ML24030A760
ML24030A760 | |
Person / Time | |
---|---|
Issue date: | 12/31/2024 |
From: | NRC/OCFO |
To: | |
References | |
Download: ML24030A760 (93) | |
Text
FY 20 24 PROPOSED FEE RULE WORK PAPERS FY 2024 Pr opos e d Fe e R ule W or k Papers
The sup porti ng info rmatio n to t he FY 2024 P ro posed Fee Rule is cont ained i n the f ollowing wo rk papers. The items id entified in the Table of Cont ents a re locat ed be hind a corr espon ding Tab.
A t the begin ning of each Tab is a cross refe rence, if app rop riate, t o the l ocation of the subject matter and Tables found within th e P ropos ed F ee Rule Doc umen t. Fo r exa mple, a ref erenc e to S ectio n II. is the s uppo rting inf orm ation f or: Sec tio n II. FY 202 X Fe e Collection A.
A mendme nts to 1 0 CFR P art 170 1. P rofessi onal Hou rly Rate.
The complete outline of the FY 202 4 P ropos ed Fee Rule s howing t he S ection and Table titles is located im mediat ely following t he T able of Conten ts.
Table of C on ten ts
FY 202 4 P r oposed Fee Rule Outlin e
B udget an d Fe e Recove ry
10 CFR P art 170 Fees Determination of Professional Hourly Rate Service Fees Export and I mport F ees Reciprocity F ees--Agreement S tate Licensees General License Registration Fees
Fee Collect ed fo r P rior Y ea r
10 CFR Part 171 A nn ual Fe es Application of LLW Surcharge Operating Power Reactors Spent F uel S torage/Reactor Decommissioning Fuel Facilities Uranium R ecovery Facilities Non-Power P roduction or Utilization Facilities Rare Earth Facilities Materials U sers Transportation Regulatory Flexibility A nalysis B udget A utho rity ( FY 2024 )
FY 2024 B ud get S um mary by P rogr am FY 2024 P r op ose d F ee Rul e Ou tline
I. Obtaini ng Inf orm ation a nd S ubmit ting Com ments
II. B ackgro und; S ta tutory A uthority
III. Discussion
Fe e Collection - Ove rview
- i. Table IE xclud ed Activities
ii. Table IIB u dget a nd F ee Recov ery A mo unts
F ee Collectio n - P ro fessional Ho urly Rat e
iii. Table IIIP r ofession al Hourly Ra te Calculati on
F ee Collectio n - Flat A pplicatio n Fe e Chan ges
F ee Collectio n - L ow-Lev el Waste ( LLW) S urc harg e
iv. Table IVA llocation of LLW S urc har ge, FY 2024
F ee Collectio n - Revise d A nnual Fees
- v. Table VRebas elined Ann ual F ees
- b. Ope rating P owe r React ors
vi. Table V IA nnu al Fee S umma ry Calculatio ns for Oper ating P owe r Reacto rs
- b. S pent Fu el S torag e/Reacto r Deco mmissioning
- i. Table V IIA nnu al Fe e S umma ry Calculati ons fo r the S pe nt F uel
S torage/Re actor in Decom missioning Fee Class
- c. Fuel Facilities
- i. Table V IIIA nn ual Fe e S umm ary Calcula tions fo r Fu el Facilities
ii. Table IXE ffor t Fact ors fo r F uel Facilities, FY 202 4
iii. Table XAnnual Fees for Fuel Facilities
- d. Uranium Rec overy Facilities
- i. Table XIA nnu al Fee S umma ry Calculatio ns for Uraniu m Recove ry
Facilities
ii. Table XIICosts R ecover ed T hrou gh A nnu al Fees ; Urani um Recov ery F ee
Class
iii. Table XIIIB en efit Fac tors f or Ura nium Rec overy Licenses
iv. Table XIVA nnual Fees f or Ura nium Rec overy Licensees (oth er th an DOE )
- e. Non-P ower Pro duction or Utilization Facilities (NPUF)
- i. Table XVA nnual Fee S um mary Calc ulations f or NPUF
- f. Rare E arth
- g. Materials Use rs
- i. Table XVIA nnual Fee S um mary C alculations for Materi als Users
- h. Transp ortati on
- i. Table XVIIA nnual Fee S u mmary Calculations for Tra nsport ation
ii. Table XVIIIDistribu tion of Gene ric Tr anspo rtation Resourc es, FY 2024
- i. Fee P olicy Chan ges
- j. A dministrative Ch anges
IV. Regulat ory Flexibility Certificati on
V. Regulat ory A nalysis
VI. B ackfitting a nd Issu e Finality
VII. Plain Writing
VIII. National E nviro nment al P olicy A ct
I X. P aperwo rk Reduc tion A ct P ublic P rot ection Notifica tion
X. V olunta ry Consens us S tand ards
XI. A vailability of Gui dance
XII. P ublic Mee ting
XIII. A vailability of Docu ments Budget a nd Fee Recovery
Section III
Table I Table II
The NRC is issu ing this F Y 2024 proposed fee r ule based on the FY 2024 budget request as further described in the NRCs F Y 2024 Congressional B udget Justification ( CBJ) (NUREG-1100, Volume 39) beca use a full-year app ropriation has not y et be en enacted for FY 2024. The pr oposed fee rule reflects a total budg et au thority i n the amount of $1006.3 million, an increase of $79.1 million f rom F Y 2023. The FY 2024 budget request proposes t he use of $27. 1 million in carryover to offset the Nuclear R eactor S afety bud get, r esulting in a gross budget authority of $ 979.2 million, which is an increase of $52.1 million f rom FY 2023. As exp lained in the proposed fee rule, c ertain portions of t he N RCs t otal bu dget authority for t he fiscal ye ar are excluded from N EIMAs f ee-recovery requirement un der S ection 102(b)(1)(B) of N EIMA. B ased on the FY 2024 CBJ, t hese exclusions t otal $156.0 m illion, c onsisting of $104.2 million for f ee-relief a ctivities; $34.2 million f or advanced r eactor r egulatory i nfrastructure act ivities; $15.1 million for gene ric ho meland se curity activities; $1.0 million for w aste incidental to reprocessing activities; and $1.5 million for I nspector General s ervices f or t he Defense Nuclear Facilities S afety B oard.
Based on the 100 percent f ee-recovery requirement, the NRC w ill have to recover ap proximately
$823.2 million in FY 2024 through 10 CF R Part 170 licensing and inspection fees and 10 CFR Part 171 annual f ees. The amount required by l aw t o be recovered t hrough fees f or FY 2024 would be
$35.1 million more t han the amount estimated for recovery in FY 2023, an increase of 4.4 percent.
The FY 2024 fee recovery amount is increased by $2.5 million to account for billing adjustments (i.e., for F Y 2024 invoices t hat t he NRC es timates w ill not be paid during the fiscal year, less payments received in FY 2024 for p rior ye ar i nvoices). This l eaves app roximately $825.7 million t o be billed as fees i n FY 2024 through 10 CFR P art 170 l icensing and inspection fees an d 10 CFR Part 171 annual f ees.
The NRC est imates t hat $205.5 million would be recovered from 10 CF R Part 170 fees i n FY 2024.
This represents an increase of $10.5 million or approximately 5.4 percent as compared to the estimated 10 CFR P art 17 0 collections of $19 5.0 million f or F Y 2 023. The remaining $620.2 million would be recovered through the 10 CFR P art 17 1 annual f ees i n FY 2024, wh ich is an increase of
$24.6 million wh en compared to estimated 10 CF R Part 171 collections o f $595.6 million for FY 2023.
See Tab Budget A uthority (FY 2024) for supplemental information on the di stribution of budgeted FTE and contract dollars.
Budget and Fee Recovery FY 2024
($ in Millions)
(Individual dollar amounts may not add to totals due to rounding)
FY 2024 Total Budget Authority $979.2
Less Budget Authority for Excluded Activities -$156.0
Balance $823.2
Fee Recovery Rate for FY 2024 x 100
Total Amount to be Recovered For FY 2024 $823.2
Estimated Amount to be Recovered through 10 CFR Part 170 Fees -$205.5
Estimated Amount to be Recovered through 10 CFR Part 171 Fees $617.7
10 CFR Part 171 Billing Adjustments $2.5
Adjusted 10 CFR Part 171 Annual Fee Collections Required $620.2
02/06/2024 Congressional Budget Justification FY 2024
($ in Thousands)
Enacted Budget
Total Budget Authority for Salaries & Expenses and Office of the Inspector General:
Budget Authority $979,209 Less: Revenue from services and collections to be Recovered $823,209 Net Budget Appropriation $156,000
Excluded from Budget Authority Activities:
Generic Homeland Security $15,058 Advanced Reactors Regulatory Infrastructure $34,204 W aste Incedential to Reprocessing $1,016 Nuclear W aste Fund $0 Defense Nuclear Facilities Safety Board $1,535
- Fee Relief Activities Fully Costed $104,187
Net Budget Appropriation $156,000
- Fee Relief Activities
International Activities $37,525 Agreement States Oversight $12,755 Medical Isotope Production Infrastructure $723 Costs not recovered from Small Entities $10,419 Regulatory Support to Agreement States $12,099 Fee Exemption for Non Profit Educational Institutions $19,008 Generic Decommissioning/ Reclamation $2,780 Uranium Recovery Program & Unregistered General Licensees $7,902 Potential Department of Defense remediation program $783 Non-Military Radium Sites $193
Fee Relief Activities @ fully costed rate $104,187 10 CFR Part 170 Fees
Section III.A 10 CFR Part 170 Fees
Determination of Professional Hourly Rate
Section III.A.1
Table III
Final Professional Ho u rly Ra te is $321
The NRCs pro fessional hourly rate is derive d by a dding budge ted r esourc es fo r (1 ) mission-direct progr am sala ries an d ben efits; ( 2) missio n indir ect-p rogr am sup port; and (3) agency s uppo rt (corpo rate s uppo rt an d the I nspect or Ge neral (IG), then s ubtr acting ce rtain offsettin g recei pts an d then dividin g this tot al by missio n direc t full-tim e equiv alents ( FTE ) c onve rted t o hou rs. T he only budget ed res ources exclude d fro m the prof essional hourly rate are t hose f or missio n-dir ect contract activities.
The NRC has reviewed and analyzed actual ti me an d labo r dat a in th e NRCs Human C apital Manag ement Cloud S ystem for t he m ost rec ent co mplete d fiscal yea r ( FY 2023 ) to d eter mine if t he annual di rect h ours wo rked p er di rect FTE estim ate r equires upd ating fo r the FY 20 24 fee rule.
B ased on this review usin g actu al time and lab or d ata, t he NRC dete rmine d tha t 1,500 ho urs is th e best estima te of direct hours w orked annu ally per direct FTE. This estim ate exclu des all n on-di rect activities, such as annu al leave, sick leave, holidays, t raining, and gene ral ad ministra tion tasks.
Definitions of Professional Hourly Rate Components
Mission-Di rect Pro g ram Sal ari es an d Ben efi ts:
These resources are allocated to perform core work activities committed to fulfillin g the agencys mission of prot ect ing public health and safety, promoting the common defense and security, and prot ect ing the environment. These resources include the maj ority of the resources assigned under the direct business lines (Operating Reactors, New Reactors, Fuel Facilit ies, Nucle ar M at er ials Users, Decommissioning and Low-Leve l Waste, and Spent fuel Storage and Transportation) are core work activities considered mission-direct.
Mission-I nd i rect Program Support :
These resources support the core mission-dir ect act ivit ies. These resources include f or example, supervisory and n onsupervisory support, and mission travel and training. S upervisory and nonsupervisory support, and mission travel and training resources assigned under direct business line st ruct ure, are considered mission-indirect due to their supporting role of the core mission act ivit ies.
Agency Support (Corporate Support and the IG) :
These resources are located in executive, administrative, and other support offices such as the Office of the Commission, the Office of the Secretary, the Office of the Executive Director for Operations, the Offices of Congressional and Pub lic Affairs, the Office of the Inspector General, the Office of Administration, the Office of the Chief Financial Officer, the Office of the Chief Information Officer, the Office of the Chief Human Capital Officer and the Office of Small Business and Civi l Rights. These r esources administer the corporate or shared efforts that more broadly support the act ivit ies of the agency. These resources also include information technology services, human capital services, financial management and administrative support.
O ffsetti n g Recei p ts:
The fees collected by the NRC for the Freedom of Information Act (FOIA) and Indemnity (financial protection required of licensees for public liab il ity claims of 10 CFR Part 140) are subtracted from the budgeted resources amount when calculating the 10 CFR Par t 170 prof essional hourly rate per the guidance in OMB Circular A-25 User Charges. The budgeted resources for FOIA activities are allocated under the product for information services within the Corporate Support business line. The indemnity activities are allocated under the licensing actions and the Research and Test Reactors products within the Operating Reactors business line.
Estimated Annual Mission Direct FTE Productive hours :
Also referred to as the productive hours estimation, reflects the average number of hours that a mission-direct employee spends on mission-d irect w ork in a given year. This excludes hours charged to annual leave, sick leave, holidays, training and general administration tasks. The productive hours is calculated using actual time and labor data in HCM Clo ud (minus support and supervisory staff).
Total hours in mission business lines Total hours in mission business lines X Total work hours in ayear (2,087) = Productive Hours
+ Other Hours
2,007,966 X Total work hours in a 2,797,041 year (2,087) = 1,500
Elements of the formula are defined as follows:
- M i ssi on Busi ne ss Li ne s. The Operating Reactors, New Reactors, Nuclear Materials Users, Fuel Facilities, Spent Fuel Storage and Transportation, and Decommissioning and Low-level W a st e Busi ne ss Li ne s.
- H our s i n M i ssi on Busi ne ss Li ne s. Hour s charged to cost accountability codes for mission-direct work.
- Other Hours. Includes hours charged to annual leave, sick leave, holidays, etc., and hours charged to cost accountability codes for training and general admini st ra ti ve ta sks.
- Hours in a Work Year. 2,087 hours0.00101 days <br />0.0242 hours <br />1.438492e-4 weeks <br />3.31035e-5 months <br /> is used to be consistent with OPM guidance on computing hourly rates of pay and the Consolidated Omnibus Budget Reconciliation Act of 1985 (Public Law 99-272, April 7, 1986).
Page 1 of 2 DETERMINATION OF PROFESSIONAL HOURLY RATE CALCULATION OF FTE RATES BY PROGRAM
This is for the purpose of converting FTE to $. (1) (2) (2)/(1)
Total Total FTE PROGRAM FTE S&B ($): Rate ($)
NUCLEAR REACTOR SAFETY (Less Excluded Activities) 392,8881,723 228,091 Excluded Activities 85 20,917 247,240 NUCLEAR MATERIAL SAFETY (Less Excluded Activities) 461 229,067105,577 Excluded Activities 20 4,629 231,460 CORPORATE SUPPORT 588 131,577 223,771 Excluded Activities - - -
INSPECTOR GENERAL (Less Excluded Activities) 68 216,58114,728 TOTAL 2,944 670,315
MISSION DIRECT RESOURCES
(in actual $) nonlabor labor NUCLEAR REACTOR SAFETY $61,673,000 $308,949,930 NUCLEAR MATERIALS AND W ASTE SAFETY $29,659,300 $85,877,316 CORPORATE SUPPORT $2,000,000 $223,771 TOTAL $93,332,300 $395,051,016
PROGRAM SUPPORT (or MISSION INDIRECT) RESOURCES
(in actual $) nonlabor labor NUCLEAR REACTOR SAFETY (BUDGET PROGRAM) $13,293,500 $83,937,670 NUCLEAR MATERIALS AND W ASTE SAFETY (BUDGET PROGRAM) $3,224,000 $19,699,784 TOTAL $16,517,500 $103,637,454
AGENCY SUPPORT (CORPORATE SUPPORT & IG) RESOURCES
(in actual $) nonlabor labor TOTAL $172,777,000 $146,080,949
TOTALS Total ($)
Direct Labor $395,051,016 Direct Nonlabor (excl. from hourly rates) $93,332,300 Indirect Program Support Labor $103,637,454 Indirect Program Support Nonlabor $16,517,500 Agency Support: Corporate & OIG Labor $146,080,949 Agency Support: Corporate & OIG NonLabor $172,777,000 TOTAL $927,396,220
01/22/2024 Page 2 of 2 DETERMINATION OF PROFESSIONAL HOURLY RATE CONTINUED
Total included in professional hourly rates: % total value Mission-Direct Program Salaries & Benefits 47.36% $395,051,016 Mission-Indirect Program Support 14.41% $120,154,954 Agency Support: Corporate Support w/ Inspector General 38.23% $318,857,949 Total 100.00% $834,063,920 less offsetting receipts* $3,984 Total in professional hourly rate** $834,059,936
Mission-Direct FTE 1,730
FTE rate-Full Costed** ('Total' line divided by 'Mission Direct FTE') $482,006 Annual Mission-direct FTE productive hours 1,500 Mission-direct FTE converted to hours ('Mission Direct FTE' multiplied by
'Annual Mission direct FTE productive hours') 2,595,600 Professional Hourly rate** ('Total in professional hourly rates' divided by 'FTE converted to hours') $321
- Calculation of offsetting receipts Total
% value FOIA $3,984 100% $3,984
INDEMNITY $0 100% $0
TOTAL $3,984
- Since offsetting receipts can not be used to offset total fee collections, offsetting receipts are not subtracted from numerator for FTE rate. Per fee policy documents, we can subtract these receipts when calculating professional hourly rates.
