRC is permitted to make the number of copies of the information contained in these reports needed for its internal use in connection with generic and plant-specific reviews and approvals, as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CFR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by NuScale Power, LLC, copyright protection notwithstanding.

Regarding nonproprietary versions of these reports, the NRC is permitted to make the number of additional copies necessary to provide copies for public viewing in appropriate docket files in public document rooms in Washington, DC, and elsewhere as may be required by NRC regulations. Copies made by the NRC must include this copyright notice in all instances and the proprietary notice if the original was identified as proprietary.

© Copyright 2024 by NuScale Power, LLC ii Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1 Licensing Technical Report

Department of Energy Acknowledgement and Disclaimer

This material is based upon work supported by the Department of Energy under Award Number DE-NE0008928.

This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights.

Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.

© Copyright 2024 by NuScale Power, LLC iii Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

Table of Contents

Abstract................................................................... 1 Executive Summary.......................................................... 2 1.0 Introduction.......................................................... 3 1.1 Purpose.............................................................. 3 1.2 Scope................................................................ 3 1.3 Abbreviations.......................................................... 4 2.0 Implementation........................................................ 6 2.1 Task Analysis Process Overview........................................... 6 2.2 Task Analysis Team Composition and Responsibilities.......................... 8 3.0 Methodology......................................................... 10 3.1 Task Analysis Development.............................................. 10 3.2 Task Identification..................................................... 12 3.3 Task Determination Methodology......................................... 12 3.3.1 Normal, Abnormal, Emergency, and Alarm Response Procedure Tasks..... 12 3.3.2 Surveillance, Test, Inspection, and Maintenance Procedure Tasks.......... 13 3.3.3 Tasks with Potentially Negative Consequences (Not Identified as Important Human Actions)................................................. 13 3.4 Operational Sequence Diagrams.......................................... 14 3.5 Detailed Task Narratives................................................ 15 3.5.1 Time Required for Performing Tasks................................. 16 3.5.2 Personnel Required for Performing Tasks............................. 17 3.5.3 Task Support Requirements........................................ 17 3.5.4 Task Considerations.............................................. 18 3.5.5 Inventory of Alarms, Controls, and Displays........................... 20 3.5.6 Knowledge and Abilities Identification................................ 20 3.6 Iterative Nature of Task Analysis.......................................... 21 3.6.1 Functional Requirements Analysis and Function Allocation and Task Analysis Database............................................... 22 3.6.2 New Task Criteria................................................ 22 3.7 Analysis of Feasibility and Reliability for Important Human Actions................ 23 4.0 References.......................................................... 24 4.1 Source Documents..................................................... 24

© Copyright 2024 by NuScale Power, LLC iv Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

Table of Contents

4.2 Referenced Documents................................................. 24

© Copyright 2024 by NuScale Power, LLC v

Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

List of Tables

Table 1-1 Abbreviations.................................................... 4 Table 1-2 Definitions....................................................... 4 Table 3-1 Task Considerations.............................................. 19 Table 3-2 VISION Icon Descriptions........................................ 22

© Copyright 2024 by NuScale Power, LLC vi Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

List of Figures

Figure 2-1 Database Structure............................................... 8 Figure 3-1 Task Analysis Flow Path.......................................... 11 Figure 3-2 Operational Sequence Diagram Task Decomposition Example............ 15

© Copyright 2024 by NuScale Power, LLC vii Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

Abstract

The task analysis is a significant element of the Human Factors Engineering Program. The purpose of the task analysis is to analyze human actions that are allocated to personnel during the function allocation process.

The functions allocated to plant personnel define the roles and responsibilities that can be accomplished via human actions or tasks. The results of the task analysis provide inputs to the following Human Factors Engineering activities: staffing and qualifications, human-system interface design, procedure development, training program development, treatment of important human actions, and task support verification (human factors verification and validation).

This implementation plan documents the methodology used in the task analysis process. The process used is consistent with the applicable provisions of Section 5 of NUREG-0711 (Reference 4.1.1).

© Copyright 2024 by NuScale Power, LLC 1

Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

Executive Summary

Consistent with the guidance of NUREG-0711 (Reference 4.1.1) Section 5, the scope of the task analysis (TA) performed by NuScale includes a method to identify: the specific tasks, the personnel required to perform the tasks, and the alarms, displays, controls, and task support needed to perform those tasks.

Functions allocated to human and system resources are determined during the function allocation process and made into tasks. The tasks are arranged into specific job categories and assigned to staff positions (e.g., licensed and non-licensed operators). The alarms, displays, controls and task support needed are design inputs for developing staffing and qualifications, human-system interface design, procedure development, training program development, treatment of important human actions, and task support verification (human factors verification and validation).

This implementation plan is organized into four major sections and appendices. Section 1.0 describes the purpose and scope of the TA. Section 2.0 provides an overview of the TA implementation process and a description of the TA team composition and responsibilities.

Section 3.0 describes the methodology and specifies the criteria for performing the task analysis.

The source and referenced documents applicable to and used in the TA effort are listed in Section 4.0.

© Copyright 2024 by NuScale Power, LLC 2

Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

1.0 Introduction

1.1 Purpose

This implementation plan (IP) describes a methodology for the task analysis (TA) for the NuScale Power Plant as part of the Human Factors Engineering (HFE) Program. This IP also includes the methodology used to achieve the results. The inputs from the HFE Program elements are described and the outputs from the TA elements are identified.