01/22/2024 Mission Program Indirect Budgeted Resources for Professional Hourly Rate Calculation
FY24 FY23 Difference Contract ($,K) FTE Contract ($,K) FTE Contract ($,K) FTE
PROGRAM: NUCLEAR REACTOR SAFETY BUSINESS LINE: NEW REACTORS Travel
,QWHUQDWLRQDO$FWLYLWLHV7UDYHO
0LVVLRQ7UDYHO
Support Staff
6XSHUYLVRU\\6WDII
$GPLQ$VVLVWDQWV
1RQ 6XSHUYLVRU\\6WDII
PROGRAM: NUCLEAR REACTOR SAFETY BUSINESS LINE: OPERATING REACTORS Travel
,QWHUQDWLRQDO$FWLYLWLHV7UDYHO
0LVVLRQ7UDYHO
Support Staff
6XSHUYLVRU\\6WDII
5HFUXLWPHQW 6WDIILQJ
$GPLQ$VVLVWDQWV
1RQ 6XSHUYLVRU\\6WDII
Grand Total Nuclear Reactor Safety 13,294 368 16,403 371.0 (3110) (3.0)
PROGRAM: NUCLEAR MATERIALS AND WASTE SAFETY BUSINESS LINE: FUEL FACILITIES Travel
,QWHUQDWLRQDO$FWLYLWLHV7UDYHO
0LVVLRQ7UDYHO
Support Staff
6XSHUYLVRU\\6WDII
$GPLQ$VVLVWDQWV
1RQ 6XSHUYLVRU\\6WDII
PROGRAM: NUCLEAR MATERIALS AND WASTE SAFETY BUSINESS LINE: NUCLEAR MATERIALS USERS Travel
,QWHUQDWLRQDO$FWLYLWLHV7UDYHO
,QWHUQDWLRQDO$VVLVWDQFH7UDYHO
0LVVLRQ7UDYHO
Support Staff
6XSHUYLVRU\\6WDII
$GPLQ$VVLVWDQWV
1RQ 6XSHUYLVRU\\6WDII
PROGRAM: NUCLEAR MATERIALS AND WASTE SAFETY BUSINESS LINE: DECOMMISSIONING AND LOW LEVEL WASTE Travel
0LVVLRQ7UDYHO
,QWHUQDWLRQDO$FWLYLWLHV7UDYHO
Support Staff
6XSHUYLVRU\\6WDII
$GPLQ$VVLVWDQWV
1RQ 6XSHUYLVRU\\6WDII
PROGRAM: NUCLEAR MATERIALS AND WASTE SAFETY BUSINESS LINE: SPENT FUEL STORAGE AND TRANSPORTATION Oversight Travel Mission Travel 356 0.0 470 0.0 (114) 0.0 International Activities Travel 120 0.0 120 0.0 0 0.0 Mission Program Indirect Budgeted Resources for Professional Hourly Rate Calculation
FY24 FY23 Difference Contract ($,K) FTE Contract ($,K) FTE Contract ($,K) FTE Support Staff
6XSHUYLVRU\\6WDII
$GPLQ$VVLVWDQWV
1RQ 6XSHUYLVRU\\6WDII
Grand Total Nuclear Materials & Waste Safety 3,224 86 4,201 86 (977) 0.0
Total Mission Program Indirect Resources $16,518 454.0 20,604 457.0 (4,087) (3.0)
Total value of Mission Program Indirect Resources (FY 24 contract funding + 454 FTE multiplied by S&B rates) $16,518 $ 20,604103,637$ 98,152$ (4,087)$ 5,485$
Agency Support (Corporate Support and the IG): Budgeted Resources for Professional Hourly Rate Calculation
)< )< 'LIIHUHQFH Contract ($,K) FTE Contract ($,K) FTE Contract ($,K) FTE CORPORATE SUPPORT BUSINESS LINE: CORPORATE SUPPORT Acquisitions
0LVVLRQ,7
3URFXUHPHQW2SHUDWLRQV
$GPLQLVWUDWLYH$VVLVWDQWV
6XSHUYLVRU\\6WDII
7UDYHO
Administrative Services
0LVVLRQ,7
0LVVLRQ,7,QIUDVWUXFWXUH
6XSHUYLVRU\\6WDII
6XSSRUW6HUYLFHV
$GPLQLVWUDWLYH$VVLVWDQWV
,7,QIUDVWUXFWXUH
)DFLOLW\\0DQDJHPHQW
1RQ 6XSHUYLVRU\\6WDII
3K\\VLFDO 3HUVRQQHO6HFXULW\\
&RUSRUDWH7UDYHO
5HQW 8WLOLWLHV
Financial Management
0LVVLRQ,7
&RUSRUDWH5XOHPDNLQJ
6XSHUYLVRU\\6WDII
%XGJHWLQJ
$GPLQLVWUDWLYH$VVLVWDQWV
1RQ 6XSHUYLVRU\\6WDII
&RUSRUDWH7UDYHO
)LQDQFLDO6HUYLFHV
0DQDJHPHQWFRQWUROV
Human Resource Management
0LVVLRQ,7
6XSHUYLVRU\\6WDII
1RQ 6XSHUYLVRU\\6WDII
$GPLQLVWUDWLYH$VVLVWDQWV
&RUSRUDWH7UDYHO
(PSOR\\HH /DERU5HODWLRQV
3ROLF\\'HYHORSPHQW 6: 3
5HFUXLWPHQW 6WDIILQJ
&KDQJHRI6WDWLRQ
- RUN/LIH6HUYLFHV
Information Technology
,07HFKQRORJLHV
,7,QIUDVWUXFWXUH
,76HFXULW\\
,QIRUPDWLRQ6HUYLFHV
,QIRUPDWLRQ6HFXULW\\
6XSHUYLVRU\\6WDII
1RQ 6XSHUYLVRU\\6WDII
&RUSRUDWH7UDYHO
$GPLQLVWUDWLYH$VVLVWDQWV
&RQWHQW0DQDJHPHQW
,76WUDWHJLF0DQDJHPHQW
Outreach
6PDOO%XVLQHVV &LYLO5LJKWV
6XSHUYLVRU\\6WDII
$GPLQLVWUDWLYH$VVLVWDQWV
1RQ 6XSHUYLVRU\\6WDII
0LVVLRQ,7
&RUSRUDWH7UDYHO
Policy Support
0LVVLRQ,7
,QWHUQDWLRQDO3ROLF\\2XWUHDFK
,QWHUQDWLRQDO$FWLYLWLHV7UDYHO
Agency Support (Corporate Support and the IG): Budgeted Resources for Professional Hourly Rate Calculation
FY24 FY23 Difference Contract ($,K) FTE Contract ($,K) FTE Contract ($,K) FTE Performance Management 0 1.0 0 1.0 0 0.0 Commission 70 32.0 70 32.0 0 0.0 Commission Appellate Adjudication 5 5.0 5 5.0 0 0.0 EDO Operations 0 8.0 0 8.0 0 0.0 Policy Outreach 1,203 33.0 1,230 33.0 (27) 0.0 Secretariat 0 16.0 0 16.0 0 0.0 Official Representation 30 0.0 30 0.0 0 0.0 Corporate Rulemaking 0 0.5 0 0.5 0 0.0 Supervisory Staff 0 12.5 0 12.5 0 0.0 Administrative Assistants 95 15.0 95 15.0 0 0.0 Non-Supervisory Staff 61 1.0 61 1.0 0 0.0 Corporate Travel 775 0.0 775 0.0 0 0.0 Training
0LVVLRQ,7
7UDLQLQJDQG'HYHORSPHQW
2UJDQL]DWLRQDO'HYHORSPHQW
6XSHUYLVRU\\6WDII
$GPLQLVWUDWLYH$VVLVWDQWV
,76HFXULW\\
1RQ 6XSHUYLVRU\\6WDII
&RUSRUDWH7UDYHO
7RWDO$JHQF\\6XSSRUW&RUSRUDWH6XSSRUW5HVRXUFHV
7RWDOYDOXHRI&RUSRUDWH6XSSRUW5HVRXUFHV
FRQWUDFWIXQGLQJ )7(PXOWLSOLHGE\\6 %UDWH $7,803 $8,690.7
Office of Inspector General 2,386 68.0$ 2,377 58.0 910.0
Total value of the Office of Inspector General Resources (contract funding + 68 FTE multiplied by S&B rate) $ 14,727.42,386$ 2,377$ 11,873$ $9 $2854.8
Total Agency Support (Corporate Support and the IG)
Resources $ 146,080.9172,777$ 164,965$ 134,535.4$ $7,812 $11,545.5 10 CFR Part 170 Fees
Service Fees
Section III.A.2
Flat application fees are calculated by multiplying the average professional staff hours needed to process the licensing actions by the proposed professional hourly rate ($321 for FY 2024). The agency estimates the average professional staff hours every other year as part of its biennial review of fees which was performed in FY 2023.
Full cost fees are determined based on the professional staff time and appropriate contractual support of services. The full cost fees for professional staff time will be determined at the professional hourly rate in effect the time the service was provided.
The NRC estimates the amount of 10 CFR Part 170 fees for each fee class based on established fee methodology guidelines (42 FR 22149; May 2, 1977), which specified that the NRC has the authority to recover the full cost of providing services to identifiable beneficiaries. The NRC uses these established guidelines to apply the most current financial data and workload projections by offices and divisions to calculate the 10 CFR Part 170 fee estimates. Current financial data includes: 1) four quarters of the most recent billing data (professional hourly rate invoice data);
- 2) actual contractual work charged (prior period data) to develop contract work estimates; and
- 3) the number of FTE hours charged, multiplied by the NRC professional hourly rate.
ajfkAqflk=lc=jAqfAioq=NTM=AmmifCAqflk=cbbp d=Avfnection=CoGG cv=
FY2024 Professional Hourly Rate
$321
Materials Part 170 Fee FY 2023 FY 2024 Fee/Cost FY 2024 Estimated (Professional Time x FY Fee/Cost Category Professional 2024 Professional (Rounded)
Process Time Hourly Rate)
(Hours)*
ppeci=kuear=ji NCK==fndustrial=dauges Inspection Costs** 7.7 $2,474 $2,500 New License 4.6 $1,478 $1,500
K==All=lth=pkj=jiI=litical=mass Inspection Costs** 28.8 $9,254 $9,300 New License 9.3 $2,988 $3,000
pource=ji O_K=phielding Inspection Costs** 10 $3,213 $3,200 New License 4.4 $1,414 $1,400
OCK==bxempt=aistributionLpj Inspection Costs** 27.9 $8,965 $9,000 New License 21.4 $6,877 $6,900
K==d=iicense=airibution Inspection Costs** 15.6 $5,013 $5,000 New License 9.9 $3,181 $3,200
ObK==janufacting=aistributi Inspection Costs** 15.6 $5,013 $5,000 New License 9.5 $3,053 $3,100
K==All=lth=pource=ji Inspection Costs** 32.1 $10,315 $10,300 New License 9.5 $3,053 $3,100
_yprodu=ji PAK==jf_rpcope Inspection Costs** 78.3 $25,161 $25,200 New License 46.8 $15,039 $15,000
_yprodu=ji PANK==jf_rpcope Inspection Costs** 104.4 $33,547 $33,500 New License 62.2 $19,987 $20,000
_yprodu=ji PAOK==jf_rpcope Inspection Costs** 130.5 $41,934 $41,900 New License 77.7 $24,968 $25,000
01/22/2024 Page 1 DETERMINATION OF MATERIALS PART 170 APPLICATION FEES and Average Inspection Costs **
FY 2024 FY2024 Professional Hourly Rate
$321
Materials Part 170 Fee FY 2023 FY 2024 Fee/Cost FY 2024 Estimated (Professional Time x FY Fee/Cost Category Professional 2024 Professional (Rounded)
Process Time Hourly Rate)
3B. Mfg-Other
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3B1. Mfg-Other (sites 6-19)
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3B2. Mfg-Other (sites 20 or more )
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3C. Mfg/Distribution Radiopharmaceuticals
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3C1. Mfg/Distribution Radiopharmaceuticals
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3C2. Mfg/Distribution Radiopharmaceuticals
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3D. Distribution Radiopharmaceuticals/No Process
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3E. Irradiators/Self-Shielded
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3F. Irradiators < 10,000 Ci
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3G. Irradiators => 10,000 Ci
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3H. Exempt Distribution/Device Review
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3I. Exempt Distribution/No Device Review
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3DJH
DETERMINATION OF MATERIALS PART 170 APPLICATION FEES and Average Inspection Costs **
FY 2024 FY2024 Professional Hourly Rate
$321
Materials Part 170 Fee FY 2023 FY 2024 Fee/Cost FY 2024 Estimated (Professional Time x FY Fee/Cost Category Professional 2024 Professional (Rounded)
Process Time Hourly Rate)
3J. General License Distribution/Device Review
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3K. General License Distribution/No Device Review
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3L. R&D-Broad
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3L1 R&D-Broad
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3L2 R&D-Broad
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3M. R&D-Other
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3N. Service License
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3O. Radiography
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3O1. Radiography
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3O2. Radiography
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3P. All Other Byproduct Material
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3P1. All Other Byproduct Material
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3DJH
DETERMINATION OF MATERIALS PART 170 APPLICATION FEES and Average Inspection Costs **
FY 2024 FY2024 Professional Hourly Rate
$321
Materials Part 170 Fee FY 2023 FY 2024 Fee/Cost FY 2024 Estimated (Professional Time x FY Fee/Cost Category Professional 2024 Professional (Rounded)
Process Time Hourly Rate)
3P2. All Other Byproduct Material
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3R1. Radium-226 (less than or equal to 10x limits in 31.12)
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
3R2. Radium-226 (more than 10x limits in 31.12)
Inspection Costs** 16.2 $5,206 $5,200 New License 9 $2,892 $2,900
K==Aor=mroduced=oionuid Inspection Costs** 30.3 $9,736 $9,700 New License 51.1 $16,420 $16,400
K==tastmackaging Inspection Costs** 21 $6,748 $6,700 New License 24.9 $8,001 $8,000
K==tastmrackag Inspection Costs** 14.2 $4,563 $4,600 New License 18 $5,784 $5,800
RK tell=ioggi RAK==tell=ioggi Inspection Costs** 30.1 $9,672 $9,700 New License 16.5 $5,302 $5,300
kuear=indri K==kuear=indry Inspection Costs** 21.7 $6,973 $7,000 New License 79.7 $25,610 $25,600
eum=r K==qhy Inspection Costs** 89.4 $28,727 $28,700 New License 40 $12,853 $12,900
eum=r
==qhy Inspection Costs** 119.2 $38,303 $38,300 New License 53.2 $17,095 $17,100
eum=r
01/22/2024 Page 4 DETERMINATION OF MATERIALS PART 170 APPLICATION FEES and Average Inspection Costs **
FY 2024 FY2024 Professional Hourly Rate
$321
Materials Part 170 Fee FY 2023 FY 2024 Fee/Cost FY 2024 Estimated (Professional Time x FY Fee/Cost Category Professional 2024 Professional (Rounded)
Process Time Hourly Rate)
7A2. Teletherapy
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
7B. Medical-Broad
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
7B1. Medical-Broad
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
7B2. Medical-Broad
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
7C. Medical-Other
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
7C1. Medical-Other
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
7C2. Medical-Other
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
- 8. Civil Defense 8A. Civil Defense
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
- 9. Device, product or sealed source evaluation 9A. Device evaluation-commercial distribution
$SSOLFDWLRQ HDFKGHYLFH
9B. Device evaluation - custom
$SSOLFDWLRQ HDFKGHYLFH
9C. Sealed source evaluation - commercial distribution
$SSOLFDWLRQ HDFKVRXUFH
9D. Sealed source evaluation - custom
$SSOLFDWLRQ HDFKVRXUFH
- 10. Transportation
3DJH
DETERMINATION OF MATERIALS PART 170 APPLICATION FEES and Average Inspection Costs **
FY 2024 FY2024 Professional Hourly Rate
$321
Materials Part 170 Fee FY 2023 FY 2024 Fee/Cost FY 2024 Estimated (Professional Time x FY Fee/Cost Category Professional 2024 Professional (Rounded)
Process Time Hourly Rate)
10B. Evaluation - Part 71 QA program
$SSOLFDWLRQ DSSURYDO
- 17. Master Materials License1
,QVSHFWLRQ&RVWV
1HZ/LFHQVH
NOTES:
5RXQGLQJ URXQGHGWRQHDUHVW
RU! DQG URXQGHGWRQHDUHVW
RU! URXQGHGWRQHDUHVW
KRXUVEDVHGRQ)< %LHQQLDO5HYLHZ
,QVSHFWLRQFRVWVDUHXVHGLQFRPSXWDWLRQRIWKH$QQXDOIHHVIRU
WKHFDWHJRU\\
%HJLQQLQJZLWK)< IHHUXOH WKH0DVWHU0DWHULDOV/LFHQVH3DUW
DSSOLFDWLRQIHHZDVHOLPLQDWHG 3HU)60(
VUHFRPPHQGDWLRQLQ
WKHLU%LHQQLDO5HYLHZ WKHIHHIRUDQHZ00/OLFHQVHZLOOEHIXOO\\
FRVWHGEDVHGRQWKHKRXUVVSHQWRQUHYLHZLQJDQHZDSSOLFDWLRQ
3DJH
10 CFR Part 170 Fees
Export and Import Fees
Section III.A.2
Note: Since FY 2022 international activities are excluded from fee recovery requirement, fees are not assessed for import and export licensing actions (see fee categories K.1. through K.5. of § 170.21 and fee categories 15.A. through 15.R. of § 170.31).