1.2 Scope

This IP is focused on TA for activities performed by licensed operators in the main control room during normal, abnormal, and emergency operating conditions. Maintenance or refueling activities, activities completed by craft and technical personnel (e.g.,

mechanical, electrical, or instrumentation and control (I&C) maintenance; health physics; chemistry; engineering; or information technology), or activities associated with the Technical Support Center, Emergency Operations Facility, or other Emergency Response facilities are not included in the TA focus unless those activities are determined to impact licensed operator workload.

The tasks selected for analysis represent a range of plant operating modes, including startup, normal operations, low-power and shutdown conditions, transient conditions, abnormal conditions, emergency conditions, and severe accident conditions. The methodology for selection of the tasks is described in Section 3.2.

© Copyright 2024 by NuScale Power, LLC 3

Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

1.3 Abbreviations Table 1-1 Abbreviations Term Definition D3CA diversity and defens e-in-depth coping analysis DHRS decay heat removal system FA function allocation FRA/FA functional requirements analysis and function allocation HFE Human Factors Engineering HSI human-system interface I&C instrumentation and controls IHA important human action IP implementation plan KA knowledge and abilities MSIV main steam isolation valve OER operating experience review OSD operational sequence diagram PRA Probabilistic Risk Assessment RSR results summary report SME subject matter expert S&Q staffing and qualifications TA task analysis TIHA treatment of important human actions

Table 1-2 Definitions Term Definition Element A discrete human action executed to support a task.

FRA/FA The identification of functions th at must be performed to satisfy the nuclear power plants overall goals. Function allocation determines which tasks are manual, automatic, or a combination of the two.

FRA/FA & TA database The VISION Developer applic ation is a relational database that is used to store the FRA/FA, ta sk analysis, staffing and qualifications analysis, development of human-system interface s (HSI), procedure s, and training data. In this document it is also referred to as the FRA/FA & TA database or database.

Module A NuScale module consists of the co ntainment vessel, reactor pressure vessel, and all components internal and external to each vessel, up to the disconnect flanges.

Plant functions The plant functions describe how the plant meets NuScales mission statement of safe, scalable, affor dable, electrical generation using nuclear power.

SME An individual with appropriate knowledg e in a specific area or discipline that has sufficient experience and education to competently develop or review a licensing topical re port in that discipline.

Task A group of activities with a common purpose, often undertaken in close temporal proximity.

© Copyright 2024 by NuScale Power, LLC 4

Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

Table 1-2 Definitions (Continued)

Term Definition Unit A NuScale unit consists of th e components necessary to generate electricity. This includes a prim ary side containing a reactor power module and its specific supporting systems, and a secondary side containing a turbine gene rator and its specific supporting systems.

© Copyright 2024 by NuScale Power, LLC 5

Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

2.0 Implementation

2.1 Task Analysis Process Overview

The purpose of TA is to systematically determine the requirements for information, control, and task support. The TA results establish HSI inventory requirements, including alarms, controls, displays, procedures, and training programs to support accomplishment of tasks. The TA encompasses a range of plant operating conditions, including startup, normal operations, low-power and shutdown conditions, transient conditions, abnormal conditions, emergency conditions, and severe accident conditions.

Input to TA from HFE Program elements include the following:

Tasks identified in the operating experience review (OER) as human performance issues are evaluated for similarity with tasks identified for the plant. The TA confirms that the human performance issues are resolved by the plant design or HSI. The TA also resolves task-related human engineering issues identified during OER.

Human actions, as determined in the functional requirements analysis and function allocation (FRA/FA) process (Reference 4.2.2), are decomposed during TA to identify control tasks and related monitoring tasks. Actions allocated to a machine (automation) are decomposed to identify tasks for monitoring and then TA confirms the allocations.

Important human actions (IHAs) identified by the Probabilistic Risk Assessment (PRA), transient and accident analysis, and diversity and defense-in-depth coping analyses (D3CA) are analyzed for feasibility and reliability in the TA. Time constraints on IHAs are analyzed to allow for performance-shaping factors and the necessary added time margins for completion of the task.

Output from TA to other HFE Program elements includes the following:

The HSI inventory and its characteristics generated by the TA include the alarms, controls, displays, and procedures needed to monitor plant-critical functions, as well as to monitor and control their success paths. The HSI design uses the detailed TA results and inventory of alarms, controls, and displays to establish alarm logic, display and control designs, procedure step acceptance criteria, and grouping of HSI inventory, especially for task-oriented screens. Staffing assumptions related to roles and responsibilities of operators and crew size are developed for the concept of operations portion of the HSI design.

Tasks are arranged into specific job categories and assigned to staff positions (e.g.,

licensed operators, non-licensed operators). These assignments are analyzed in the staffing and qualifications (S&Q) HFE element.

Tasks are assigned knowledge and abilities (KA) required to perform the tasks. These KA requirements provide the foundation for the Operator Training Program development.

© Copyright 2024 by NuScale Power, LLC 6

Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

The TA information is captured in the FRA/FA & TA database that contains the FRA/FA information and is described in further detail in Section 3.6.1. The database is divided into three hierarchies: analysis, objective design, and program development.