FY 2024 MISSION DIRECT BUDGETED RESOURCES
IMPORT/EXPORT TOTAL ALLOCATIONS CONTRACT CONTRACT
$,K FTE $,K FTE NUCLEAR REACTOR SAFETY 74,966.5 1,722.50.0 0.0 NUCLEAR MATERIALS & WASTE SAFETY 32,883.3 460.90.0 0.0 CORPORATE 172,391.0 588.00.0 0.0 INSPECTOR GENERAL(no DNSFB) 2,386.0 68.0
SUBTOTAL - FEE BASE RESOURCE 282,626.8 2,839.40.0 0.0
Figures below in $, M (unless otherw ise indicated)
(1) FY 2024 ALLOCATIONS: equals $, K + FTE*FTE rate (show n below ) 0.0000
(2) LESS ESTIMATED 10 CFR PART 170 FEE COLLECTIONS 0.00
(3) ALLOCATIONS (equals 1 - 2) 0.00
(4) GENERIC TRANSPORTATION RESOURCES (allocated)
(5) NET 10 CFR PART 171 ALLOCATIONS (after transportation allocated)(equals 3+4) 0.00
(6) FY 2024 TOTAL ALLOCATIONS (after transportation allocation) (equals 2+5) 0.00
(7) % OF BUDGET (% total allocations, excl. fee-relief activities, import/export alloc, small entity ) 0.00%
(8) LLW Surcharge
(9) LLW Surcharge per licensee
(10) 10 CFR Part 171 billing adjustments 0.00
(11) Adjustments: 0.00
(12) TOTAL FY 2024 ANNUAL FEE (equals 5+8+10+11) 0.00
(13) Number of Licensees
(14) Fee Per License (equals 12/13) GLIIHUHQWIRU
GLIIHUHQW
FDWHJRULHVRI
OLFHQVHV VHH
RWKHU
ZRUNVKHHWV unrounded annual fee amount per license, actual $
rounded annual fee, actual $
FTE FULLY COSTED RATE (average based on budget data, actual $):
6HH'HWHUPLQDWLRQRI+RXUO\\5DWHIRUFDOFXODWLRQV Mission Direct Budgeted Resources Allocated to Import-Export Fee Class
FY24 FY23 Difference Contract ($,K) FTE Contract ($,K) FTE Contract ($,K) FTE
mdjW=krCibAAlo=pAcbqv
_rpfppfWmbqf=obAl PRODUCT LINE/PRODUCTS:
International Activities Licensing Import/Export 0 0.0 0 0.0 0 0.0 Total Direct Resources 0 0.0 0 0.0 0 0.0
Grand Total Nuclear Reactor Safety 0 0.0 0 0.0 0 0.0
PROGRAM: NUCLEAR MATERIALS AND WASTE SAFETY BUSINESS LINE: FUEL FACILITIES PRODUCT LINE/PRODUCTS:
International Activities Licensing Import/Export 0 0.0 0 0.0 0 0.0 Total Direct Resources 0 0.0 0 0.0 0 0.0
PROGRAM: NUCLEAR MATERIALS AND WASTE SAFETY BUSINESS LINE: NUCLEAR MATERIALS USERS PRODUCT LINE/PRODUCTS:
International Activities Licensing Import/Export 0 0.0 0 0.0 0 0.0 Total Direct Resources 0 0.0 0 0.0 0 0.0
PROGRAM: NUCLEAR MATERIALS AND WASTE SAFETY BUSINESS LINE: DECOMMISSIONING AND LOW LEVEL WASTE PRODUCT LINE/PRODUCTS:
Total Direct Resources 0 0.0 0 0.0 0 0.0
PROGRAM: NUCLEAR MATERIALS AND WASTE SAFETY BUSINESS LINE: SPENT FUEL STORAGE AND TRANSPORTATION PRODUCT LINE/PRODUCTS:
Total Direct Resources 0 0.0 0 0.0 0 0.0
Grand Total Nuclear Materials & Waste Safety 0 0.0 0 0.0 0 0.0
TOTAL 0 0.0 0 0.0 0 0.0
Total value of budgeted resources for fee class (mission direct FTE x full cost of FTE +
mission direct contract $) $0 $0 $0
01/28/2024 Page 11 of 16 DETERMINATION OF MATERIALS PART 170 APPLICATION FEES and Average Inspection Costs **
FY 2024 FY2024 Professional Hourly Rate
$321
Materials Part 170 Fee FY 2023 FY 2024 Fee/Cost FY 2024 Estimated (Professional Time x FY Fee/Cost Category Professional 2024 Professional (Rounded)
Process Time Hourly Rate)
DETERMINATION OF EXPORT AND IMPORT PART 170 FEES FY 2024 FY 2024 Professional Hourly Rate = $321
Export and Import Part 170 Fees )< FY 2024 Fee/Cost )<
(VWLPDWHG (Professional Time x FY )HH &RVW
Category 3URIHVVLRQDO2024 Professional 5RXQGHG
3URFHVV7LPH Hourly Rate)
(Hours)*
10 CFR 170.21, Category K Subcategory 1 0 0 0 2 0 0 0 3 0 0 0 4 0 0 0 5 0 0 0
NM=Cco=PNI=Cory=
pubcategory A 0 0 0 B 0 0 0 C 0 0 0 D 0 0 0 E 0 0 0 F 0 0 0 G 0 0 0 H 0 0 0 I 0 0 0 J 0 0 0 K 0 0 0 L 0 0 0 M 0 0 0 N 0 0 0 O 0 0 0 P 0 0 0 Q 0 0 0 R 0 0 0
klqbpW The application fees and amendment fees are the same for each subcategory because, per discussion with IP representatives, the processing time is the same for a new license or an amendment to the license.
Rounding: <$1000 rounded to nearest $10,
=or>$1000 and <$100,000 rounded to nearest $100,
=or>$100,000 rounded to nearest $1,000
,QDFFRUGDQFHZLWKWKH&RPPLVVLRQ¶VVXEVWDQWLYHIHHSROLF\\GHFLVLRQIRU)< IHHVZLOOQRWEHDVVHVVHGIRULPSRUWDQGH[SRUWLQJOLFHQVLQJ
DFWLYLWLHVVHHIHHFDWHJRULHV. WKURXJK. RI DQGIHHFDWHJRULHV $ WKURXJK 5 RI XQGHUWKLVSURSRVHGUXOH
3DJH
10 CFR P art 170 Fees
Reciprocity Fees - Agreement State Licensees
Section III.A.2
The ap plication f ee fo r A gre ement S tate license es who c onduct activities un der t he r eciprocity provisions o f 10 C FR 150. 20 is de termi ned usin g FY s 2017 th roug h 20 21 dat a an d the FY 2023 professio nal hou rly rat e. T he FYs 2017-2021 recipr ocity fee data w as provi ded as part of th e FY 2023 biennial review of f ees.
DETERMINATION OF MATERIALS PART 170 APPLICATION FEES and Average Inspection Costs **
FY 2024 FY2024 Professional Hourly Rate
$321
Materials Part 170 Fee FY 2023 FY 2024 Fee/Cost Estimated (Professional Time x FY Category Professional 2024 Professional Process Time Hourly Rate)
DETERMINATION OF RECIPROCITY PART 170 FEES FY 2024
NOTES:
The reciprocity application and revision fees are determined using FYs 2017-2021 data*, and the FY 2024 professional hourly rate.
The reciprocity application fee includes average costs for inspections, average costs for processing initial filings of NRC Form 241, and average costs for processing changes to the initial filings of NRC Form 241.
FY 2024 Professional Hourly Rate: $321
Avg Inspection Average inspection costs: Costs (Avg. no.
Reciprocity Part 170 Fee of hours for Total Amount insp. x Fee Category 16 professional hourly rate)
Rounded
Inspection (Average hours 34.4) $11,100 Number of Inspections Conducted for FY17-21 130 0
Total 130 $360,750 Average for the 5 years 32.5 fniti=OQNs===EAvhourof=inection= $700 Number of Completions for FY17-21 846 0
Total 846 $148,050
- Average for the 5 years 211.5 Revised 241s (Averag e hour s of inspection 0.5) $200 Number of Completions for FY17-21 6209 0
Total 6209 $310,450 Average for the 5 years 1552.25
AmmifCAqflk =
Amount for inspections [Cost/Initial 241 Avg.*] $1,706 Amount for initial filing of NRC Form 241[Cost/Initial 241 Avg.*] $700 Amount for revisions filing of NRC Form 241 [Cost/Initial 241 Avg.*] $1,468 Total Application Fee $3,874 Application Fee Rounded $3,900
- data based on FY 2023 Biennial Review
Page 1 10 CFR Par t 170 Fees
General License Registration Fees
Section III.A.2
This fee unde r byp roduct mate rial is fo r regist ration of a device(s ) gen erally licens ed un der 10 C FR Part 31.
DETERMINATION OF MATERIALS PART 170 APPLICATION FEES and Average Inspection Costs **
FY 2024 FY2024 Professional Hourly Rate
$321
Materials Part 170 Fee FY 2023 FY 2024 Fee/Cost Estimated (Professional Time x FY Category Professional 2024 Professional Process Time Hourly Rate)
DETERMINATION OF GENERAL LICENSE REGISTRATION FEE, FY 2024 (FEE CATEGORY 3Q)
Total % Supporting Total Supporting GL Resources Registrable GLs Registrable GLs NMSS GL Program
EXGJHWHG)7(
5HJLRQV
+4
EXGJHWHGFRQWUDFW
5HJLRQV
HQ
full cost of F TE
Total budgeted resources, NMSS GL Program (equals full cost of FTE + contract $)
Less: portion of budget ed resources associated w/fee exempt GLs (nonprofit educational)
net to be recovered
fee assuming 499 registrable GLs
fee, rounded $2,200
Data based on the NRC budget documents and the 10/22 email (NMSS GL program).
01/22/2024 Page 1 Fe e s C olle c te d for Pr ior Ye a r
A s part of t he NRCs fees t ransf orma tion, b eginnin g with th e FY 20 19 final f ee r ule work pape rs, we have co mpar ed th e FY 2023 act ual 10 C FR P art 1 70 an d P art 1 71 p ercent age of total collections with th e estim ated 1 0 CFR P ar t 170 and P ar t 171 perc entag e of t otal collectio ns.
FEES COLLECTED FOR PRIOR YEAR
FY 2023 Actual FY 2023 Actual FY 2022 Actual FY 2022 Actual Fee Class Part 170-User Fees % Part 171-Annual Fees Part 170-User Fees % Part 171-Annual Fees %
of Total Collections % of Total Collections of Total Collections for of Total Collections for for the Fee Class for the Fee Class the Fee Class the Fee Class Fee-Relief Activities 100% 0% 100% 0%
Operating Power Reactors 23% 77% 25% 75%
Fuel Facilities 31% 69% 36% 64%
Spent Fuel Storage/Reactor Decommissioning 28% 72% 31% 69%
Non-Power Production or Utilization Facilities 92% 8% 97% 3%
Uranium Recovery 57% 43% 69% 31%
Nuclear Materials Users 3% 97% 3% 97%
Rare Earth 100% 0% 100% 0%
Transportation 61% 39% 70% 30%
Export and Import Fees 0% 0% 0% 0%
Total 24% 76% 26% 74%
NRC will report fees collected for the prior fiscal year, by fee class, beginning with the FY 2018 final fee rule workpapers. Each fee class data includes distribution of fees collected as user fees (10 CFR Part 170) and annual fees (10 CFR Part 171).
10 CFR Part 171 Annual Fees
Section III.B 10 CFR Part 171 Annual Fees
Application of LLW Surcharge
Section III.B.1
Table IV
S eparately, the NRC has c ontinu ed to allocate t he low-l evel waste (LLW) s urcha rge based on th e volume of LLW dispos al of th ree cl asses of lice nsees, o per ating r eacto rs, fuel f acilities, an d materials users.
Mission Direct Budgeted Resources Allocated to Generic Low Level Waste Surcharge Category
FY24 FY23 Difference Contract ($,K) FTE Contract ($,K) FTE Contract ($,K) FTE
mdjW=krCibAo=jAqbAipApqbAcbqv
_rkbpp=ifkljjfppflkfkdkaltAb PRODUCT LINE/PRODUCTS:
Oversight LLW Regulation & Oversight 262 4.7 262 4.7 0 0.0 Rulemaking Rulemaking 88 2.5 88 3.2 0 (0.7)
Total Direct Resources 350 7.2 350 7.9 0 (0.7)
Grand Total Nuclear Materials & Waste Safety 350 7.2 350 7.9 0 (0.7)
TOTAL GENERIC LOW LEVEL WASTE 350 7.2 350 7.9 0 (0.7)
Total value of budgeted resources for fee class(mission direct FTE x full cost of FTE + mission direct contract $) $3,820 $4,023 $(202)
01/28/2024 Page 12 of 16 Low-Level Waste Surcharge for FY 2024 Proposed Fee Rule
- 1. Percentages to allocate remainder of Generic Low-Level Waste resources to Power Reactors, Fuel Facilities, and Materials
DOEs Manifest Information Management System (MIMS) database was used to determine a 5-year average ( Calendar Years 2018 - 2022) based on the DOE MIMS Clas s. The following were the results as of 03/13/2023:
Power Reactor: 73.3%
Fuel Facilities: 8.8%
Materials: 17.9%
87% of the Materials portion from the above distribution is allocated to Oversight of Agreement States (AS) off-fee base category. This results in the following distribution:
Power Reactor: 73.3%
Fuel Facilities: 8.8%
Materials (NRC): 2.3%
Materials (AS): 15.6 % *Allocate to Oversight of AS Fee Relief Category
To adjust the above Power Reactor, Fuel Facilities, and Materials (NRC) percentages, the percentages are divided by the total of the remainder after the AS portions were removed (100% - 15.6% = 84.4 %).
Power Reactor 73.3%/84.4% = 86. 9%
Fuel Facilities 8.8 %/84.4% = 10.4%
Materials (NRC) 2.3%/8 4.4% = 2.7%
10 CFR Part 171 Annual Fees
Operating Power Reactors
Section III.B.2.a
Table VI
In FY 2024, the NRC proposes to collect $515.9 million in annual fees from the operating power reactors fee class. The fee-recoverable budgeted costs are divided equally among the 94 licensed operating power reactors. This results in a FY 2024 proposed annual fee of $5,4 88,000 per operating power reactor. Additionally, the NRC estimates that each licensed operating power reactor will be assessed the FY 2024 spent fuel storage/reactor decommissioning proposed annual fee of $330,000. The NRC estimates that the combined FY 2024 proposed annual fee for each operating power reactor will be $5, 818,000.
Note: In FY 2016, the NRC amended 10 CFR 171.15 to establish a variable annual fee structure for light-water reactor (LWR) small modular reactors (SMRs) (81 FR 32617; May 24, 2016). In FY 2023, the NRC further amended part 171.5 to: 1) expand the applicability of the SMR variable fee structure to include non-LWR SMRs; and 2) establish an additional minimum fee and variable rate applicable to SMRs with a licensed thermal power rating of less than or equal to 250 megawatts-thermal (MWt) (88 FR 39120; June 15, 2023). This revision to the SMR variable annual fee structure retained the bundled unit concept for SMRs and the approach for calculating fees for reactors, or bundled units, with licensed thermal power ratings greater than 250 MWt.
Currently, there are no operating SMRs; therefore, the NRC will not assess an annual fee in FY 2024 for this type of licensee.
FY 2024 MISSION DIRECT BUDGETED RESOURCES
POWER REACTORS TOTAL ALLOCATIONS CONTRACT CONTRACT
$,K FTE $,K FTE NUCLEAR REACTOR SAFETY 74,966.5 1,722.5 59,698.0 1274.6 NUCLEAR MATERIALS & W ASTE SAFETY 32,883.3 460.9 51.0 2.1 CORPORATE 172,391.0 588.0 0.0 0.0 INSPECTOR GENERAL(no DNSFB) 2,386.0 68.0
SUBTOTAL - FEE BASE RESOURCE 282,626.8 2,839.4 59,749.0 1276.7
Figures below in $, M (unless otherwise indicated)
(1) FY 2024 ALLOCATIONS: equals $, K + FTE*FTE rate (shown below) 675.1
(2) LESS ESTIMATED 10 CFR PART 170 FEE COLLECTIONS 165.3
(3) ALLOCATIONS (equals 1 - 2) 509.9
(4) GENERIC TRANSPORTATION RESOURCES (allocated) 0.6
(5) NET 10 CFR PART 171 ALLOCATIONS (after transportation allocated)(equals 3+4) 510.5
(6) FY 2024 TOTAL ALLOCATIONS (after transportation allocation) (equals 2+5) 675.7
(7) % OF BUDGET (% total allocations, excl. fee-relief activities, import/export alloc, small entity ) 83.3%
(8) LLW Surcharge 3.3
(9) LLW Surcharge per licensee 0.0
(10) 10 CFR Part 171 billing adjustments 2.1
(11) Adjustments: 0.0
(12) TOTAL FY 2024 ANNUAL FEE (equals 5+8+10+11) 515.9
(13) Number of Licensees 94.0
(14) Fee Per License (equals 12/13) 5.5
unrounded annual fee amount per license, actual $ 5,488,098
rounded annual fee, actual $ 5,488,000
FTE FULLY COSTED RATE (average based on budget data, actual $):
6HH'HWHUPLQDWLRQRI+RXUO\\5DWHIRUFDOFXODWLRQV Mission Direct Budgeted Resources Allocated to Power Reactors Fee Class
)< )< 'LIIHUHQFH Contract ($,K) FTE Contract ($,K) FTE Contract ($,K) FTE mdjW=krCibAAlo=pAcbqv
_rpfppfW=kbt=obAl PRODUCT LINE / PRODUCTS:
Licensing Combined Licenses 815 24.9 150 10.6 665 14.3 Design Certification 260 31.9 188 17.2 72 14.7 EDO Operations 0 1.0 0 1.0 0 0.0 IT Infrastructure 0 0.0 1,441 2.0 (1,441) (2.0)
Licensing Actions 50 6.8 50 3.5 0 3.3 Licensing Support 197 27.0 1,702 24.8 (1,505) 2.2 Mission IT 184 1.1 1,772 3.1 (1,588) (2.0)
Part 50 1,540 57.2 43 1.0 1,497 56.2 Operator Licensing 0 0.0 0 0.0 0 0.0 Policy Advice & Outreach 0 1.5 0 1.0 0 0.5 Pre-Application Reviews 460 18.5 1,250 53.0 (790) (34.5)
Oversight Allegations & Investigations 0 0.0 0 1.9 0 (1.9)
Construction Inspection 0 0.0 0 12.0 0 (12.0)
Emergency Preparedness 0 0.5 0 0.5 0 0.0 Enforcement 4 2.8 16 3.0 (12) (0.2)
Security 203 1.2 203 0.7 0 0.5 Vendor Inspection 40 0.5 40 0.5 0 0.0 Research New Reactors Research 3,320 12.0 3,641 11.0 (321) 1.0 Rulemaking (PL)
5XOHPDNLQJ
5XOHPDNLQJ6XSSRUW
Training Mission Training 676 8.0 678 7.0 (2) 1.0 Mission IT 211 0.0 66 0.0 145 0.0 Organizational Development 21 0.0 21 0.0 0 0.0 Entry Level Hiring 0 5.0 0 5.0 0 0.0 Total Direct Resources 8,381 205.2 11,797 167.6 (3,416) 37.6
PROGRAM: NUCLEAR REACTOR SAFETY BUSINESS LINE: OPERATING REACTORS PRODUCT LINE/PRODUCTS:
Event Response Mission IT/Infrastructure 4,778 15.5 6,792 14.0 (2,014) 1.5 Response Operations 125 16.6 125 20.0 0 (3.4)
Response Program 500 16.5 0 16.5 500 0.0 Other Response Activities 1,200 0.4 0 0.0 1,200 0.4 Licensing EDO Operations 0 5.0 0 4.0 0 1.0 Emergency Preparedness 0 3.5 0 3.7 0 (0.2)
License Renewal 1,940 61.3 2,837 58.3 (897) 3.0 Licensing Actions 909 129.3 1,461 129.0 (552) 0.3 Licensing Support 2,102 76.2 2,425 90.8 (323) (14.6)
Mission IT/Infrastructure 4,207 4.0 1,024 0.0 3,183 4.0 Operator Licensing 100 40.6 100 40.6 0 0.0 Policy Outreach 0 3.0 0 3.0 0 0.0 Research & Test Reactors 300 5.3 0 7.0 300 (1.7)
RIC 860 1.0 800 1.0 60 0.0 Security 175 6.9 175 6.9 0 0.0 Oversight
$OOHJDWLRQV ,QYHVWLJDWLRQV
(PHUJHQF\\3UHSDUHGQHVV
(QIRUFHPHQW
(YHQW(YDOXDWLRQ
,QVSHFWLRQ
,QIRUPDWLRQ6HUYLFHV
,07HFKQRORJLHV
,7,QIUDVWUXFWXUH
0LVVLRQ,7
6HFXULW\\
9HQGRU,QVSHFWLRQ
Research
3DJH RI
Mission Direct Budgeted Resources Allocated to Power Reactors Fee Class
FY24 FY23 Difference Contract ($,K) FTE Contract ($,K) FTE Contract ($,K) FTE Aging & Materials Research 0 18.0 5,237 17.3 (5,237) 0.7 Evaluation and Evidence 500 7.0 150 7.0 350 0.0 Engineering Research 300 22.0 2,870 21.9 (2,570) 0.1 Mission IT 3,024 3.0 3,445 3.0 (421) 0.0 Mission IT Infrastructure 526 0.0 0 0.0 526 0.0 Reactor Research Support 1,400 13.0 1,000 11.0 400 2.0 Risk Analysis 2,904 44.8 11,300 45.3 (8,396) (0.5)
Systems Analysis Research 1,300 16.2 6,442 16.5 (5,142) (0.3) oulemakingmiF Rulemaking 210 21.6 100 18.2 110 3.4 Rulemaking Support 300 10.6 300 11.8 0 (1.2) qraining Entry Level Hiring 0 18.0 0 18.0 0 0.0 Organizational Development 105 0.0 105 0.0 0 0.0 Mission IT 39 0.0 398 0.0 (359) 0.0 Mission Training 3,724 25.8 3,704 25.8 20 0.0 Total Direct Resources 51,317 1,069.4 74,834 1,075.8 (23,517) (6.4)
==========drdotuearory 59,698 1,274.6 86,631 1,243.4 (26,933) 31.2
mdjW=krCibAo=jAqbAipApqbAcbqv
_rkbpp=ifkrACfifqf PRODUCT LINE/PRODUCTS:
Licensing Licensing Actions 0 0.4 0 0.0 0 0.4 Total Direct Resources 0 0.4 0 0.0 0 0.4
PROGRAM: NUCLEAR MATERIALS AND WASTE SAFETY BUSINESS LINE: NUCLEAR MATERIALS USERS PRODUCT LINE/PRODUCTS:
Rulemaking (PL)
Rulemaking Support 0 0.1 0 0.0 0 0.1 Oversight IT Infrastructure 46 0.0 0 0 46 0.0 Inspection 5 0.0 5 0.0 0 0.0 State, Tribal and Federal Programs Liaison 0 1.4 0 1.1 0 0.3 Training Mission Training 0 0.2 0 0.2 0 0.0 Total Direct Resources 51 1.7 5 1.3 46 0.4
Grand Total Nuclear Materials & Waste Safety 51.0 2.1 5.0 1.3 46 0.8
TOTAL POWER REACTORS 59,749 1,276.7 86,636 1,244.7 (26,887) 32.0
Total value of budgeted resources for fee class (mission direct FTE x full cost of FTE +
mission direct contract $) $675,126 $665,329 $9,797
The budgetary resources allocated to Power Reactors Fee Class from Nuclear Materials & W aste Safety Program include (but are not limited to) activities pertaining to analysis, data collection, fuel safety, modeling future strategies for disposal of spent fuel and high level waste and monitoring developments in the evolving national waste management strategy. In addition to state liasion, tribal program activities, dosimeter costs and materials training widely attended by all agency staff including inspectors benefitting numerous facets of the agency's mission.
01/28/2024 Page 2 of 16 OPERATING POW ER REACTOR ANNUAL FEE FY 2024
NUMBER OF POW ER REACTORS LICENSED TO OPERATE:
(by Nuclear Steam System Supplier & Design Type)
W estinghouse 48
General Electric 31
Combustion Engineering 10
Babcock & W ilcox 5
TOTAL REACTORS 94
DETERMINATION OF ANNUAL FEE:
TOTAL BUDGETED COSTS FOR OPERATING POW ER REACTORS (PRIOR TO 10 CFR PART 170 & OTHER ADJUSTMENTS) $675,126,604
ANNUAL FEE PER REACTOR (rounded) $ 5,488,000 (BUDGETED COSTS DIVIDED BY 94 OPERATING POW ER REACTORS)
PLUS SPENT FUEL STORAGE/
REACTOR DECOMMISSIONING ANNUAL FEE $330,000
TOTAL ANNUAL FEE PER LICENSE 5,818,000$
01/22/2024 Consumer Price Index* Trend Analysis
Operating Reactor Year Jan Feb Mar Apr May June July Aug Sep Oct Nov Dec Average Annual Fee Based on CPI in Accordance with N E IMA*
- 2014 1.6 1.1 1.5 2.0 2.1 2.1 2.0 1.7 1.7 1.7 1.3 0.8 1.6 $5,223,000 2015 -0.1 0.0 -0.1 -0.2 0.0 0.1 0.2 0.2 0.0 0.2 0.5 0.7 0.1 $4,807,000 2016 1.4 1.0 0.9 1.1 1.0 1.0 0.8 1.1 1.5 1.6 1.7 2.1 1.3 $4,869,491 2017 2.5 2.7 2.4 2.2 1.9 1.6 1.7 1.9 2.2 2.0 2.2 2.1 2.1 $4,971,750 2018 2.1 2.2 2.4 2.5 2.8 2.9 2.9 2.7 2.3 2.5 2.2 1.9 2.5 $5,096,044 2019 1.6 1.5 1.9 2.0 1.8 1.6 1.8 1.7 1.7 1.8 2.1 2.3 1.8 $5,187,773 2020 2.5 2.3 1.5 0.3 0.1 0.6 1.0 1.3 1.4 1.2 1.2 1.4 1.2 $5,250,026 2021 1.4 1.7 2.6 4.2 5.0 5.4 5.4 5.3 5.4 6.2 6.8 7.0 4.7 $5,496,777 2022 7.5 7.9 8.5 8.3 8.6 9.1 8.5 8.3 8.2 7.7 7.1 6.5 8.0$5,936,520 2023 6.4 6.0 5.0 4.9 4.0 3.0 3.2 3.7 3.7 3.2 3.1 3.4 4.1 $6,179,917 Average 2.7 2.6 2.7 2.7 2.7 2.7 2.8 2.8 2.8 2.8 2.8 2.8 2.7
- Consumer Price Index (CPI-U) data is provided by the U.S. Department of Labor Bureau of Labor Statistic.
- Changes in the annual fees are based on the Consumer Price Index starting in fiscal year 2016.
Reconciliation of Operating & New Reactor Business Line vs. Fee Class Reactor Business Lines (CBJ)
(Dollars in thousands)
Contract $ FTE Product Lines Advanced Reactors 14,868.0 77.6 Event Response 6,603.0 49.0 Generic Homeland Security 0.0 7.0 International Activities 190.0 33.0 Licensing 14,969.0 545.0 Oversight 20,038.0 496.0 Rulemaking 910.0 37.5 Research 13,274.0 136.0 Mission Support/Supervisors 2,227.5 368.0 State/Tribal/Federal Programs 0.0 0.0 Training 5,689.0 58.0 Travel 11,066.0 0.0
$ 1,807.189,834.5
FTE rate $226,900 times 1,447.3 FTEs; $233,580 times 249.2 FTEs; $239,350 times 33.0 FTEs; $249,170 times 77.6 FTEs (includes Salaries & Benefits only ) $ 413,838.6
Total Business Line Budget (BL) 89,834.5$ $ 413,838.6 = 503,673.1$
Operating Power Reactors Fee Class (Proposed Fee Rule)
Deductions from BL resources
$GYDQFHG5HDFWRUV
(YHQW5HVSRQVH
- HQHULF+RPHODQG6HFXULW\\
,QWHUQDWLRQDO$FWLYLWLHV
/LFHQVLQJ
2YHUVLJKW
5HVHDUFK
5XOHPDNLQJ
0LVVLRQ6XSSRUW 6XSHUYLVRUV
7UDLQLQJ
7UDYHO
Increases from Other resources
/LFHQVLQJ
2YHUVLJKW
(YHQW5HVSRQVH
5XOHPDNLQJ
6WDWH 7ULEDO )HGHUDO3URJUDPV
7UDLQLQJ
BL resources w/ fee rule allocations 59,749.0$ 1,276.7
FTE fully costed rate $482,006 times 1276.7 FTEs (includes $ 615,377.1 Salaries, Benefits, indirect resources & agency support)
Total Fee Class Budget 59,749.0$ $ 615,377.1 = 675,126.06$
Variances $ (530) 201,538.4(30,085.5)$ 171,452.9$
Notes:
Deductions include: Exclusion Items 1, Indirect resources 2, resources allocated to other
fee classes/fee-relief categories 3 and Appropriation changes 5
Increases include: Resources allocated from other Business Lines 4 (i.e., Nuclear Materials and Decommissioning/LLW )
10 CFR Part 171 Annual Fees
Spent Fuel Storage/Reactor Decommissioning
Section III.B.2.b
Table VII
For FY 2024, budg eted c osts of appr oximately $40.9 million fo r spen t fuel st orag e/re actor decommissio ning a re to be r ecover ed th roug h ann ual fees assesse d to p art 5 0 powe r re actor licensees, an d to p art 7 2 license es who d o not hold a part 50 licens e. Th ose r eactor licensees that have ceas ed op eratio ns and have no fu el onsite are n ot subj ect to t hese a nnual f ees. The r equir ed annual f ee rec overy amou nt is divide d equ ally amo ng 124 licensees, resulti ng in a FY 202 4 ann ual fee of $330,0 00 pe r license e.
FY 2024 MISSION DIRECT BUDGETED RESOURCES SPENT FUEL STORAGE/
REACTOR DECOMM.
TOTAL ALLOCATIONS CONTRACT CONTRACT
$,K FTE $,K FTE NUCLEAR REACTOR SAFETY 74,966.5 1,722.51.0 0.3 NUCLEAR MATERIALS & W ASTE SAFETY 32,883.3 460.95,854.5 93.3 CORPORATE 172,391.0 588.00.0 0.0 INSPECTOR GENERAL(no DNSFB) 2,386.0 68.0
SUBTOTAL - FEE BASE RESOURCE 282,626.8 2,839.45,855.5 93.6
Figures below in $, M (unless otherwise indicated)
(1) FY 2024 ALLOCATIONS: equals $, K + FTE*FTE rate (shown below) 51.0
(2) LESS ESTIMATED 10 CFR PART 170 FEE COLLECTIONS 12.2
(3) ALLOCATIONS (equals 1 - 2) 38.8
(4) GENERIC TRANSPORTATION RESOURCES (allocated) 2.0
(5) NET 10 CFR PART 171 ALLOCATIONS (after transportation allocated)(equals 3+4) 40.7
(6) FY 2024 TOTAL ALLOCATIONS (after transportation allocation) (equals 2+5) 52.9
(7) % OF BUDGET (% total allocations, excl. fee-relief activities, import/export alloc, small entity ) 6.52%
(8) LLW Surcharge 0.0
(9) LLW Surcharge per licensee
(10) 10 CFR Part 171 billing adjustments 0.2
(11) Adjustments: 0.000
(12) TOTAL FY 2024 ANNUAL FEE (equals 5+8+10+11) 40.878
(13) Number of Licensees 124
(14) Fee Per License (equals 12/13) 0.330
unrounded annual fee amount per license, actual $ 329,663
rounded annual fee, actual $ 330,000
FTE FULLY COSTED RATE (average based on budget data, actual $):
6HH'HWHUPLQDWLRQRI+RXUO\\5DWHIRUFDOFXODWLRQV Mission Direct Budgeted Resources Allocated to Spent Fuel Storage/Reactor Decommissioning Fee Class
FY24 FY23 Difference Contract ($,K) FTE Contract ($,K) FTE Contract ($,K) FTE mdjW=krCibAAlo=pAcbqv
_rpfppfW=kbt=obAl PRODUCT LINE / PRODUCTS:
Oversight Allegations & Investigations 0 0.0 0 0.1 0 (0.1)
Total Direct Resources 0 0.0 0 0.1 0 (0.1)
mdjW=krCibAAlo=pAcbqv
_rpfppfWmbqf=obAl PRODUCT LINE/PRODUCTS:
Oversight Allegations & Investigations 0 0.2 0 0.1 0 0.1 Enforcement 1 0.1 1 0.1 0 0.0 Rulemaking 0 0.0 Rulemaking (PL) 0 0.0 0 0.0 0 0.0 Training 0 0.0 Mission Training 0 0.0 158 0.0 (158) 0.0 Mission IT 0 0.0 0 0.0 0 0.0 Total Direct Resources 1 0.3 159 0.2 (158) 0.1
Grand Total Nuclear Reactor Safety 1.0 0.3 159.0 0.3 (158) 0.0
PROGRAM: NUCLEAR MATERIALS AND WASTE SAFETY BUSINESS LINE: FUEL FACILITIES PRODUCT LINE/PRODUCTS:
Oversight Mission IT/Infrastructure 119 0.0 0 0.0 119 0 Total Direct Resources 119 0.0 0 0.0 119 0
mdjW=krCibAo=jAqbAipApqbAcbqv
_rpfppfW=krCibAo=jAqbAip=rpb PRODUCT LINE/PRODUCTS:
Licensing Mission IT 100 0.0 300 0.0 (200) 0.0 EDO Operations 0 0.5 0 0.5 0 0.0 lversight Enforcement 2 0.8 2 0.8 0 0.0 Inspection 5 0.0 5 0.0 0 0.0 qrai Mission Training 0 0.2 0 0.2 0 0.0 Total Direct Resources 107.0 1.5 307.0 1.5 (200) 0.0
mdjW=krCibAo=jAqbAipApqbAcbqv
_rkbpp=ifkljjfppflkfkdkaltAb PRODUCT LINE/PRODUCTS:
Licensing Decommissioning Licensing Actions 1,250 16.6 550 7.8 700 8.8 Mission IT 51 0.0 95 0.0 (44) 0.0 IT Infrastructure 623 0.0 358 0.0 265 0.0 Policy Advice & Outreach 0 1.0 0 0.5 0 0.5 lversight Inspection 0 10.9 0 9.8 0 1.1 oulang Rulemaking (PL) 0 0.6 0 0.0 0 0.6 qrai Mission Training 230 0.0 246 0.0 (16) 0.0 Entry Level Hiring 0 2.0 0 0.0 0 2.0 Total Direct Resources 2,154 31.1 1,249 18.1 905 13.0
mdjW=krCibAo=jAqbAipApqbAcbqv
_rkbpp=ifk=pmbkqr=pqloAdb=AkaoAkpmloqAqflk PRODUCT LINE/PRODUCTS:
Licensing Environmental Reviews 0 0.0 75 2.0 (75) (2.0)
Licensing Actions 10 1.7 10 1.5 0 0.2 Licensing Support 150 10.5 150 10.4 0 0.1 Mission IT/Infrastructure 361.5 0.0 163 0.0 199 0.0 Policy Outreach 0 2.0 0 2.0 0 0.0 Security 0 4.0 0 4.0 0 0.0 Storage Licensing 440 18.5 440 20.0 0 (1.5) lversight Allegations and Investigations 0 0.2 0 0.2 0 0.0 Enforcement 0 1.0 0 1.0 0 0.0 Security 0 2.1 0 2.0 0 0.1 Inspection 0 13.7 0 12.9 0 0.8 oesr W aste Research 1,900 3.0 1,475 3.4 425 (0.4) oulang
01/28/2024 Page 3 of 16 Mission Direct Budgeted Resources Allocated to Spent Fuel Storage/Reactor Decommissioning Fee Class
FY24 FY23 Difference Contract ($,K) FTE Contract ($,K) FTE Contract ($,K) FTE Rulemaking (PL) 0 2.5 0 1.8 0 0.7 Rulemaking Support 400 0.5 400 0.2 0 0.3 qrai Mission Training 208 0.0 202 0.0 6 0.0 Organizational Development 5 0.0 6 0.0 (1) 0.0 Entry Level Hiring 0 1.0 0 1.0 0 0.0 Total Direct Resources 3,474.5 60.7 2,921 62.4 554 (1.7)
==========drandotaluratialsteafety 5,854.5 93.3 4,636.0 82.3 1,219 11.0
qlqAimbiqldb=C=obAljjK 5,855.5 93.6 4,636 82.3 1,219 11.0
Total value of budgeted resources for fee class(mission direct FTE x full cost of FTE
+ mission direct contract $) $50,971 $42,899 $8,072
01/28/2024 Page 4 of 16 SPENT FUEL STORAGE/REACTOR DECOMMISSIONING ANNUAL FEE FY 2024
LICENSES SUBJECT TO THE ANNUAL FEE:
Operating Power Reactor Licensees: 94
Power Reactors in Decommissioning or Possession Only Status with Fuel Onsite
Reactors Docket No.