((2(a),(c)

© Copyright 2024 by NuScale Power, LLC 7 Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

Figure 2-1 Database Structure ((

}}2(a),(c)

2.2 Task Analysis Team Composition and Responsibilities

The TA is conducted and supported by an experienced team that includes input from the HFE team and from the System Engineering, Safety Analysis, and Operations organizations. The qualifications of the HFE team members are as stipulated in the NuScale HFE Program Management Plan (Reference 4.2.1).

The TA team lead and the remainder of the team are selected by the HFE supervisor from the HFE team members. As described in the HFE Program Management Plan, the HFE supervisor has the authority and organizational placement to reasonably ensure that the tasks assigned to the TA personnel who do not directly report to the supervisor are completed.

The TA team includes an FRA/FA & TA database coordinator. Assigned by the team lead, the database coordinator is responsible for managing the information that is recorded in the FRA/FA & TA database.

The TA team includes senior reactor operators and other personnel with experience in the operation of commercial nuclear power plants.

© Copyright 2024 by NuScale Power, LLC 8 Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

A TA team and TA team lead are selected by the HFE supervisor from available HFE team members to conduct TA. The TA team lead is responsible for organizing the TA team. directing the development of the FRA/FA & TA database. assigning team member responsibilities. managing resources and review schedule. ensuring that TA issues are completed with supporting documentation and entered into the Human Factors Engineering issue tracking system as necessary. production of the FRA/FA & TA database reports.

Responsibilities of TA team members conducting the reviews and completing disposition of the individual review items include reviewing TA documentation for identification of

- accuracy of the functional requirements analysis.
- task determination.

reviewing the database and using reports to cross examine the results. continuing revisions to the data as necessary.

The FRA/A & TA database coordinator is responsible for ensuring the data are properly entered in the database. The database coordinator is also responsible for formatting and running reports to provide output from the database.

© Copyright 2024 by NuScale Power, LLC 9 Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

3.0 Methodology

The HFE Program includes TA as part of a series of analyses that relies primarily on design documents, subject matter experts (SME), and operating experience. The TA is a resource for S&Q, development of HSI, procedures, and training programs. For efficiency, the team conducts the FRA/FA and TA in sequence or in parallel, depending on the complexity of the functions and associated tasks. Where functions and tasks are not complex, have low safety significance, or are not expected to vary significantly from how other commercial nuclear power plants conduct them, the FRA, FA, and TA sequence may extend further to include preliminary development of HSI, procedures, and training.

The TA methodology remains the same whether conducted alone or as the first step in a series. Rigid sequencing is not practical for HFE analyses as the iterative nature of both the design and the HFE process necessitates flexibility. For example, new or modified tasks in the task analysis would require updating the function allocation table; conversely, changes to the function allocation table are reflected in the task analysis. Those changes are made or the necessary changes become HFE issues and are tracked using Human Factors Engineering issues tracking system.

3.1 Task Analysis Development

The step sequence for TA development (Figure 3-1) is as follows:

1. screen for applicable tasks
2. develop detailed task narrative
3. decompose tasks
4. develop operational sequence diagram
5. verify IHAs
6. identify task attributes
7. identify high workload tasks
8. identify task job position
9. determine KAs
10. define task support requirements
11. identify performance shaping factors (assess workload)
12. determine inventory of components, alarms, displays, and controls to support accomplishment of tasks
13. output to HSI usability testing, control room staffing plan validation, procedures, and training
14. review modified tasks or new tasks for TA development

© Copyright 2024 by NuScale Power, LLC 10 Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

Not all steps are conducted for each task. The TA is iterative and higher levels of analysis are conducted as the plant design progresses. Also, as noted below, more complex tasks result in more detailed task narratives and involve more aspects of the overall TA. The TA steps may be omitted or conducted out of sequence during some iteration. The overall TA process is shown in Figure 3-1.

Figure 3-1 Task Analysis Flow Path

Task Analysis Inputs Representative modes of operation considered (non-inclusive list):

  • FRA/FA
  • operating experience
  • safety analyses
  • administrative processes New or Modified Tasks
  • maintenance and surveillances
  • design basis transients
  • operations procedures, operational scenarios, integrated evolutions
  • SME input Type of Tasks
  • IHAs
  • Plant operations (e.g., startup, normal operations, shutdown)
  • Abnormal, transient, emergency, and severe accident conditions
  • Alarm responses Task Screening
  • Tasks with potentially negative consequences (not IHAs)
  • New tasks or tasks performed differently in past designs
  • Automation monitoring; automation failure or degradation
  • Tasks anticipated to impose high demands on personnel (e.g.,

little time or high workload)

  • Surveillance, test, inspection and maintenance procedures Develop Task Narratives
  • Tasks with potential concerns for personnel safety

Task Decomposition

Create OSD when

  • safety-related system failures Operational Sequence would result in challenge to a high Diagrams level function
  • IHA

Verify IHAs

High workload tasks include: Define Task Support Identify Task Attributes

  • IHA Requirements
  • High stress
  • High consequence Identify High Workload Tasks
  • High coordination and communication Identify Performance Shaping
  • High cognitive or physical Factors
  • High frequency
  • High time pressure or short response time Identify Task Job Position
  • Abnormal and emergency conditions Determine Inventory

Define Knowledges & Abilities Output to HSI Usability Testing, Workload Analysis, Procedures and Training

© Copyright 2024 by NuScale Power, LLC 11 Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

3.2 Task Identification

Tasks to be analyzed represent a range of plant operating modes including startup, normal operations, low-power and shutdown conditions, transient conditions, abnormal conditions, emergency conditions, and severe accident conditions.

All tasks, regardless of importance, are analyzed so that the full extent of the work load can be determined. Examples of tasks to be analyzed include, but are not limited to, the following: The IHAs determined through the human reliability portion of the PRA and deterministic means (e.g., transient and accident analysis, D3CA). The TA for IHAs assumes use of the alarms, controls, displays, automation, and procedures that are normally available and operable during the scenario being analyzed. Tasks not identified as IHAs through probabilistic or deterministic means but that have negative consequences if performed incorrectly. Tasks that are identified to be new, compared to operating nuclear plants. Tasks that, while not new, are performed differently from operating nuclear plants. Tasks related to monitoring and control of automated systems that have augmented quality requirements, and to the use of automated support aids for personnel, such as computer-based procedures. Tasks related to identifying the failure or degradation of automation, and implementing backup responses. Tasks anticipated to impose high demands on personnel (e.g., administrative tasks that contribute to workload and challenge ability to monitor the plant). Tasks that are undertaken during maintenance, tests, inspections, and surveillances. Tasks with potential concerns for personnel safety.

Identification of tasks to be analyzed is performed by SMEs on the basis of their experience at operating nuclear plants. The process includes review of operating experience and available system design material.

3.3 Task Determination Methodology

3.3.1 Normal, Abnormal, Emergency, and Alarm Response Procedure Tasks

All tasks within scope are analyzed for normal, abnormal, and emergency response operating procedures. Tasks based on use of operating procedures are analyzed in greater detail in later iterations as the plant design progresses. Personnel performing the analyses include former operators of commercial U.S. nuclear power plants and other SMEs. Procedures are not available for initial TA; therefore, the tasks analyzed may be based on procedures from similar systems and processes.

© Copyright 2024 by NuScale Power, LLC 12 Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

3.3.2 Surveillance, Test, Inspection, and Maintenance Procedure Tasks

Tasks related to surveillance, test, inspection, and maintenance procedures in the main control room performed by the control room staff are screened for applicability. Human errors during the performance of surveillance, test, inspection, and maintenance procedures may result in components being in a state that induces a plant transient or triggers a precursor to a plant transient. In both cases, the surveillance, test, inspection, and maintenance actions are selected for task analysis to identify defenses against these errors. The process is iterative in nature and is kept current over the plant's life cycle, from design development through decommissioning.

Safety-related surveillance, test, inspection, and maintenance tasks are identified. The SME reviews the design material available, including system design packages, piping and instrument diagrams, logic diagrams, and electrical schematics for each system the task involves, and determines the tasks necessary to perform the surveillance, test, inspection, and maintenance functions of the system. Surveillance, test, inspection, and maintenance activities identified through SME judgment as having challenged operating crews at commercial U.S. operating nuclear plants, or which potentially impact the ability of a NuScale Power Plant operating crew to manage up to six units in one control room, are selected for TA.

The SME documents the safety-related surveillance, test, inspection, and maintenance activities for each system using the technical specifications as the basis. Systems are distributed among SMEs for this selection process.

3.3.3 Tasks with Potentially Negative Consequences (Not Identified as Important Human Actions)

Negative consequences are defined as any action, task, or condition that places personnel, equipment, or the plant in jeopardy. Examples include a condition requiring an unplanned down power. a condition requiring a reactor trip or initiation of emergency equipment. an emergency action level declaration. a condition that places the plant in an unplanned technical specification action statement entry that requires plant shutdown.

When selecting human actions that are not identified as IHAs but have potentially negative consequences (such as precursors to plant transients), SMEs review the OER, the PRA, and use their own experience. Activities related to transients or PRA that according to SME judgment were caused by challenges to operating crews at commercial U.S. operating nuclear plants or which potentially impact the ability of a NuScale Power Plant operating crew to manage multiple units in one control room are selected for TA. The SME documents the basis for selecting these activities for TA. These tasks that have potentially negative consequences are considered; abnormal, emergency and annunciator response tasks and are covered in these procedures.

© Copyright 2024 by NuScale Power, LLC 13 Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

3.4 Operational Sequence Diagrams

An operational sequence diagram (OSD) is created for safety-related tasks and used to aid in evaluating the flow of information from the point where the operator first becomes involved with the system to the completion of the task. Information flow includes operator decisions, operator control activities, and the transmission of data. Operator actions are identified in a top-down sequential format. The objective is to show how the information flows between the operators and the HSI from the beginning to the end of the task. The sequencing of the tasks provides input for the plant operating procedures and defines the activities that plant personnel are trained to execute.

The functional allocation and task description provide the objective and operating parameters for operator tasks. In order to identify the stimulus and response relationship for each lowest level task, each task is decomposed by identifying the parent task, subtasks, and task elements.

Depending on their types and complexity, tasks may be performed sequentially, in parallel, or in any order. Tasks may also be conditional, may involve coordinated actions among crew members, or among crew members and local personnel.