Big Rock Point 50-155 Indian Point, Unit 1 50-003 Dresden, Unit 1 50-010 Haddam Neck 50-213 La Crosse 50-409 Maine Yankee 50-309 Millstone 1 50-245 San Onofre, Unit 1 50-206 Yankee Rowe 50-029 Zion 1 50-295 Zion 2 50-304 Crystal River 3 50-302 Kewaunee 50-305 San Onofre, Unit 2 50-361 San Onofre, Unit 3 50-362 Vermont Yankee 50-271 Fort Calhoun 50-285 Oyster Creek 50-219 Pilgrim 50-293 Three Mile Island, Unit 1 50-289 Indian Point, Unit 2 50-247 Indian Point, Unit 3 50-286 Duane Arnold 50-331 Palisades 50-255
Total No. of Reactors in decommissioning or possession only status with fuel onsite: 24
Part 72 Licensees without a Part 50 License
Ft. St. Vrain 72-009 GE Morris72-001 DOE Idaho Spent Fuel Facility 72-025 Trojan 72-017 Humboldt, Unit 3 72-027 Rancho Seco 72-011
Total Part 72 licenses: 6
The annual fee is determined by dividing the total budgeted costs of approximately $40.9 million by the total number of licensees 124. This results in an annual fee (rounded) of $330,000 per license.
02/06/2024 Reconciliation of Spent Fuel Storage/ Spent Fuel Storage/
Transportation Business Line vs. Fee Class Transportation Business Line (Dollars in thousands) (CBJ)
Contract $ FTE Product Lines Event Response 0.0 0.0 Generic Homeland Security 0.0 0.0 International Activities 0.0 1.5 Licensing 2,506.0 55.0 Oversight 0.0 19.0 Research 1,900.0 3.0 Rulemaking 400.0 5.0 Mission Support/Supervisors 1.0 15.0 State/Tribal/Federal Programs 0.0 0.0 Training 301.0 2.0 Travel 476.0 0.0
$ 5,584.0 100.5
FTE rate $231,150 times 99.0 FTEs; $239,400 times 1.5 FTE (includes Salaries & Benefits only) $ 23,243.0
Total Business Line Budget (BL) 5,584.0$ $ 23,243.0 = 28,827.0$
Spent Fuel Storage/ Reactor Decommissioning Fee Class (Proposed Fee Rule)
Deductions from BL resources
(YHQW5HVSRQVH
- HQHULF+RPHODQG6HFXULW\\
,QWHUQDWLRQDO$FWLYLWLHV
/LFHQVLQJ
2YHUVLJKW
0LVVLRQ6XSSRUW 6XSHUYLVRUV
5HVHDUFK
5XOHPDNLQJ
6WDWH 7ULEDO )HGHUDO3URJUDPV
7UDLQLQJ
7UDYHO
Increases from Other resources
,QWHUQDWLRQDO$FWLYLWLHV
/LFHQVLQJ
2YHUVLJKW
5XOHPDNLQJ
7UDLQLQJ
BL resources w/ fee rule allocations $ 93.65,855.5
FTE fully costed rate $482,006 times 93.6 FTE $ 45,115.8
Total Fee Class Budget 5,855.5$ $ 45,115.8 = 50,971.26$
Variances $ (6.9) 21,872.8271.5$ 22,144.3$
Notes:
Deductions include: Exclusion Items 1, Indirect resources 2, resources allocated to other fee classes/fee relief categories 3 and Carryover/Appropriation reductions 5
Increases include: resources allocated from other Business Lines 4 (i.e. Nuclear Materials and Decommissioning/LLW )
10 CFR Part 171 Annual Fees
Fuel Facilities
Section III.B.2. c Table VIII Table IX Table X
The FY 2024 budge ted cos t to b e recov ere d in the annu al fees assessme nt to t he fu el facility class of licenses [which includes lice nsees in fee cat egori es 1.A.(1 )(a ), 1.A.( 1)(b ), 1.A.( 2)( a), 1.A. (2)( b),
1.A.(2)(c ), 1.E., a nd 2.A. (1), unde r §17 1.16] is appr oximat ely $24. 9million. This valu e is base d on the full cost of bu dgete d res ources associate d with all activities that s uppo rt this f ee class, which is reduce d by esti mated 10 CFR Pa rt 17 0 collections and adjusted for allocated gene ric transpo rtatio n reso urces, and t he low-lev el waste su rcha rge.
FY 2024 MISSION DIRECT BUDGETED RESOURCES
FUEL FACILITY TOTAL ALLOCATIONS CONTRACT CONTRACT
$,K FTE $,K FTE NUCLEAR REACTOR SAFETY 74,966.5 1,722.50.0 0.0 NUCLEAR MATERIALS & WASTE SAFETY 32,883.3 460.93,342.3 60.3 CORPORATE 172,391.0 588.00.0 0.0 INSPECTOR GENERAL(no DNSFB) 2,386.0 68.0
SUBTOTAL - FEE BASE RESOURCE 282,626.8 2,839.43,342.3 60.3
Figures below in $, M (unless otherw ise indicated)
(1) FY 2024 ALLOCATIONS: equals $, K + FTE*FTE rate (show n below ) 32.4
(2) LESS ESTIMATED 10 CFR PART 170 FEE COLLECTIONS 10.5
(3) ALLOCATIONS (equals 1 - 2) 21.9
(4) GENERIC TRANSPORTATION RESOURCES (allocated) 2.5
(5) NET 10 CFR PART 171 ALLOCATIONS (after transportation allocated)(equals 3+4) 24.4
(6) FY 2024 TOTAL ALLOCATIONS (after transportation allocation) (equals 2+5) 34.9
(7) % OF BUDGET (% total allocations, excl. fee-relief activities, import/export alloc, small entity ) 4.30%
(8) LLW Surcharge 0.4
(9) LLW Surcharge per licensee
(10) 10 CFR Part 171 billing adjustments 0.1
(11) Adjustments: 0.00
(12) TOTAL FY 2024 ANNUAL FEE (equals 5+8+10+11) 24.9
(13) Number of Licensees
(14) Fee Per License (equals 12/13) different for different categories of licenses; see other worksheets unrounded annual fee amount per license, actual $
rounded annual fee, actual $
FTE FULLY COSTED RATE (average based on budget data, actual $):
6HH'HWHUPLQDWLRQRI+RXUO\\5DWHIRUFDOFXODWLRQV Mission Direct Budgeted Resources for Fuel Facilities Fee Class
FY24 FY23 Difference Contract ($,K) FTE Contract ($,K) FTE Contract ($,K) FTE
mdjW=bAAlpAcbqv
_rpfpp=ifW=lmbqf=Al PRODUCT LINE/PRODUCTS:
Training Mission IT 0 0.0 5 0.0 (5) 0 Total Direct Resources 0 0.0 5 0.0 (5) 0
=drand=qot=kuoopy 0.0 0.0 5 0.0 (5) 0.0
moldoAjW=krCAo=jAofA=Aka=p=pA
_rpfkbpp=kbW=bCfbp PRODUCT LINE/PRODUCTS:
Event Response Response Operations 90 2.2 45 2.0 45.0 0.2 cei Licensing Actions 2,823 25.2 1,400 20.7 1,423.3 4.5 Policy Outreach 0 0.0 0 0.0 0.0 0.0 Security 0 2.1 0 2.1 0.0 0.0 lversight Allegations & Investigations 0 1.0 0 1.0 0.0 0.0 Enforcement 10 1.8 10 1.8 0.0 0.0 Inspection 0 19.7 0 17.7 0.0 2.0 IT Infrastructure 0 0.0 387 0.0 (387.0) 0.0 Mission IT 0 0.0 37 0.0 (37.0) 0.0 Security 50 4.5 50 4.5 0.0 0.0 oemaking=Em Rulemaking 25 2.0 0 1.0 25.0 1.0 ai Mission Training 218 0.0 211 0.0 7.0 0.0 Mission IT 17 0.0 18 0.0 (1.0) 0.0 Organizational Development 5 0.0 5 0.0 0.0 0.0 Entry Level Hiring 0 1.0 0 1.0 0.0 0.0 Total Direct Resources 3,238.3 59.5 2,163.0 51.8 1,075.3 7.7
moldoAjW=krCAo=jAofA=Aka=p=pA
_rpfpp=ifW=bAjAqbAip=b PRODUCT LINE/PRODUCTS:
Licensing Mission IT 100 0.0 0 0.0 100.0 0.0 lversight Inspection 4 0.0 4 0.0 0.0 0.0 ptqb=d=c=mg Liaison 0 0.6 0 0.5 0.0 0.1 ai Mission Training 0 0.2 0 0.2 0.0 0.0 Total Direct Resources 104.0 0.8 4.0 0.7 100.0 0.1
=drand=qot=kujeriC=tastpy 3,342.3 60.3 2,172.0 52.5 1,170.3 7.8
bCf 3,342.3 60.3 2,172 52.5 1,170.3 7.8
Total value of budgeted resources for fee class(mission direct FTE x full cost of FTE
+ mission direct contract $) $32,407 $26,581 $5,827
01/28/2024 Page 6 of 16 USING 10/23 MATRIX
FUEL FACILITY ANNUAL FEES FY 2024
10 CFR Part 171 Amount $24,371,569 Less Billing Adjustment 107,483 Less Recission Adjustment 0 TOTAL $24,479,052 T OT AL ANNUAL SAFETY SAFEGUARDS TOTAL LLW FEE
Allocation of 10 CFR Part 171 Amount to Safety/Safeguards $13,106,348 $11,372,704 $24,479,052 $397,326 $24,876,379
EFFORT FACTORS
NUMBER OF Safety Safeguards Total LICENSES FEE CATEGORY
$ D 6610+(8
$ E 610/(8
$ D /,0,7('236&HQWUXV
27+(56*DV
$ E FHQWULIXJHHQULFKPHQW
GHPRQVWUDWLRQ
$ F 27+(56KRWFHOO
IDFLOLW\\
( (15,&+0(17
$ 8) +RQH\\ZHOO
727$/
RIWRWDO
ALLOCATION to CATEGORY TOTAL ANNUAL FY 2024 (1) (2) (3) (4) FEE PER Annual Fee Fee Category LICENSE Rounded 1A(1)(a) SSNM (HEU) 2 $6,102,427 $6,310,464 $12,412,890 $201,477 $6,307,184$6,307,000
$ E 610/(8 $2,138,000
$ D /,0,7('236 $1,762,000
3DGXFDK
OTHERS (Gas 1A(2)(b) centrifuge enrichment 0 0 0 0 $0 $0 $0 demonstration) 1A(2)(c) OTHERS (hot cell 0 0 0 0 $0 $0 $0 facility) 1E ENRICHMENT 1 1,109,532 1,594,952 2,704,485 $43,897 $2,748,382$2,748,000
$ 8) +RQH\\ZHOO $1,339,000
&ROV DQG EXGJHWHGDPRXQWV[SHUFHQWRIWRWDOHIIRUWIDFWRU
&RO &RO &RO
&RO /RZ/HYHO:DVWHVXUFKDUJH[SHUFHQWRIWRWDOHIIRUWIDFWRU
&RO &RO &RO &RO QXPEHURIOLFHQVHHV
NRC FUEL CYCLE FACILITIES FY 2024 ANNUAL FEES - EFFORT FACTOR MATRIX
PROCESSES FEE SOLID LIQUID HEU DOWN CONVERSION ROD/ SCRAP/ SENSITIVE CATEGORY LICENSEE DOCKET CATEGORY UF6/METAL ENRICHMENT UF6 BLEND POWDER PELLET BUNDLE WAST E HOT CELL INFORMATION SUBTOTALS TOTAL NOTE S SG S SG S SG S SG S SG S SG S SG S SG S SG S SG S SG Fuel BWXT 70-00027 1A(1)(a) 10 10 0 0 0 0 5 5 5 5 10 5 5 5 10 5 1 1 1 10 47 46 93 Fabrication (SNM-42)
(HEU) NFS 70-00143 1A(1)(a) 10 10 0 0 0 0 10 10 10 10 0 0 0 0 10 5 0 0 1 10 41 45 86 (SNM-124)
Uranium LES 70-03103 1E 5 1 5 10 1 1 0 0 0 0 0 0 0 0 5 1 0 0 0 10 16 23 39 Enrichment (SNM-2010)
Global Nuclear Fuels 70-01113 1A(1)(b) 5 1 1 0 1 1 0 0 5 1 5 1 1 1 5 1 0 0 1 1 24 7 31 Fuel (SNM-1097)
Fabrication Framatome 70-01257 1A(1)(b) 5 1 0 0 1 1 0 0 5 1 5 1 1 1 5 1 0 0 1 1 23 7 30 (LEU) (SNM-1227)
Westinghouse 70-01151 1A(1)(b) 5 1 0 0 1 1 0 0 5 1 5 1 1 1 5 1 0 0 1 1 23 7 30 (SNM-1107)
Honeywell 40-03392 2A(1) 5 1 0 0 5 5 0 0 1 0 0 0 0 0 1 0 0 0 0 1 12 7 19 UF6 (SUB-526)
Conversion International Since International Isotopes is licensed, but did not proceed with Isotopes 40-09086 2A(1) 5 1 0 0 5 5 0 0 1 0 0 0 0 0 1 0 0 0 0 1 - - -construction or operation, it is not assessed an annual fee and is not (SUB-1011) included in annual fee calculations (i.e., subtotals and totals).
NRC authorized Centrus ACP to begin its HALEU demonstration program operations at the Cat II level on September 21, 2023. This Limited Centrus ACP change in operations causes the SG effort factor for "Scrap/Waste" to Operations (SNM-2011) 70-07004 1A(2)(a) 1 1 1 10 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 10 3 22 25increase from 0 to 1 and the SG factor for both "Enrichment" and "Sensitive Information increases" from 5 to 10. Therefore the SG total increased from 11 to 22. The S total remained the same so overall total increased from 14 to 25.
TOTALS 189 164 353 Legend
+,*+
02'(5$7(
/2:
121(
6 6DIHW\\
6* 6DIHJXDUGV
&KDQJHV 5HG +LJKOLJKW
I hereby agree that the operating licenses noted above are in agreement with the operating and billable licenses in the Web-Based Licensing (WBL) system.
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB Division Director, DFM
https://usnrc-my.sharepoint.com/personal/jct1_nrc_gov/Documents/Desktop/DORL/DFM/FY 2024 NMSS proposed changes to Fuel Facilities Effort Factors Matrix Reconciliation of Fuel Facilities Business Line vs. Fuel Facilities Business Line Fee Class (CBJ)
(Dollars in thousands)
Contract $ FTE Product Lines Event Response 90.0 2.0 Generic Homeland Security 2,000.0 3.0 International Activities 0.0 7.5 Licensing 2,823.3 27.9 Oversight 179.0 27.0 Research 0.0 0.0 Rulemaking 25.0 2.0 Mission Support/Supervisors 1.0 15.0 State/Tribal/Federal Programs 0.0 0.0 Training 240.0 1.0 Travel 592.0 0.0
$ 85.45,950.3
FTE rate $231,050 times 77.9 FTEs; $239,360 times 7.5 FTEs (includes Salaries & Benefits only) $ 19,794.0
Total Business Line Budget (BL) 5,950.3$ $ 19,794.0 = 25,744.3$
Fuel Facilities Fee Class (Proposed Fee Rule)
Deductions from BL resources
- HQHULF+RPHODQG6HFXULW\\
,QWHUQDWLRQDO$FWLYLWLHV
/LFHQVLQJ
2YHUVLJKW
0LVVLRQ6XSSRUW 6XSHUYLVRUV
5HVHDUFK
7UDYHO
Increases from Other BL resources
/LFHQVLQJ
2YHUVLJKW
6WDWH 7ULEDO )HGHUDO3URJUDPV
7UDLQLQJ
BL resources w/ fee rule allocations 3,342.3$ 60.3
FTE fully costed rate $482,006 times 60.3 FTEs (includes $ 29,065.0 Salaries, Benefits, indirect resources & agency support )
Total Fee Class Budget 3,342.3$ $ 29,065.0 = 32,407.26$
Variances $ (25.1) 9,271.0(2,608.0)$ 6,663.0$
Notes:
Deductions include: Exclusion Items 1, Indirect resources 2, resources allocated to other fee classes/fee relief categories 3
Increases include: Resources allocated from other Business Lines 4 (i.e., Nuclear Materials and Decommissioning/LLW )
10 CFR Part 171 Annual Fees
Uranium Recovery Facilities
Section III.B.2.d
Table XI Table XII Table XIII Table XIV
The tot al FY 20 24 bu dget ed cost t o be recove red t hrou gh a nnual f ees assess ed to the u raniu m recovery cl ass [which inclu des fe e cate gories 2.A.(2) (a), 2.A.(2) (b), 2.A.(2 )(c), 2.A.(2 )(d ), 2.A.(2 )(e ),
2.A.(3), 2.A.(4), 2.A.(5 ) and 18.B., u nder § 171.16], is appr oximately $325,000 (rou nded ).
Of the r equir ed an nual fe e collections, $27 1, 000 is assessed to DOEs Urani um Mill Tailings Radiation Con trol A ct (U MTRCA ) un der f ee cat egory 18.B. T he re mainin g $54, 3 00 (rou nded )
would be recove red th roug h an nual fe es assesse d to t he ot her licens ees in t his fee class (i.e.,
convention al mills, in-sit u recov ery facilities, 11e. (2) mill tailings disp osal facilities (incident al to existing tailings sit es.)
FY 2024 MISSION DIRECT BUDGETED RESOURCES
URANIUM RECOVERY TOTAL ALLOCATIONS CONTRACT CONTRACT
$,K FTE $,K FTE NUCLEAR REACTOR SAFETY 74,966.5 1,722.50.0 0.0 NUCLEAR MATERIALS & WASTE SAFETY 32,883.3 460.90.0 1.4 CORPORATE 172,391.0 588.00.0 0.0 INSPECTOR GENERAL(no DNSFB) 2,386.0 68.0
SUBTOTAL - FEE BASE RESOURCE 282,626.8 2,839.40.0 1.4
Figures below in $, M (unless otherw ise indicated)
(1) FY 2024 ALLOCATIONS: equals $, K + FTE*FTE rate (show n below ) 0.675
(2) LESS ESTIMATED 10 CFR PART 170 FEE COLLECTIONS 0.352
(3) ALLOCATIONS (equals 1 - 2) 0.323
(4) GENERIC TRANSPORTATION RESOURCES (allocated)
(5) NET 10 CFR PART 171 ALLOCATIONS (after transportation allocated)(equals 3+4) 0.323
(6) FY 2024 TOTAL ALLOCATIONS (after transportation allocation) (equals 2+5) 0.675
(7) % OF BUDGET (% total allocations, excl. fee-relief activities, import/export alloc, small entity ) 0.083%
(8) LLW Surcharge 0.000
(9) LLW Surcharge per licensee
(10) 10 CFR Part 171 billing adjustments 0.002
(11) Adjustments: 0.000
(12) TOTAL FY 2024 ANNUAL FEE (equals 5+8+10+11) 0.325
(13) Number of Licensees
(14) Fee Per License (equals 12/13) GLIIHUHQWIRU
GLIIHUHQWFDWHJRULHV
RIOLFHQVHV VHH
RWKHUZRUNVKHHWV unrounded annual fee amount per license, actual $
rounded annual fee, actual $
FTE FULLY COSTED RATE (average based on budget data, actual $):
6HH'HWHUPLQDWLRQRI+RXUO\\5DWHIRUFDOFXODWLRQV Mission Direct Budgeted Resources for Uranium Recovery Fee Class
FY24 FY23 Difference Contract ($,K) FTE Contract ($,K) FTE Contract ($,K) FTE
mdjW=krCibAo=jAqbAipApqbAcbqv
_rkbpp=ifkljjfppflkfkdkaltAb PRODUCT LINE/PRODUCTS:
Licensing Decommissioning Licensing Actions 0 0.0 0 0.5 0 (0.5)
Uranium Recovery Lic. Actions 0 1.1 0 0.3 0 0.8 Oversight Inspection 0 0.3 0 0.2 0 0.1 Total Direct Resources 0 1.4 0 1.0 0 0.4
Grand Total Nuclear Materials & Waste Safety 0 1.4 0 1.0 0 0.4
TOTAL URANIUM RECOVERY 0 1.4 0 1.0 0 0.4
Total value of budgeted resources for fee class(mission direct FTE x full cost of FTE + mission direct contract $) $675 $465 $210
01/28/2024 Page 10 of 16 URANIUM RECOVERY ANNUAL FEES FY 2024
TOTAL TOTAL ANNUAL FEE AMOUNT : $324,889 TOTAL ADJUSTMENT: 0 TOTAL: $324,889
GROUP 1 Calculation of DOE Annual Fee
Fee Less: Part 170 Total Category contract $ FTE FTE Rate Receipts Fee 18.B. $0 0.90 $482,006 -$169,200 $264,606'2(8075&$%XGJHWHG&RVWV
[7RWDO$QQXDO)HH$PRXQWOHVV $6,028
8075&$
Total: $270,634 DOE's Annual Fee Rounded: $271,000
GROUP 2 Calculation of Annual Fee Amount for Remaining UR Licensees
FY 2023 Total Fee Remaining Annual Fee Amount: $54,255
Total: $54,255
CALCULATION OF ANNUAL FEE AMOUNTS BY CATEGORY:
(1) (2) (3) (4) (5) (6) (7) (8)
FY 2024 Fee Number of Category Total Benefit Total base Annual FeeAnnual Fee Per License Type of Site Category Licenses Benefit Value Percent annual fee Base Adjustments Total Rounded
&RQYHQWLRQDO +HDS/HDFK0LOOV $ D $0
%DVLF,Q VLWX5HFRYHU\\)DFLOLWLHV 2.A.(2)(b) 1 190 190 100% $54,255 $54,255 $0 $54,255 $54,300
([SDQGHG,Q VLWX5HFRYHU\\)DFLOLWLHV 2.A.(2)(c) 0 - - 0% $0 $0 $0 $0 $0
,Q VLWX5HFRYHU\\5HVLQ)DFLOLWLHV 2.A.(2)(d) 0 - - 0% $0 N/A N/A N/A N/A
5HVLQ7ROO0LOOLQJ)DFLOLWLHV 2.A.(2)(e) 0 - - 0% $0 N/A N/A N/A N/A
)DFLOLWLHVIRU'LVSRVDORI H 0DWHULDOV2.A.(3) 0 - - 0% $0 N/A N/A N/A N/A
'LVSRVDO,QFLGHQWWR2SHUDWLRQDW/LFHQVHG)DFLOLWLHV2.A.(4) 0 - - 0% $0 $0 $0 $0 $0
8UDQLXP: DWHU7UHDWPHQW)DFLOLW\\ 2.A.(5) 0 - - 0% $0 $0 $0 $0 $0
TOTAL 1 190 190 100% $54,255
Col. 3= Col. 1 x Col. 2 Col. 5= &RO [*URXS 7RWDO%DVH)HH Col. 6= Col. 5 /Col. 1 Col. 7= &RO [*URXS $GMXVWPHQW$PRXQW &RO
Col. 8= Col. 6 + Col. 7
Reconciliation of Decommissioning & Low Decommissioning & LLW Level Waste Business Line vs. Fee Class Business Line (CBJ)
(Dollars in thousands)
Contract $ FTE Product Lines Event Response 0.0 0.0 Generic Homeland Security 0.0 0.0 International Activities 75.0 2.0 Licensing 3,568.0 41.9 Oversight 262.0 24.8 Research 413.0 0.7 Rulemaking 88.0 4.2 Mission Support/Supervisors 1.0 16.0 State/Tribal/Federal Programs 0.0 0.0 Training 432.0 2.0 Travel 716.0 0.0
$ 91.65,555.0
FTE rate $232,570 times 87.6 FTEs; $253,920 times 4 $ 21,388.8 FTEs (includes Salaries & Benefits only)
Total Business Line Budget (BL) 5,555.0$ $ 21,388.8 = 26,943.8$
Uranium Recovery Fee Class (Proposed Fee Rule)
Deductions from BL resources
(YHQW5HVSRQVH
- HQHULF+RPHODQG6HFXULW\\
,QWHUQDWLRQDO$FWLYLWLHV
/LFHQVLQJ
2YHUVLJKW
0LVVLRQ6XSSRUW 6XSHUYLVRUV
5HVHDUFK
5XOHPDNLQJ
6WDWH 7ULEDO )HGHUDO3URJUDPV
7UDLQLQJ
7UDYHO
Increases from Other resources
,QWHUQDWLRQDO$FWLYLWLHV
6WDWH 7ULEDO )HGHUDO3URJUDPV
2YHUVLJKW
7UDLQLQJ
BL resources w/ fee rule allocations $ 1.4-
FTE fully costed rate $482,006 times 1.4 FTE (includes $ 674.8 Salaries, Benefits, indirect resources & agency support)
Total Fee Class Budget -$ $ 674.8 = 674.81$
Variances $ (90.2) (20,714.0)(5,555.0)$ (26,269.0)$
Notes:
Deductions include: Exclusion Items 1, Indirect resources 2, resources allocated to other fee classes/fee-relief categories 3 and Appropriation changes 5
Increases include: Resources allocated from other Business Lines 4 (i.e., Nuclear Materials and Decommissioning/LLW )
10 CFR Part 171 A nnua l Fe e s
Non-Power Production or Utilization Facilities
Section III.B.2.e
Table XV
A pproximat ely $2 93,000 in bud geted c osts is to be r ecover ed th roug h ann ual fees assessed to th e non-p ower p roducti on or utilization facilities (NP UF) cl ass of licens es for FY 202 4. T his req uired annual f ee rec overy amou nt is divide d equ ally amo ng the thre e NPUF license es subject to an nual fees, an d results in a FY 2024 annu al fee of $97,7 00 f or e ach license e.
FY 2024 MISSION DIRECT BUDGETED RESOURCES NON POWER PRODUCTION OR UTILIZATION FACILITIES TOTAL ALLOCATIONS CONTRACT CONTRACT
$,K FTE $,K FTE NUCLEAR REACTOR SAFETY 74,966.5 1,722.5393.0 9.3 NUCLEAR MATERIALS & WASTE SAFETY 32,883.3 460.90.5 0.0 CORPORATE 172,391.0 588.00.0 0.0 INSPECTOR GENERAL(no DNSFB) 2,386.0 68.0
SUBTOTAL - FEE BASE RESOURCE 282,626.8 2,839.4393.5 9.3
Figures below in $, M (unless otherw ise indicated)
(1) FY 2024 ALLOCATIONS: equals $, K + FTE*FTE rate (show n below ) 4.876
(2) LESS ESTIMATED 10 CFR PART 170 FEE COLLECTIONS 4.648
(3) ALLOCATIONS (equals 1 - 2) 0.228
(4) GENERIC TRANSPORTATION RESOURCES (allocated) 0.050
(5) NET 10 CFR PART 171 ALLOCATIONS (after transportation allocated)(equals 3+4) 0.278
(6) FY 2024 TOTAL ALLOCATIONS (after transportation allocation) (equals 2+5) 4.926
(7) % OF BUDGET (% total allocations, excl. fee-relief activities, import/export alloc, small entity ) 0.607%
(8) LLW Surcharge 0.000
(9) LLW Surcharge per licensee
(10) 10 CFR Part 171 billing adjustments 0.015
(11) Adjustments: 0.000
(12) TOTAL FY 2024 ANNUAL FEE (equals 5+8+10+11) 0.2930
(13) Number of Licensees 3
(14) Fee Per License (equals 12/13) 0.098
unrounded annual fee amount per license, actual $ 97,659
rounded annual fee, actual $ 97,700
FTE FULLY COSTED RATE (average based on budget data, actual $):
6HH'HWHUPLQDWLRQRI+RXUO\\5DWHIRUFDOFXODWLRQV Mission Direct Budgeted Resources for Non-Power Production or Utilization Facilities Fee Class
FY24 FY23 Difference
Contract ($,K) FTE Contract ($,K) FTE Contract ($,K) FTE
PROGRAM: NUCLEAR REACTOR SAFETY BUSINESS LINE: OPERATING REACTORS PRODUCT LINE/PRODUCTS:
Licensing Research & Test Reactors 380.0 7.6 170.0 8.6 210.0 (1.0)
Oversight Enforcement 0.0 0.0 0.0 0.5 0.0 (0.5)
Inspection 0.0 1.7 0.0 1.5 0.0 0.2 Rulemaking Rulemaking (PL) 0.0 0.0 0.0 0.0 0.0 0.0 Training Mission Training 13.0 0.0 16.0 0.0 (3.0) 0.0 Total Direct Resources 393.0 9.3 186.0 10.6 207.0 (1.3)
Grand Total Nuclear Reactor Safety 393.0 9.3 186.0 10.6 207.0 (1.3)
PROGRAM: NUCLEAR MATERIALS AND WASTE SAFETY BUSINESS LINE: NUCLEAR MATERIALS USERS PRODUCT LINE/PRODUCTS:
Oversight Inspection 0.5 0.0 1.0 0.0 (0.5) 0.0 Total Direct Resources 0.5 0.0 1.0 0.0 (0.5) 0.0
Grand Total Nuclear Materials & Waste Safety 0.5 0.0 1.0 0.0 (0.5) 0.0
TOTAL NON POWER PRODUCTION OR UTILIZATION FACILITY 393.5 9.3 187.0 10.6 206.5 (1.3)
Total value of budgeted resources for fee class (mission direct FTE x full cost of FTE +
mission direct contract $) $4,876.2 $5,115.2 $(239.0)
01/28/2024 Page 5 of 16 NON-POWER PRODUCTION OR UTILIZATION FACILITIES (NPUF)
ANNUAL FEE FY 2024
DETERMINATION OF THE FY 2024 ANNUAL FEE:
NON POWER PRODUCTION OR UTILIZATION FACILITIES SUBJECT TO ANNUAL FEES (See note)
License No. Docket No.
- 1. Dow Chemical - TRIGA MARK I R-108 50-264
- 2. GE, NTR R-33 50-73
- 3. NIST TR-5 50-184
DETERMINATION OF ANNUAL FEE
BUDGETED COSTS $292,976
ANNUAL FEE PER LICENSE (rounded) $97,700 (Budgeted costs divided by number of NPUF licensees subject to annual fee)
NOTE: Does not include License R-38 (TRIGA MARK I), Docket No. 50-89, issued to General Atomics. License R-38 was amended in 1997 to authorize possession only.
02/05/2024 Reconciliation of Operating Reactor Business Line Operating Reactor Business vs. Fee Class Line (CBJ)
(Dollars in thousands)
Contract $ FTE Product Lines Event Response 6,603.0 49.0 Generic Homeland Security 0.0 7.0 International Activities 125.0 23.6 Licensing 11,463.0 375.1 Oversight 19,791.0 491.0 Rulemaking 510.0 32.2 Research 9,954.0 124.0 Mission Support/Supervisors 2,224.5 324.0 State/Tribal/Federal Programs 0.0 0.0 Training 4,781.0 45.0 Travel 9,757.0 0.0
$ 1,470.965,208.5
FTE rate $226,900 times 1447.3 FTEs; FTE rate $239,400 times 23.6 FTE (includes Salaries & Benefits only ) $ 334,041.0
Total Business Line Budget (BL) 65,208.5$ $ 334,041.0 = 399,249.5$
Non-Power Production or Utilization Facilities Fee Class (Proposed Fee Rule)
Deductions from BL resources
(YHQW5HVSRQVH
- HQHULF+RPHODQG6HFXULW\\
,QWHUQDWLRQDO$FWLYLWLHV
/LFHQVLQJ
2YHUVLJKW
5HVHDUFK
5XOHPDNLQJ
0LVVLRQ6XSSRUW 6XSHUYLVRUV
7UDLQLQJ
7UDYHO
Increases from Other resources
2YHUVLJKW
5XOHPDNLQJ
6WDWH 7ULEDO )HGHUDO3URJUDPV
7UDLQLQJ
BL resources w/ fee rule allocations 393.5$ 9.3
FTE fully costed rate $482,006 times 9.3 FTEs (includes Salaries, Benefits, indirect resources & agency support) $ 4,482.7
Total Fee Class Budget 393.5$ $ 4,482.7 = 4,876.16$
Variances $ (1,462) (329,558.4)(64,815.0)$ (394,373.4)$
Notes:
Deductions include: Exclusion Items 1, Indirect resources 2, resources allocated to other fee classes/fee-relief categories 3
Increases include: Resources allocated from other Business Lines 4 (i.e.,
Nuclear Materials and Decommissioning/LLW )
10 CFR P art 171 Annual Fees
Rare Earth Facilities
Section III.B.2.f
During FY 2021 NRC did receive an a pplication unde r the R are E ar th fe e class 2.A. (2)(f ).
However, o nly 10 CFR P a rt 17 0 FY 20 24 bu dgeta ry res ourc es were allocated to this fee class and did not r equir e an annu al fee t o be es tablishe d.
NRC revised the fee ca tego ry for this fee class fro m 2.A.( 2)(c ) to 2.A. (2)( f) in FY 2009.
NRC eliminated f ee cate gory 2.A.(5) U raniu m Water Tr eatme nt F acility effective wit h the FY 2019 Fee Rule.
FY 2024 MISSION DIRECT BUDGETED RESOURCES
RARE EARTH TOTAL ALLOCATIONS CONTRACT CONTRACT
$,K FTE $,K FTE NUCLEAR REACTOR SAFETY 74,966.5 1,722.50.0 0.0 NUCLEAR MATERIALS & WASTE SAFETY 32,883.3 460.90.0 0.4 CORPORATE 172,391.0 588.00.0 0.0 INSPECTOR GENERAL(no DNSFB) 2,386.0 68.0
SUBTOTAL - FEE BASE RESOURCE 282,626.8 2,839.40.0 0.4
Figures below in $, M (unless otherw ise indicated)
(1) FY 2024 ALLOCATIONS: equals $, K + FTE*FTE rate (show n below ) 0.19
(2) LESS ESTIMATED 10 CFR PART 170 FEE COLLECTIONS 0.19
(3) ALLOCATIONS (equals 1 - 2) 0.00
(4) GENERIC TRANSPORTATION RESOURCES (allocated)
(5) NET 10 CFR PART 171 ALLOCATIONS (after transportation allocated)(equals 3+4) 0.00
(6) FY 2024 TOTAL ALLOCATIONS (after transportation allocation) (equals 2+5) 0.19
(7) % OF BUDGET (% total allocations, excl. fee-relief activities, import/export alloc, small entity ) 0.00%
(8) LLW Surcharge 0.00
(9) LLW Surcharge per licensee
(10) 10 CFR Part 171 billing adjustments 0.00
(11) Adjustments: 0.00
(12) TOTAL FY 2024 ANNUAL FEE (equals 5+8+10+11) 0.00
(13) Number of Licensees
(14) Fee Per License (equals 12/13) different for different categories of licenses; see other worksheets
unrounded annual fee amount per license, actual $
rounded annual fee, actual $
FTE FULLY COSTED RATE (average based on budget data, actual $):
6HH'HWHUPLQDWLRQRI+RXUO\\5DWHIRUFDOFXODWLRQV Mission Direct Resources For Rare Earth Fee Class
FY24 FY23 Difference Contract ($,K) FTE Contract ($,K) FTE Contract ($,K) FTE
PROGRAM: NUCLEAR MATERIALS AND WASTE SAFETY BUSINESS LINE: DECOMMISSIONING AND LOW LEVEL WASTE PRODUCT LINE/PRODUCTS:
Licensing Decommissioning Licensing Actions 0 0.4 0 0.6 0 (0.2)
Uranium Recovery Envir. Reviews 0 0.0 0 0.0 0 0.0 Uranium Recovery Lic. Actions 0 0.0 0 0.0 0 0.0 Mission Training Training 0 0.0 0 0.0 0 0.0 Total Direct Resources 0 0.4 0 0.6 0 (0.2)
Grand Total Nuclear Materials & Waste Safety 0 0.4 0 0.6 0 (0.2)
TOTAL Rare Earth 0 0.4 0 0.6 0 (0.2)
Total value of budgeted resources for fee class(mission direct FTE x full cost of FTE + mission direct contract $) $193 $279 ($86)
01/28/2024 9 10 CFR P art 171 Annual Fees
Materials Users
Section III.B.2.g
Table XVI
The followin g fee c atego ries u nder §171. 16 a re includ ed in t his fee class : 1.C., 1.D., 1. F., 2.B.,
2.F., 3.A. t hro ugh 3.S., 4.A. thr ough 4.C., 5.A., 5.B., 6.A., 7.A. t hrou gh 7.C., 8.A., 9.A. t hrou gh 9.D.,
16, and 17. The a nnual fee fo r thes e cate gories of ma terials us ers licens es is devel oped as follows:
A nnual fee = Co nstant x [A pplication Fee + (A verag e Insp ection Cost/ Inspec tion P riority)] + Ins pection Multiplier x (A vera ge Ins pection C ost / Ins pection P rio rity) +
Unique Cate gory Costs.