Figure 3-2 is a simplified OSD example for the decay heat removal system (DHRS) showing how the task Actuate DHRS is decomposed into its tasks. The figure demonstrates the sequence and decision points the operator follows to verify DHRS is achieving the function of removing fuel bundle heat. The table at the bottom of the drawing identifies the tasks by number, which corresponds to the tasks in the drawing.

© Copyright 2024 by NuScale Power, LLC 14 Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

Figure 3-2 Operational Sequence Diagram Task Decomposition Example

Safety Function: DHRS Actuation Remove Fuel Assembly (Safety Related) Heat

Task 5b Task Functional Operate Individual Valves 3 Requirement:

  • Close MSIVsDHRS actuate No Task Task
  • Close Feedwater isolationssuccessfully? 11 Actuate DHRS 1 No
  • Open DHRS actuation valves Yes Transition to other methods of core cooling DHRS actuate Yes Task successfully? Task 5a 6 Task Manually Initiate Verify DHRS is achieving Stop DHRS 10 DHRS by placing the function Close DHRS Actuation Valves DHRS Actuation switches to ACTUATE

Task DHRS Task 4 achieving No Cool until DHRS 9 Recognize Auto purpose? termination initiation has criteria met failed Yes No Task Task Task No 7 8 2 Task Cooldown rate Yes Stop one loop 3 need reduced? of DHRS Automatically DHRS actuate Yes Initiated successfully? Tasks Identified from function decomposition (1) Recognize DHRS actuation is needed (6) Verify DHRS is achieving function (2) Recognize DHRS has automatically initiated (7) Evaluate cooldown rate (3) Determine if DHRS successfully actuated (8) Stop one loop of DHRS cooling (4) Recognize DHRS failed to automatically initiate (9) Determine when DHRS should be terminated (5) Manually initiate DHRS (10) Stop DHRS operations (5a) Manually initiate DHRS (Actuation switches) (11) Determine the need to transition to other forms of core cooling (5b) Manually initiate DHRS with individual valve operation

3.5 Detailed Task Narratives

For tasks that are screened in for TA, a detailed task narrative is written. The purpose of the narrative is to provide a description of the objectives of a specific system's operator tasks. an overview of the activities personnel are expected to accomplish to complete the task. a description of alarms, information, controls, and task support needed to accomplish the task. a basic outline of the procedure steps.

Narrative descriptions of operator activities contain detail for an operator to correlate the described task to the results of the completed task analysis. The length of the narrative is

© Copyright 2024 by NuScale Power, LLC 15 Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

commensurate with the complexity of the task it describes. Each task narrative includes the following details: task title and identifier alarms and cautions associated with the task or that aid in the completion of the task parameters the operator must know or be able to locate during performance of the task and a means of knowing if actions taken to attain parameters are adequate (feedback) decisions the operator must make in performing the task (the type of decision and how the operator evaluates choices before reaching a decision) action(s) expected of the operator, accuracy requirements for the action(s), time available for the action(s), and ergonomic properties of the controls for completion of the action communication needs for the operator and associated teammates and alternative communication methods workload (the anticipated or measured cognitive and physical workload needed to complete the task) tools, equipment, protective clothing, job aids, or procedures needed for the task workspace needed to perform the task and environmental conditions applicable for the task situational considerations (ways that situations affect the outcome of the task such as time pressure, extreme environments, and team staffing shortages) hazards and the means for identification and mitigation of hazards for completion of the task

Task narratives are revised as relationships among tasks are better defined. The order and sequence of tasks selected for TA are crucial to understanding workload and communication needs.

3.5.1 Time Required for Performing Tasks

The time required to perform a task is a combination of cognitive processing time, physical movement time, and HSI response time (e.g., screen navigation, control operation, I&C platform processing, plant system response). Calculations of time required for task performance factor in decision making (which may or may not be part of cognitive processing depending on task complexity), communications with the operations team, task support requirements, situational and performance-shaping factors, and workplace factors and hazards for each step of a task.

The analysis of time required for IHAs is also based on a documented sequence of operator actions. The estimated time for operators to complete the credited action is sufficient to allow successful execution of applicable steps in the emergency operating procedure. Time estimates for individual task components (e.g., acknowledging an alarm, selecting a procedure, verifying that a valve is open, starting

© Copyright 2024 by NuScale Power, LLC 16 Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

a pump), and the basis for the estimates are established through a method applicable to the HSI characteristics of digital computer-based I&C.

The time available to perform the actions is based on analysis of the plant response to the anticipated operational occurrences, accidents, and infrequent and special events, in accordance with NUREG-0711 (Reference 4.1.1).

3.5.2 Personnel Required for Performing Tasks

The number of personnel required to perform each task is determined by the task narrative, complexity of the task, time required to perform the task, and the time available. The task narrative developed for basic TA includes such information as: job function(s) or title(s) of person(s) who performs the task requirements for communication with other Operations personnel while performing the task how different levels of staffing affect the performance of a task the task time estimate

Where detailed TA determines that workload for an individual task or analyzed sequence of tasks is excessive, an HFE issue is entered into the Human Factors Engineering issues tracking system database. Designers then have options such as re-allocation of functions, changes to operator roles and responsibilities, changes to the number of operators, and changes to the HSI design to address the issue.