To equit ably an d fairly allocate t he $4 6.2 million in FY 2024 b udget ed costs to be recov ered i n annual f ees assess ed to t he a pproxi mately 2, 400 diverse mate rials users licensees, the NRC continues t o calculat e the annu al fees f or e ach fee categ ory within this class bas ed o n the 10 C FR Part 170 a pplication fees a nd esti mated i nspectio n costs fo r eac h fee c atego ry. B ecaus e the applica tion fe es and inspectio n costs a re indic ative of t he co mplexity of the materi al license, this appr oach p rovides a pr oxy for allocating the gene ric and other reg ulatory costs to the div erse fee cate gories. This fe e calculati on me thod also consid ers th e inspecti on fr eque ncy (p riority),
which is indicative o f the s afety risk and resulting reg ulatory costs associ ated with the ca tego ries of licenses.
FY 2024 MISSION DIRECT BUDGETED RESOURCES
M ATERIALS TOTAL ALLOCATIONS CONTRACT CONTRACT
$,K FTE $,K FTE NUCLEAR REACTOR SAFETY 74,966.5 1,722.50.0 0.00 NUCLEAR MATERIALS & WASTE SAFETY 32,883.3 460.92,273.0 87.20 CORPORATE 172,391.0 588.00.0 0.00 INSPECTOR GENERAL(no DNSFB) 2,386.0 68.0
SUBTOTAL - FEE BASE RESOURCE 282,626.8 2,839.42,273.0 87.20
Figures below in $, M (unless otherw ise indicated)
(1) FY 2024 ALLOCATIONS: equals $, K + FTE*FTE rate (show n below ) 44.30
(2) LESS ESTIMATED 10 CFR PART 170 FEE COLLECTIONS 0.83
(3) ALLOCATIONS (equals 1 - 2) 43.47
(4) GENERIC TRANSPORTATION RESOURCES (allocated) 2.46
(5) NET 10 CFR PART 171 ALLOCATIONS (after transportation allocated)(equals 3+4) 45.94
(6) FY 2024 TOTAL ALLOCATIONS (after transportation allocation) (equals 2+5) 46.77
(7) % OF BUDGET (% total allocations, excl. fee-relief activities, import/export alloc, small entity ) 4.48%
(8) LLW Surcharge 0.10
(9) LLW Surcharge per licensee
(10) 10 CFR Part 171 billing adjustments 0.11
(11) Adjustments: 0.00
(12) TOTAL FY 2024 ANNUAL FEE (equals 5+8+10+11) 46.152
(13) Number of Licensees
(14) Fee Per License (equals 12/13) GLIIHUHQWIRU
GLIIHUHQW
FDWHJRULHVRI
OLFHQVHV VHH
RWKHUZRUNVKHHWV unrounded annual fee amount per license, actual $
rounded annual fee, actual $
FTE FULLY COSTED RATE (average based on budget data, actual $):
6HH'HWHUPLQDWLRQRI+RXUO\\5DWHIRUFDOFXODWLRQV Mission Direct Budgeted Resources for Materials Fee Class
FY24 FY23 Difference Contract ($,K) FTE Contract ($,K) FTE Contract ($,K) FTE
mdjW=bAAlpAcbqv
_rpfpp=ifW=lmbqf=Al PRODUCT LINE/PRODUCTS:
Training Mission IT 0 0.0 2 0.0 (2) 0.0 Mission Training 0 0.0 0 0.0 0 0.0 Total Direct Resources 0 0.0 2 0.0 (2) 0.0
=drand=qot=kuoopy 0 0.0 2 0.0 (2) 0.0
moldoAjW=krCAo=jAofA=Aka=p=pA
_rpfkbpp=kbW=abCljjfppflkfkd=Lsbp PRODUCT LINE/PRODUCTS:
Licensing IT Infrastructure 9 0.0 0 0.0 9 0.0 Total Direct Resources 9 0.0 0 0.0 9 0.0
PROGRAM: NUCLEAR MATERIALS AND WASTE SAFETY BUSINESS LINE: NUCLEAR MATERIALS USERS PRODUCT LINE/PRODUCTS:
Event Response Response Operations 0 0.3 0 0.3 0 0.0 Response Programs 0 0.4 0 0.3 0 0.1 cei EDO Operations 0 1.5 0 1.5 0 0.0 Licensing Actions 7 34.8 7 30.0 0 4.8 Licensing Support 45 1.5 45 1.0 0 0.5 Mission IT 101 0.0 74 0.0 27 0.0 Policy Outreach 0 0.5 0 1.0 0 (0.5)
Security 0 0.5 0 0.5 0 0.0 lversight Allegations & Investigations 0.0 9.9 0 8.6 0 1.3 Enforcement 24.0 11.0 44 11.3 (20) (0.3)
Event Evaluation 184.0 2.0 170 2.0 14 0.0 Inspection 1.0 20.7 1 20.0 0 0.7 IT Infrastructure 594.0 0.0 100 0.0 494 0.0 Mission IT 0.0 0.0 0 0.0 0 0.0 Security IT 76.0 0.0 0 0.0 76 0.0 oesearch 0 0.0 Materials Research 340 0.0 0 0.0 340 0.0 oulemaking Mission IT 297 0.0 289 0.0 8 0.0 Rulemaking 0 2.4 0 2.3 0 0.1 Rulemaking Support 30 0.2 15 0.2 15 0.0 ai Entry Level Hiring 0 1.0 0 1.0 0 0.0 Mission IT 22 0.0 1 0.0 21 0.0 Mission Training 529 0.5 540 0.5 (11) 0.0 Organizational Development 14 0.0 14 0.0 0 0.0 Total Direct Resources 2,264.0 87.2 1,300.0 80.5 964 6.7
=drand=qot=kujeriC=tastpy 2,273.0 87.2 1,302 80.5 971 6.7
jAofArpbop 2,273.0 87.2 1,302 80.5 971 6.7
Total value of budgeted resources for fee class(mission direct FTE x full cost of FTE +
mission direct contract $) $44,304 $38,729 $5,575
01/28/2024 Page 7 of 16 01/22/2024 FY 2024 Materials Users Annual Fees REBASELINE NUMBER OF LICENSES FY 2024
FY 2024 Less Annual Fee Billed at Billed at Agree. Part 170 Fees($) Calc. of Calc. 10 CFR Part 171 Base Fee Per License ($) Total Exact Total Collections Number of Small (Rounded)
FY 2023 FY 2024 State Total For Insp. General of Insp. Total Annual Real EntityAdjustment per License Transfer Base Fee LLW Fee per License Fee Category FeeAdjustFY 2023 Appl. Insp. Prior. Multiple Multiple General Unique Inspection per license Surcharge Fee-Relief license Base Fee TOTAL Sm Entity Sm Entity Subsidy
($,K) ($,K) l licenses x licenses x Annual fee below for multiplier*(i Materials multiplier x (Total Base Total Base annual fee and (Appl fee + insp multiplier*(Appl Calculati nsp fee/insp (General+u LLW (appl fee+insp Fee+ LLW Fee + LLW small entity fee x fee + insp insp fee/insp fee/insp on of priority) See nique+Insp Surcharge/ fee/insp Surcharge + Surcharge + no. of small fee/insp priority) priority) See Unique below for ection) no. of priority)See Fee-Relief) Fee-Relief) entities 5200 1000 SPECIAL NUCLEAR MATERIAL: l l
1C. Industrial Gauges 0 5 0 5.0 1,500 2,500 5 10000 2500 2518 861 3,379 0 3,379 17 17 0 0 - l3,400
' 2WKHU610OHVVFULWLFDOTXDQWLW\\ _ 9,600
) 2WKHU610JUHDWHUWKDQFULWLFDOTXDQWLW\\ _ 5,900
_
SOURCE MATERIAL: _
_
% 6KLHOGLQJ _3,700
& ([HPSW'LVWULEXWLRQ 60 _ 14,100
' 'LVWULEXWLRQWR*HQHUDO/LFHQVH 60 _ 7,000
( 0DQXIDFWXULQJ'LVWULEXWLRQ _ 8,900
) 2WKHU6RXUFH0DWHULDOV _ 11,800
_
BYPRODUCT MATERIAL: _
_
$ 0DQXIDFWXULQJ %URDG/RFDWLRQV _37,900
$ 0DQXIDFWXULQJ %URDGVLWHV _ 50,400
$ 0DQXIDFWXULQJ %URDGVLWHV RUPRUH _ 63,000
% 0DQXIDFWXULQJ 2WKHU _ 12,900
% 0DQXIDFWXULQJ 2WKHUVLWHV _ 17,100
% 0DQXIDFWXULQJ 2WKHUVLWHV RUPRUH _ 21,300
& 5DGLRSKDUPDFHXWLFDOV 0DQXI 3URFHVV _ 12,900
& 5DGLRSKDUPDFHXWLFDOV 0DQXI 3URFHVVVLWHV _ 17,100
& 5DGLRSKDUPDFHXWLFDOV 0DQXI 3URFHVVVLWHV RUPRUH _ 23,500
' 5DGLRSKDUPDFHXWLFDOV 1R0DQXI 3URFHVV _ 0
( ,UUDGLDWRUV 6HOI 6KLHOG _ 12,200
) ,UUDGLDWRUV &L _ 12,400
- ,UUDGLDWRUV ! &L _ 105,300
+ ([HPSW'LVWULEXWLRQ 'HYLFH5HYLHZ _ 12,900
, ([HPSW'LVWULEXWLRQ 1R'HYLFH5HYLHZ _ 19,000
- *HQ /LFHQVH 'HYLFH5HYLHZ _ 4,900
. *HQ /LFHQVH 1R'HYLFH5HYLHZ _ 3,600
/ 5 ' %URDG _ 17,600
/D 5 ' %URDG VLWHV _ 23,300
/E 5 ' %URDG RUPRUHVLWHV _ 29,100
0 5 ' 2WKHU _ 18,400
1 6HUYLFH/LFHQVH _ 20,200
2 5DGLRJUDSK\\ _ 43,900
2 5DGLRJUDSK\\VLWHV _ 58,300
2 5DGLRJUDSK\\VLWHV RUPRUH _ 73,100
3 $OO2WKHU%\\SURGXFW0DWHULDOV _ 14,500
3 $OO2WKHU%\\SURGXFW0DWHULDOVVLWHV _ 19,500
3 $OO2WKHU%\\SURGXFW0DWHULDOVVLWHV RUPRUH _ 24,300
5 5DGLXP OHVVWKDQRUHTXDOWR [OLPLWVLQ _ 8,400
5 5DGLXP PRUHWKDQ [OLPLWVLQ _ 8,800
6 $FFHOHUDWRU3URGXFHG5DGLRQXFOLGHV _ 35,100
_
WASTE DISPOSAL AND PROCESSING: _
_
$ : DVWH'LVSRVDO _27,200
% : DVWH5HFHLSW 3DFNDJLQJ _ 20,300
& : DVWH5HFHLSW 3UHSDFNDJHG _ 12,100
_
WELL LOGGING: l l
5A. W ell Logging 16 18 0 18.0 5,300 9,700 3 153600 58200 10742 5571 16,312 0 16,312 294 294 6 0 66,600 l16,300
% )LHOG)ORRGLQJ7UDFHUV6WXGLHV _
_
NUCLEAR LAUNDRY: l l
6A. Nuclear Laundry 0 0 0 0.0 3 0 0 0 0 0 0 0 0 0 0 0 - l l
HUMAN USE OF BYPRODUCT, SOURCE, OR SNM: l l
7A. Teletherapy 2 2 0 2.0 12,900 28,700 4 40150 14350 25270 0 12362 37,632 0 37,632 75 75 0 0 - l37,600
$ 7HOHWKHUDS\\VLWHV _ 50,100
$ 7HOHWKHUDS\\VLWHV RUPRUH _ 62,500
% 0HGLFDO %URDG _ 53,100
% 0HGLFDO %URDGVLWHV _ 70,700
% 0HGLFDO %URDGVLWHV RUPRUH _ 88,200
& 0HGLFDO2WKHU _ 21,400
& 0HGLFDO2WKHUVLWHV _ 28,500
& 0HGLFDO2WKHUVLWHV RUPRUH _ 36,600
_
RI
01/22/2024 FY 2024 Materials Users Annual Fees REBASELINE CIVIL DEFENSE: l l
8A. Civil Defense 12 12 0 12.0 3,000 7,800 5 54720 18720 5740 2688 8,428 0 8,428 101 101 1 0 3,200 l8,400
_
_
DEVICE, PRODUCT, OR SEALED SOURCE SAFETY EVALUATION: l l
9A. Device/Product Safety Evaluation - Broad 107 107 0 107.0 23,500 5 2514500 0 29582 0 29,582 0 29,582 3165 3165 30 30 1,590,000 l29,600
% 'HYLFH 3URGXFW6DIHW\\(YDOXDWLRQ 2WKHU _ 13,100
& 6HDOHG6RXUFHV6DIHW\\(YDOXDWLRQ %URDG _ 7,700
' 6HDOHG6RXUFHV6DIHW\\(YDOXDWLRQ 2WKHU _ 1,500
OTHER LICENSES: l l
- 17. Master Material License 3 3 0 3.0 181,600 153,100 2 774450 229650 324957 0 131889 456,846 255 0 457101 1371 1371 0 0 l457,000
TOTAL 2417.0 2373.0 0.0 2373.0 28922718 5595818 1921263 46049 46152 487 202 10,418,700 Mat 0 0 Uranium recovery 2A2b
Total Small Entity Subsidy 487 202 10,418,700
FTE RATE: $482,006 Total 689
% of total Materials Users licensees 29.03%
Calculation of UNIQUE (generic activities related to specific fee categories): UNIQUE ACTIVITES IDENTIFIED FOR FY 2024 Total budgeted resources (FY 2024 unique activities=Part 35 Implementation) 0.0 (FTE) $0.00 (CONTRACT COSTS)
Total cost (FTExFTE rate + any contract costs) $0 Percent of NRC materials licenses to the total materials licenses 12%
Amount allocated to NRC materials licensees (% x total cost) $0 No. of affected NRC licenses (for FY 2024, Cats. 7A, 7B, & 7C, + those medical under Master Matls Licenses) 807.0 Unique per license: $0
Total Part 171 (annual fee) amount, excluding fee-relief costs): $46,048,808 FTE FTE Rate Total Inspection Amount (budgeted costs for materials inspections): 20.0 x $482,006 = $9,640,129 = $9,641,129
LLW Surcharge Amount (see FEE-RELIFE ACTIVITIES Sheet for further details):
7RWDO//: VXUFKDUJHWREHUHFRYHUHG
3HUFHQWDJHWREHUHFRYHUHGIURPPDWHULDOVOLFHQVHHV
$PRXQWWREHUHFRYHUHGIURPPDWHULDOVOLFHQVHHV
1R RIDIIHFWHGOLFHQVHV
LLW Surcharge per license: $255
Other Fee-Relief Amount (see FEE-RELIEF ACTIVITIES Sheet for further details):
7RWDORWKHUIHH UHOLHIWREHUHFRYHUHG
3HUFHQWDJHWREHUHFRYHUHGIURPPDWHULDOVOLFHQVHHV
$PRXQWWREHUHFRYHUHGIURPPDWHULDOVOLFHQVHHV
. . . .