3.5.3 Task Support Requirements

Task support requirements are defined during the early TA. However, if not known, a later TA iteration captures additional considerations, such as: written job aids reference material calculation sheets tools equipment protective clothing instrument range instrument units instrument resolution - typically 1 percent of the range, but the SME may specify if other instrument refresh or update rate - considering limitations of the I&C platform instrument display characteristics

© Copyright 2024 by NuScale Power, LLC 17 Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

instrument trend requirements calculation automation requirements

3.5.4 Task Considerations

Each task is evaluated to identify situational and performance-shaping factors that increase the cognitive workload and may influence human reliability. Examples include stress, reduced staffing, time pressure, and extreme environmental conditions. Table 3-1 shows how the HFE team compares the NUREG-0711 (Reference 4.1.1) with the NuScale attributes.

© Copyright 2024 by NuScale Power, LLC 18 Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

Table 3-1 Task Considerations Topic Examples (NUREG-0711) Task Attribute (NuScale) Alerts

  • alarms and warnings
  • alarms and warnings (alerts)

Information

  • parameters (units, precision, and
  • parameters (units, precision, and accuracy) accuracy)
  • feedback needed to indicate adequacy of
  • feedback needed to indicate adequacy of actions taken actions taken Decision-making
  • decision ty pe (relative, absolute,
  • decision type (relative, absolute, probabilistic) evaluations to be performed probabilistic) evaluations to be performed Response
  • actions to be taken* actions to be taken (element steps)
  • task frequency and required accuracy
  • task frequency and required accuracy
  • time available and temporal constraints
  • time available (IHAs); task time (non-IHA)

(task ordering)

  • time constraints
  • physical position (stand, sit, squat, etc.)
  • physical position (such as sit, stand)
  • biomechanics
  • biomechanics force required
  • movements (lift, push, turn, pull, crank,
  • biomechanics description (such as turn, etc.) pull)
  • forces needed Teamwork and
  • coordination needed between the team
  • coordination needed between the team Communication performing the work performing the work
  • personnel communication for monitoring
  • communication with other groups information or taking control actions
  • communication reporting
  • external communication Workload
  • cognitive workload* cognitive workload
  • physical workload
  • physical workload
  • overlap of task requirements (serial vs.
  • overlap of task requirements (procedure parallel task elements) development)
  • task relationships and task type Task Support
  • special and protective clothing
  • special and personnel protective
  • job aids, procedur es or reference equipment materials needed
  • procedures
  • tools and equipment needed
  • job aids
  • job aid description
  • procedures
  • procedure description
  • reference material
  • reference material description
  • tools, materials, and equipment needed Workplace
  • ingress and egress paths to the worksite
  • ingress and egress paths to the worksite Factors
  • workspace needed to perform the task (work paths)
  • typical environmental conditions (such as
  • workspace needed to perform the task lighting, temp, noise)
  • typical environmental conditions (such as lighting, temp, noise)

Situational and *stress *stress Performance

  • time pressure
  • time pressure Shaping Factors
  • extreme environmental conditions
  • extreme environmental conditions
  • reduced staffing
  • staffing conditions Hazard
  • identification of hazards involved, e.g.,
  • hazards Identification potential personal injury

© Copyright 2024 by NuScale Power, LLC 19 Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

3.5.5 Inventory of Alarms, Controls, and Displays

Plant operations SMEs determine the HSI inventory by reviewing the detailed task analysis results for each task and identifying the alarms, controls, and displays required on the appropriate HSI to execute the task. The HSI inventory and characterization process is described in Human Factors Engineering Human-System Interface Design Implementation Plan (Reference 4.2.3).

For alarms and displays, the SME conducting TA for that task considers and documents the following: parameter - description and instrument number (if available) range units resolution - typically 1 percent of the range, but the SME may specify, if other refresh or update rate - considering limitations of the I&C platform display characteristics trend requirements calculation automation requirements alarms - criteria for and levels of alarms are established during HSI design; descriptions rather than setpoints are acceptable for earlier TA iterations

For controls, the SME conducting TA for that task considers and documents the following: equipment control requirements control function type and description indication of status alarm functionality - such as loss-of-power, mismatch between signal and position, thermal or high power overload, high vibration conditions when the controls will be interlocked, blocked, or overridden

Note that the TA subject matter expert uses qualitative language to define alarm and control setpoints (e.g., high, low), but actual setpoint determination is made by the plant designers.

3.5.6 Knowledge and Abilities Identification

NUREG-0711, Item 5.4 Review Criteria, item (7) states: The applicant should identify the knowledge and abilities required to perform each task.

An initial task analysis for the US600 Design Certification Application (DCA) is documented in a results summary report. A stated goal of the DCA task analysis was

© Copyright 2024 by NuScale Power, LLC 20 Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

to determine the knowledge and abilities (KA) needed for success of the task, and then to benchmark that list of KA against a modern pressurized water reactor using NUREG-2103 (Reference 4.2.5), so that a NuScale-specific KA catalog could be developed to address the unique characteristics of the NuScale Power Plant design.

During development of the NuScale-specific KA catalog, a novel approach was developed that simplifies and reduces the effort associated with developing the KA catalog. For this catalog, the systems approach to training program identifies learning objectives, which are considered the knowledge, skills, and abilities (KSAs). The learning objectives, or KSAs, are then categorized and ranked in a process similar to the Difficulty-Importance-Frequency methodology used to identify the reactor operator and senior reactor operator task lists. This methodology establishes a direct linkage between the tasks operators are required to perform and the operator licensing examination. The formal review of this approach by the staff has been requested using NuScales submittal of operator licensing and examination standards (Reference 4.2.6) and NuScales request for staff review of the learning objective based KSA catalog (Reference 4.2.7). Use of this alternate approach separates the development of HFE task analysis from the Learning Objective based catalog, and negates the need to perform the gap analysis recommended by NUREG-2103.

3.6 Iterative Nature of Task Analysis

The HFE Program itself is iterative in that elements of the program provide inputs to other elements and some design issues are only resolved by changing assumptions or re-analyzing based on new data. For example, applicable human engineering discrepancies initiated during OER and FRA/FA are resolved in TA, while TA output includes: early definition of roles and responsibilities for individuals that are analyzed in S&Q for an overall Operations team view. a list of HSI inventory and characteristics for HSI design. information and controls needed for task support that are used for procedure development. determination of required KA, which leads to learning objectives for training program development.

When problems arise during HFE Program activities after TA, human engineering discrepancies are initiated; resolution of those human engineering discrepancies may result in changes to or re-work of the TA.

In addition, since TA is conducted for some plant systems before other system designs have commenced, system and component design changes may result in changes to systems previously designed. In these cases, TA input assumptions are likely to change. Task analysis SMEs revise the TA as details of the plant, system, or component designs emerge.

© Copyright 2024 by NuScale Power, LLC 21 Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

3.6.1 Functional Requirements Analysis and Function Allocation and Task Analysis Database

The VISION developer application is a relational database that is used to store the FRA/FA, TA, and staffing and qualifications data. In this document it is also referred to as the FRA/FA & TA database, or database. The TA results of NuScale systems are available in the database.

Example screenshots from the database are provided below. The letters and icons in the hierarchy used in the database are described in Table 3-2. Database hierarchy is arranged in such a way to lay a foundation for training, task analysis, staffing and qualifications, and HSI. The image inset in the database screenshot is an illustration of the cross-reference table, where the data are stored for each item in the hierarchy. The cross-reference tables allow for retrieval of the data in many different forms and allows for the data to be changed in one location and used for different outputs.

Table 3-2 VISION Icon Descriptions Icon Icon Title Description Organizer Top level of a Project

Responsibility Area The NuScale system

Function Introduction & FRA/FA Design categories (FRA/FA)Designates a system level function (Task Analysis)

Phase Aspects of the FRA/FA

Task A well-defined unit of work having an ident ifiable beginning and end, which is a measurable component of a specific job (Task Analysis)

Element Steps in the procedure (Task Analysis)

Job Position A way to determine the roles and responsibilities of a task (Task Analysis)

Skills & Knowledge Describes knowledges and abilities required to perform a task

3.6.2 New Task Criteria

New tasks are developed if they are identified as tasks for new systems compared to existing nuclear plants or tasks that, while not new, are performed significantly differently from existing plants. NuScale uses the following criteria for determining if a task should be considered new. The system is unique or modified significantly for NuScale or not commonly used in the commercial industry. Any component or feature that is unique or modified significantly to NuScale or not commonly used in the commercial industry.

© Copyright 2024 by NuScale Power, LLC 22 Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

Any component or feature that has a high reliance on automation.

Tasks that are considered new to NuScale are linked to the New Task table in VISION.

3.7 Analysis of Feasibility and Reliability for Important Human Actions

The feasibility and reliability analysis for IHAs addresses the following: time available and time required to perform actions use of techniques to minimize bias sequence of actions estimated time for operators to complete credited actions

Time available to perform actions is the length of time from the initiation of the task to the time the task needs to be completed as defined in the analysis, which identifies the IHA (e.g., PRA, D3CA, and transient and accident analysis). Applicable regulatory guidance is considered for the analyses that determine each IHA, and for a task that industry experience identifies as a potential IHA. The time available is based on plant response to the anticipated operational occurrence or accident.

As discussed in Section 3.5.1, the time required to complete a task considers cognitive processing time, physical movement time, and HSI response time. The time-required calculation is based on an understanding of the sequence of operator actions and takes into account secondary tasks. Time-required estimates for IHAs are simulated and measured when feasible, or obtained through operator and expert interviews, software modeling of human behavior during tasks, and OERs. The NuScale Power Plant US460 standard design does not include IHAs. The Treatment of Important Human Actions Results Summary Report contains more information (Reference 4.2.4).

© Copyright 2024 by NuScale Power, LLC 23 Human Factors Engineering Task Analysis Implementation Plan

TR-130413-NP Revision 1

4.0 References

4.1 Source Documents

4.1.1. U.S. Nuclear Regulatory Commission, Human Factors Engineering Program Review Model, NUREG-0711, Rev. 3, 2012.

4.2 Referenced Documents

4.2.1. Human Factors Engineering Program Management Plan, TR-130414, Revision 0.

4.2.2. Human Factors Engineering Functional Requirements Analysis and Function Allocation Implementation Plan, TR-124333, Revision 0.