TOTAL GENERAL = TOTAL Part 171 amount less INSPECTION less UNIQUE: 46,049 - 9,641 - 0 = 36,408
ANNUAL FEE MULTIPLIER = TOTAL GENERAL /Total of Calc of Gen. Multiple col.: 36,408 / 28,923 = 1.26
INSPECTION MULTIPLIER=INSPECTION AMOUNT/Total Calc of Insp. Multiple col.: $9,641,129 / 5,596 = 1.72
FEE-RELIEF MULTIPLIER=Fee-Relief amount to be adjusted for materials licensees/total of Calc of Gen. Multiple col.): $0 / 28,923 = 0.0000
COL (5) = COL (1) * [COL (2) + COL (3)/COL (4)]
COL (6) = COL(1) * (COL (3)/COL (4))
COL (7) = GENERAL MULTIPLIER * [COL(2) + COL (3)/COL (4)]
COL (8) = (UNIQUE COSTS) / (NO. OF APPLICABLE LICENSES)
COL (9) = INSPECTION MULTIPLIER*(COL3/COL4)
COL (10) = COL (7) + COL(8)+COL(9)
COL (11) = LLW SURCHARGE =% Allocated
- LLW Costs/# affected licenses
COL (12)=FEE-RELIEF MULTIPLIER*(COL(2)+(COL(3)/COL(4))
COL (13) = COL (10) + COL(11)+COL(12)
COL (14) = [COL (1)
- COL (13)] /1000
2 of 2 Reconciliation of Nuclear Materials Users Business Nuclear Material Users Line vs. Fee Class Business Line (CBJ)
(Dollars in thousands)
Contract $ FTE Product Lines Event Response 0.0 3.0 Generic Homeland Security 7,864.0 13.0 International Activities 10,163.0 12.0 Licensing 806.0 47.2 Oversight 2,351.0 50.3 Research 340.0 2.0 Rulemaking 422.0 5.9 Mission Support/Supervisors 165.0 40.0 State/Tribal/Federal Programs 270.0 26.0 Training 1,305.0 4.0 Travel 1,972.0 0.0
$ 25,658.0 203.4
FTE rate $224,070 times 191.4 FTEs; $239,400 times 12 $ 45,759.2 FTEs (includes Salaries & Benefits only )
Total Business Line Budget (BL) 25,658.0$ $ 45,759.2 = 71,417.2$
Nuclear Material Users Fee Class (Proposed Fee Rule)
Deductions from BL resources
(YHQW5HVSRQVH
- HQHULF+RPHODQG6HFXULW\\
,QWHUQDWLRQDO$FWLYLWLHV
/LFHQVLQJ
2YHUVLJKW
0LVVLRQ6XSSRUW 6XSHUYLVRUV
5HVHDUFK
5XOHPDNLQJ
6WDWH 7ULEDO )HGHUDO3URJUDPV
7UDLQLQJ
7UDYHO
Increases from Other BL resources
6WDWH 7ULEDO )HGHUDO3URJUDPV
/LFHQVLQJ
BL resources w/ fee rule allocations $ 87.22,273.0
FTE fully costed rate $482,006 times 87.2 FTEs (includes $ 42,030.9 Salaries, Benefits, indirect resources& agency support )
Total Fee Class Budget 2,273.0$ $ 42,030.9 = 44,303.92$
Variances $ (116.2) (3,728.3)(23,385.0)$ (27,113.3)$
Notes:
Deductions include: Exclusion Items 1, Indirect resources 2, resources allocated to other fee
classes/fee relief categories 3 and Appropriation changes 5
Increases include: resources allocated from other Business Lines 4 (i.e. Nuclear Materials and Decommissioning/LLW )
ANNUAL FEE CALCULATION FOR AGREEMENT STATE USE ONLY FY 2024 Annual Fee Part 170 Fees($) Calc. of Calc. Total Exact (Rounded) Part 171 Base Fee Per License ($)
Insp. General of Insp. Total Annual Adjustment per License
Base Fee per LLW Fee per License Fee Category Appl. Insp. Prior. Multiple Multiple General InspectionlicenseSurcharge Fee-Relief Total license 12/11/23
(Fee-Relief (Total multiplier x (No. of Materials (appl fee+insp licenses x (No. of LLW fee/insp (Appl fee + licenses x Annual fee Inspection Surcharge/ priority)See (Total Base insp insp multiplier*(Appl fee multiplier*(insp no. of below for Fee+ LLW
+ insp fee/insp fee/insp fee/insp fee/insp priority) annual fee priority)insp. (General+ affected calculation of Surcharge +
priority) priority) multiplier of 1.26 multiplier of 1.72 Inspection) licenses) fee-relief multi.) Fee-Relief)
NUCLEAR LAUNDRY:
6A. Nuclear Laundry 23,900 6,500 3 27,933 2,333 35,128 4,018 39,146 254 0 39,400 39,400$39,400 10 CFR Part 171 Annual Fees
Transportation
Section III.B.2.h
Table XVII Table XVIII
Consistent with t he policy establishe d in th e NRCs FY 2006 final fe e rule, the NRC will rec over generic t ransp ortati on costs unrel ated t o DOE as pa rt of existing an nual f ees fo r license f ee classes. NRC will continue t o assess a sepa rate annu al fee unde r §17 1.16, fee cat ego ry 18.A., f or DOE transpor tation activities.
The r esourc es associat ed with g ene ric trans port ation ac tivities are distribu ted to the lice nse fee classes based on th e nu mber of Cer tificates of Complia nce (CoCs ) ben efiting (used by) th at fee class, as a p roxy fo r the gene ric tra nspor tation resou rces ex pende d for each fee class. The amount of th e gen eric res ourc es allocate d is calculat ed by multiplying t he p ercent age o f total C oCs used by e ach fe e class (a nd DOE ) by the t otal ge neric t ransp ortatio n res ources to be recov ered.
FY 2024 MISSION DIRECT BUDGETED RESOURCES
TRANSPORTATION TOTAL ALLOCATIONS CONTRACT CONTRACT
$,K FTE $,K FTE NUCLEAR REACTOR SAFETY 74,966.5 1,722.51.0 0.1 NUCLEAR MATERIALS & WASTE SAFETY 32,883.3 460.91,633.5 23.8 CORPORATE 172,391.0 588.00.0 0.0 INSPECTOR GENERAL(no DNSFB) 2,386.0 68.0
SUBTOTAL - FEE BASE RESOURCE 282,626.8 2,839.41,634.5 23.9
Figures below in $, M (unless otherw ise indicated)
(1) FY 2024 ALLOCATIONS: equals $, K + FTE*FTE rate (show n below ) 13.2
(2) LESS ESTIMATED 10 CFR PART 170 FEE COLLECTIONS 3.5
(3) ALLOCATIONS (equals 1 - 2) 9.7
(4) GENERIC TRANSPORTATION RESOURCES (allocated) -7.5
(5) NET 10 CFR PART 171 ALLOCATIONS (after transportation allocated)(equals 3+4) 2.2
(6) FY 2024 TOTAL ALLOCATIONS (after transportation allocation) (equals 2+5) 5.6
(7) % OF BUDGET (% total allocations, excl. fee-relief activities, import/export alloc, small entity ) 0.69%
(8) LLW Surcharge 0.0
(9) LLW Surcharge per licensee
(10) 10 CFR Part 171 billing adjustments 0.0
(11) Adjustments: 0.0
(12) TOTAL FY 2024 ANNUAL FEE (equals 5+8+10+11) 2.2
(13) Number of Licensees 1
(14) Fee Per License (equals 12/13) 2.173536
(DOE's fee)
unrounded annual fee amount per license, actual $ 2,173,536
rounded annual fee, actual $ 2,174,000
FTE FULLY COSTED RATE (average based on budget data, actual $):
6HH'HWHUPLQDWLRQRI+RXUO\\5DWHIRUFDOFXODWLRQV Mission Direct Budgeted Resources for Transportation Fee Class
FY24 FY23 Difference Contract ($,K) FTE Contract ($,K) FTE Contract ($,K) FTE
mdjW=krCibAAlo=pAcbqv
_rpfppfWmbqf=obAl PRODUCT LINE/PRODUCTS:
Oversight Enforcement 1 0.1 1 0.1 0.0 0.0 Training Mission Training 0 0.0 2 0.0 (2.0) 0.0 Mission IT 0 0.0 0 0.0 0.0 0.0 Total Direct Resources 1 0.1 3 0.1 (2.0) 0.0
Grand Total Nuclear Reactor Safety 1 0.1 3 0.1 (2.0) 0.0
PROGRAM: NUCLEAR MATERIALS AND WASTE SAFETY BUSINESS LINE: NUCLEAR MATERIALS USERS PRODUCT LINE/PRODUCTS:
Oversight Enforcement 1 0.0 1 0.0 0 0.0 State Tribal and Federal Programs Liaison 0 0.6 0 0.5 0 0.1 Training Mission Training 0 0.2 0 0.2 0 0.0 Total Direct Resources 1 0.8 1 0.7 0 0.1
PROGRAM: NUCLEAR MATERIALS AND WASTE SAFETY BUSINESS LINE: SPENT FUEL STORAGE AND TRANSPORTATION PRODUCT LINE/PRODUCTS:
Licensing IT Infrastructure 205 0.0 574 0.0 (370) 0.0 Licensing Support 0 0.0 0 0.6 0 (0.6)
Mission IT 500 0.0 233 0.0 267 0.0 Enviromental Reviews 250 2.5 0 0.0 250 2.5 Transportation Certification 590 15.5 590 16.7 0 (1.2)
Oversight Security 0 0.0 0 0.1 0 (0.1)
Inspection 0 2.0 0 1.5 0 0.5 Rulemaking Rulemaking (PL) 0 2.0 0 0.0 0 2.0 Training Organizational Development 2 0.0 1 0.0 1 0.0 Entry Level Hiring 0 1.0 0 1.0 0 0.0 Mission Training 65 0.0 72 0.0 (7) 0.0 Mission IT 21 0.0 40 0.0 (19) 0.0 Total Direct Resources 1,633 23.0 1,510 19.9 123 3.1
Grand Total Nuclear Materials & Waste Safety 1,633.5 23.8 1,511 20.6 123 3.2
TOTAL TRANSPORTATION 1,634.5 23.9 1,514 20.7 121 3.2
Total value of budgeted resources for fee class(mission direct FTE x full cost of FTE +
mission direct contract $) $13,154 $11,138 $2,016
01/28/2024 Page 8 of 16 TRANSPORTATION ANNUAL FEES
FY 2024
The total transportation budgeted costs of $9,701,454 to be recovered from annual fees (not including fee-relief adjustments) is to be obtained from two sources:
- 1. Department of Energy (DOE)--has own annual fee (fee category 18A)
- 2. Other licensees (included in their annual fees)
Distribute these costs to DOE and the fee classes based on the percentage of CoCs benefitting (used) per fee class:
Transportation Fee Class # CoCs % CoCsResources to be Resources in included in annual Millions fees
DOE 21.0 22.2% $2,156,247 $2.2 Operating Reactors 6.0 6.4% $616,070 $0.6 Spent fuel/reactor 19.0 20.1% $1,950,890 $2.0 decom NPUF 0.5 0.5% $49,683 $0.05 Fuel Facilities 24.0 25.4% $2,464,282 $2.5 Materials Users 24.0 25.4% $2,464,282 $2.5 Total 94.5 100.0% $9,701,454 $9.7
Reconciliation of Spent Fuel Storage/ Spent Fuel Storage/
Transportation Business Line vs. Fee Class Transportation Business Line (Dollars in thousands) (CBJ)
Contract $ FTE Product Lines Event Response 0.0 0.0 Generic Homeland Security 0.0 0.0 International Activities 0.0 1.5 Licensing 2,506.0 55.0 Oversight 0.0 19.0 Research 1,900.0 3.0 Rulemaking 400.0 5.0 Mission Support/Supervisors 1.0 15.0 State/Tribal/Federal Programs 0.0 0.0 Training 301.0 2.0 Travel 476.0 0.0
$ 5,584.0 100.5
FTE rate $231,150 times 99.0 FTEs; $239,400 times 1.5 FTE (includes Salaries & Benefits only) $ 23,243.0
Total Business Line Budget (BL) 5,584.0$ $ 23,243.0 = 28,827.0$
Transportation Fee Class (Proposed Fee Rule)
Deductions from BL resources
(YHQW5HVSRQVH
- HQHULF+RPHODQG6HFXULW\\
,QWHUQDWLRQDO$FWLYLWLHV
/LFHQVLQJ
2YHUVLJKW
0LVVLRQ6XSSRUW 6XSHUYLVRUV
5HVHDUFK
5XOHPDNLQJ
6WDWH 7ULEDO )HGHUDO3URJUDPV
7UDLQLQJ
7UDYHO
Increases from Other resources
,QWHUQDWLRQDO$FWLYLWLHV
6WDWH 7ULEDO )HGHUDO3URJUDPV
2YHUVLJKW
7UDLQLQJ
BL resources w/ fee rule allocations $ 23.91,636.5
FTE fully costed rate $482,006 times 23.9 FTEs ( includes Salaries, Benefits, indirect resources & agency support) $ 11,519.9
Total Fee Class Budget 1,636.5$ $ 11,519.9 = 13,156.44$
Variances $ (76.6) (11,723.0)(3,947.5)$ (15,670.5)$
Notes:
Deductions include: Exclusion Items 1, Indirect resources 2, resources allocated to other fee classes/fee-relief categories 3 and Carryover/Appropriation reductions 5
Increases include: resources allocated from other Business Lines 4 (i.e., Nuclear Materials and Decommissioning/LLW )
Regulatory Flexibility Analysis
Section IV.
The Regulatory Flexibility Act (RFA), as amended 5 U.S.C. § 601 et seq., requires that agencies consider the impact of their rulemakings on small entities and, consistent with applicable statutes, consider alternatives to minimize these impacts on the businesses, organizations, and government jurisdictions to which they apply.
Additionally, the Small Business Regulatory Enforcement Fairness Act (SBREFA) requires all Federal agencies to prepare a written compliance guide for each rule for which the agency is required to prepare a regulatory flexibility analysis. The NRC, in compliance with the law, prepared the FY 2023 Small Entity Compliance Guide for the FY 2023 fee rule. The compliance guide was developed when the NRC completed the small entity biennial review for FY 2023. The NRC plans to continue to use this compliance guide for FY 2024 and has relabeled the compliance guide to reflect the current FY.
Licensees may use this guide to determine whether they qualify as a small entity under NRC regulations and are eligible to pay reduced FY 2024 annual fees assessed under 10 CFR Part 171.
The NRC has established two tiers of annual fees for those materials licensees who qualify as small entities under the NRCs size standards.
B udge t Author it y ( FY 2024)
T he t able be low d eli ne at es wher e t he major p ort ion of a Busi ness Li nes d irect bu dget ary resources ar e all ocat ed w he n calcu lat in g 10 CF R Part 171 f ees f or a lic ense f ee cl ass. T he indir ect port ion of a Busi ness L ine (e. g. T rain ing, T ravel, Missi on Sup port and Supervis ors), as well as C orpor at e Sup port and I nsp ect or G enera l bud get ary reso urces, are dist rib ut ed amo ng al l lice nse f ee cl asses.
CROSSWALK OF BUSINESS LINES ALLOCATION TO FEE CLASSES*
Business Line L i cen se F ee Cl ass O perat ing R eact ors Power Re act ors, Non-Po wer Prod uct io n or Ut ilizat i on F acil it ies New Re act ors Power Re act ors F uel F acilit i es F uel F acilit i es Nucle ar Mat eria ls Users Mat erials Us ers Spent F uel St orag e an d Spent F uel St orag e/ React or T ransport at io n Decommiss ion ing, T ransp ort at ion Decommiss ion ing a nd Lo w-lev el Spent F uel St orag e/ React or W ast e Decommiss ion ing, Ura nium R ecovery, Rar e Earth
- Delineates where the major portion of a Business Lines direct budgetary resources are allocated for a license fee class.
Does not include fee-relief allocation. NRC does not have licensees under the Rare Earth fee class.
More informat i on ab out 10 CF R Part 17 0 and 10 CF R Part 171 can b e f ound at NR Cs publ ic webs it e: ht t p: / / www. nrc. gov/ abo ut-nrc/ regu lat ory/ lic ensi ng/ f ees. ht ml.
B udge t A uthor it y ( FY 2024)
FY 2024 Budget Summary by Program
This rep ort is p rovide d as su ppleme ntal inf orma tion. It provid es a su mma ry of th e FY 20 24 budget ed F TE and c ontrac t dolla rs allocate d to each fe e class an d fee -relief /surch arge activities at the P rogr am lev el. Th e P rogr ams inclu de: 1 ) Nuclea r Reacto r S afety, 2) Nucle ar M aterials &
Waste S afety, 3 ) Corp orat e S uppo rt, an d 4) Inspect or Ge neral.
FY 2024 MISSION DIRECT BUDGETED RESOURCES SPENT FUEL STORAGE/ NON POWER PRODUCTION POWER REACTORS REACTOR DECOMM. OR UT ILIZAT ION FACILIT IES FUEL FACILITY TOTAL AL L O C AT IO N S AL L O C AT IO N S AL L O C AT IO N S AL L O C AT IO N S CONTRACT CONTRACT CONTRACT CONTRACT CONTRACT
$,K FTE $,K FTE $,K FTE $,K FTE $,K FTE NUCLEAR REACTOR SAFETY 74,966.5 1,722.5 59,698.0 1274.6 1.0 0.3 393.0 9.3 0.00.0 NUCLEAR MATERIALS & W ASTE SAFETY 32,883.3 460.9 51.0 2.1 5,854.5 93.3 0.5 0.0 3,342.360.3 CORPORATE 172,391.0 588.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00.0 INSPECTOR GENERAL(no DNSFB) 2,386.0 68.0
SUBTOTAL - FEE BASE RESOURCE 282,626.8 2,839.4 59,749.0 1276.7 5,855.5 93.6 393.5 9.3 3,342.360.3 FY 2024 MISSION DIRECT BUDGETED RESOURCES
MAT ER IAL S TRANSPORTATION URANIUM RECOVERY RARE EARTH IMPORT/EXPORT TOTAL AL L O C AT IO N S AL L O C AT IO N S AL L O C AT IO N S AL L O C AT IO N S AL L O C AT IO N S CONTRACT &2175$&7 &2175$&7 &2175$&7 &2175$&7 &2175$&7
$,K FTE . )7( . )7( . )7( . )7( . )7(
------------------------------
NUCLEAR REACTOR SAFETY 74,966.5 1,722.5
NUCLEAR MATERIALS & W ASTE SAFETY 32,883.3 460.9
CORPORATE 172,391.0 588.0
INSPECTOR GENERAL(no DNSFB) 2,386.0 68.0
SUBTOTAL - FEE BASE RESOURCE 282,626.8 2,839.4
FY 2024 MISSION DIRECT BUDGETED RESOURCES INCLUDED IN PROFESSIONAL AGREEMENT AGREEMENT INCLUDED IN HOURLY & FTE RATE NONPROFIT ED. INTERNATIONAL STATE STATE TOTAL FEE-RELIEF ACTIVITIES (overhead) EXEMPTION ACTIVITIES OVERSIGHT REG SUPPORT CONTRACT &2175$&7 &2175$&7 &2175$&7 &2175$&7 &2175$&7 &2175$&7
$,K FTE . )7( . )7( . )7( . )7( . )7( . )7(
------------------------------
NUCLEAR REACTOR SAFETY 74,966.5 1,722.5
NUCLEAR MATERIALS & W ASTE SAFETY 32,883.3 460.9
CORPORATE 172,391.0 588.0
INSPECTOR GENERAL(no DNSFB) 2,386.0 68.0
SUBTOTAL - FEE BASE RESOURCE 282,626.8 2,839.4
FY 2024 MISSION DIRECT BUDGETED RESOURCES ISL RULE/ GENERIC MILITARY RADIUM PUBLIC RADIUM GEN LICENSEES/ DECOMMISS/ 226 226 TOTAL FELLOWSHIPS RECLAIMATION GENERIC LLW BUDGET SUM CONTRACT &2175$&7 &2175$&7 &2175$&7 &2175$&7 &2175$&7 &2175$&7
$,K FTE . )7( . )7( . )7( . )7( . )7( . )7(
------------------------------
NUCLEAR REACTOR SAFETY 74,966.5 1,722.5
NUCLEAR MATERIALS & W ASTE SAFETY 32,883.3 460.9
CORPORATE 172,391.0 588.0
INSPECTOR GENERAL(no DNSFB) 2,386.0 68.0
SUBTOTAL - FEE BASE RESOURCE 282,626.8 2,839.4