4.2.3. Human Factors Engineering Human-System Interface Design Implementation Plan, TR-130417, Revision 0.

4.2.4. Human Factors Engineering Treatment of Important Human Actions Results Summary Report, TR-130416, Revision 0.

4.2.5. U.S. Nuclear Regulatory Commission, Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Westinghouse AP1000 Pressurized Water Reactors - Final Report, NUREG-2103

4.2.6. Submittal of Draft Operator Licensing and Examination Standard for NuScale Small Modular Reactors (ML20195A587)

4.2.7. NuScale Requests NRC Review of the NuScale Operator Exam Methodology and Learning Objective Based Knowledge, Skills, and Abilities Catalog (ML22335A489)

© Copyright 2024 by NuScale Power, LLC 24 LO-158053

Affidavit of Carrie Fosaaen, AF-158055

NuScale Power, LLC 1100 NE Circle Blvd., Suite 200 Corvallis, Oregon 97330 Office 541.360.0500 Fax 541.207.3928 www.nuscalepower.com

NuScale Power, LLC

AFFIDAVIT of Carrie Fosaaen

I, Carrie Fosaaen, state as follows:

(1) I am the Vice President of Regulatory Affairs of NuScale Power, LLC (NuScale), and as such, I have been specifically delegated the function of reviewing the information described in this Affidavit that NuScale seeks to have withheld from public disclosure, and am authorized to apply for its withholding on behalf of NuScale

(2) I am knowledgeable of the criteria and procedures used by NuScale in designating information as a trade secret, privileged, or as confidential commercial or financial information. This request to withhold information from public disclosure is driven by one or more of the following:

(a) The information requested to be withheld reveals distinguishing aspects of a process (or component, structure, tool, method, etc.) whose use by NuScale competitors, without a license from NuScale, would constitute a competitive economic disadvantage to NuScale. (b) The information requested to be withheld consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), and the application of the data secures a competitive economic advantage, as described more fully in paragraph 3 of this Affidavit. (c) Use by a competitor of the information requested to be withheld would reduce the competitors expenditure of resources, or improve its competitive position, in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. (d) The information requested to be withheld reveals cost or price information, production capabilities, budget levels, or commercial strategies of NuScale. (e) The information requested to be withheld consists of patentable ideas.

(3) Public disclosure of the information sought to be withheld is likely to cause substantial harm to NuScales competitive position and foreclose or reduce the availability of profit-making opportunities. The accompanying report reveals distinguishing aspects about the process by which NuScale performs its Human Factors Engineering Task Analysis.

NuScale has performed significant research and evaluation to develop a basis for this process and has invested significant resources, including the expenditure of a considerable sum of money.

The precise financial value of the information is difficult to quantify, but it is a key element of the design basis for a NuScale plant and, therefore, has substantial value to NuScale.

If the information were disclosed to the public, NuScale's competitors would have access to the information without purchasing the right to use it or having been required to undertake a similar expenditure of resources. Such disclosure would constitute a misappropriation of NuScale's intellectual property, and would deprive NuScale of the opportunity to exercise its competitive advantage to seek an adequate return on its investment.

(4) The information sought to be withheld is in the enclosed report entitled Human Factors Engineering Task Analysis Implementation Plan, TR-130413-P, Revision 1. The enclosure contains the designation Proprietary at the top of each page containing proprietary information. The information considered by NuScale to be proprietary is identified within double braces, (( }} in the document.

(5) The basis for proposing that the information be withheld is that NuScale treats the information as a trade secret, privileged, or as confidential commercial or financial information. NuScale relies upon AF-158055 Page 1 of 2  the exemption from disclosure set forth in the Freedom of Information Act (FOIA), 5 USC § 552(b)(4), as well as exemptions applicable to the NRC under 10 CFR §§ 2.390(a)(4) and 9.17(a)(4).

(6) Pursuant to the provisions set forth in 10 CFR § 2.390(b)(4), the following is provided for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld:

(a) The information sought to be withheld is owned and has been held in confidence by NuScale.

(b) The information is of a sort customarily held in confidence by NuScale and, to the best of my knowledge and belief, consistently has been held in confidence by NuScale. The procedure for approval of external release of such information typically requires review by the staff manager, project manager, chief technology officer or other equivalent authority, or the manager of the cognizant marketing function (or his delegate), for technical content, competitive effect, and determination of the accuracy of the proprietary designation. Disclosures outside NuScale are limited to regulatory bodies, customers and potential customers and their agents, suppliers, licensees, and others with a legitimate need for the information, and then only in accordance with appropriate regulatory provisions or contractual agreements to maintain confidentiality.

(c) The information is being transmitted to and received by the NRC in confidence.

(d) No public disclosure of the information has been made, and it is not available in public sources. All disclosures to third parties, including any required transmittals to NRC, have been made, or must be made, pursuant to regulatory provisions or contractual agreements that provide for maintenance of the information in confidence.

(e) Public disclosure of the information is likely to cause substantial harm to the competitive position of NuScale, taking into account the value of the information to NuScale, the amount of effort and money expended by NuScale in developing the information, and the difficulty others would have in acquiring or duplicating the information. The information sought to be withheld is part of NuScale's technology that provides NuScale with a competitive advantage over other firms in the industry. NuScale has invested significant human and financial capital in developing this technology and NuScale believes it would be difficult for others to duplicate the technology without access to the information sought to be withheld.

I declare under penalty of perjury that the foregoing is true and correct. Executed on March 2 y that the foregoing is trtrtrtrtrtrrrrrueueueueueueueueueee and co, 2024.

Carrie Fosaaen CarrieFosaaen

AF-158055 Page 2 of 2}}