Letter Sequence RAI |
|---|
EPID:L-2023-TOP-0036, Final Request for Additional Information - Mitsubishi Electric Power Products, Inc. (Meppi) JEXU-1041-1008, Safety System Digital Platform - Meltac (Approved, Closed) |
Results
Other: ML23179A176, ML23179A182, ML23179A184, ML24075A314, ML24117A209, ML24117A210, ML24117A212, ML24157A382, ML24236A706, ML24236A707, ML24236A708, ML24236A710, ML24236A712, ML24296B178, ML24317A161, ML24317A162, ML25069A451, ML25069A452, ML25069A454, ML25069A456, ML25069A458, ML25069A460
|
MONTHYEARML23179A1822023-08-11011 August 2023 NRC Form 897, Topical Report Withholding Determination, for Safety System Digital Platform - Meltac Project stage: Other ML23179A1842023-08-15015 August 2023 NRC Form 898, Topical Report Completeness Determination, for Safety System Digital Platform - Meltac Project stage: Other ML23179A1762023-08-16016 August 2023 E-mail - U. S. Nuclear Regulatory Commission Completion Determination Form 898 and Withholding Determination from 897 for JEXU-1041-1008, Safety System Digital Platform - Meltac (Mitsubishi Electric Total Advanced Controller) Topical Report Project stage: Other ML23249A2302023-09-13013 September 2023 Mitsubishi Electric Company (Melco) Regulatory Audit in Support of Review of the Revision to the Meltac Platform Topical Report Project stage: Approval ML24010A0182024-01-19019 January 2024 Final Request for Additional Information - Mitsubishi Electric Power Products, Inc. (Meppi) JEXU-1041-1008, Safety System Digital Platform - Meltac Project stage: Request ML24019A0292024-01-19019 January 2024 Enclosure 3 - Request for Additional Information Deleted - Mitsubishi Electric Power Products, Inc. (Meppi) JEXU-1041-1008, Safety System Digital Platform - Meltac Project stage: RAI ML24019A0282024-01-19019 January 2024 Enclosure 2 - Final Request for Additional Information - Mitsubishi Electric Power Products, Inc., (Meppi) JEXU-1041-1008, Safety System Digital Platform - Meltac Project stage: RAI ML24010A0222024-01-19019 January 2024 Final Request for Additional Information - Mitsubishi Electric Power Products, Inc., (Meppi) JEXU-1041-1008, Safety System Digital Platform - Meltac Project stage: RAI ML24037A0972024-02-0606 February 2024 Status of NRC Staff Review of JEXU-1041-1008, Safety System Digital Platform - Meltac Project stage: Approval ML24078A4352024-03-13013 March 2024 Mitsubishi Electric Corp Response to Request for Additional Information for Meltac Topical Report - RAI 4 for L-2023-TOP-0036 Project stage: Response to RAI ML24078A4432024-03-13013 March 2024 Mitsubishi Electric Corp Response to Request for Additional Information for Meltac Topical Report - RAI 9 for L-2023-TOP-0036 Project stage: Response to RAI ML24078A4412024-03-13013 March 2024 Mitsubishi Electric Corp Response to Request for Additional Information for Meltac Topical Report - RAI 7 for L-2023-TOP-0036 Project stage: Response to RAI ML24078A4392024-03-13013 March 2024 Mitsubishi Electric Corp Response to Request for Additional Information for Meltac Topical Report - RAI 6 for L-2023-TOP-0036 Project stage: Response to RAI ML24078A4372024-03-13013 March 2024 Mitsubishi Electric Corp Response to Request for Additional Information for Meltac Topical Report - RAI 5 for L-2023-TOP-0036 Project stage: Response to RAI ML24078A4422024-03-13013 March 2024 Mitsubishi Electric Corp Response to Request for Additional Information for Meltac Topical Report - RAI 8 for L-2023-TOP-0036 Project stage: Response to RAI ML24078A4342024-03-13013 March 2024 Mitsubishi Electric Corp Response to Request for Additional Information for Meltac Topical Report - RAI 3 for L-2023-TOP-0036 Project stage: Response to RAI ML24078A4332024-03-13013 March 2024 Mitsubishi Electric Corp Response to Request for Additional Information for Meltac Topical Report - RAI 2 for L-2023-TOP-0036 Project stage: Response to RAI ML24078A4322024-03-13013 March 2024 Mitsubishi Electric Corp., Response to Request for Additional Information for Meltac Topical Report - RAI 1 for L-2023-TOP-0036 Project stage: Response to RAI ML24075A3142024-03-15015 March 2024 Mitsubishi Electric Corporation (Melco) Submittal of Support Documents for Meltac Topical Report Project stage: Other ML24088A0412024-03-28028 March 2024 NRC 897 for Meltac RAI 1 Response Withholding Review - NRC 897 Project stage: RAI ML24117A2122024-04-24024 April 2024 Enclosure 2: Summary of Compliance to the Regulatory Guide 1.152 Revision 4 Project stage: Other ML24117A2092024-04-25025 April 2024 Mitsubishi Electric Corporation (Melco), Submittal of Support Documents for Meltac Topical Report Project stage: Other ML24117A2102024-04-25025 April 2024 Enclosure 1: Affidavit for Topical Report Support Document 20240425 Project stage: Other PMNS20240676, Melco Meltac Request for Additional Information Response and Supplement Discussion2024-05-13013 May 2024 Melco Meltac Request for Additional Information Response and Supplement Discussion Project stage: RAI ML24137A1512024-05-16016 May 2024 Mitsubishi Electric Corporation (Melco) Submittal of Support Documents for MEL TAC Topical Report Project stage: Request ML24157A3852024-05-29029 May 2024 Mitsubishi Electric Corporation (Melco), Responses for Discussion Topics on RAI Responses and Supplements Project stage: Request ML24157A3822024-06-0404 June 2024 Mitsubishi Electric Corporation (Melco), Submittal of Presentation Material for MEL TAC Topical Report Project stage: Other ML24179A2902024-06-27027 June 2024 NRC 897 for Meltac RAI 5 Response, Document No. JEXU-1041-1018 Revision 1 Project stage: RAI ML24179A2912024-06-27027 June 2024 NRC 897 for Meltac RAI 6 Response, Document No. JEXU-1041-1018 Revision 1 Project stage: RAI ML24179A2922024-06-27027 June 2024 NRC 897 for Meltac RAI 7 Response, Document No. JEXU-1041-1018 Revision 1 Project stage: RAI ML24320A0912024-06-27027 June 2024 NRC 897 for Meltac RAI 10 Response, Document No. JEXU-1041-1008 Project stage: RAI ML24092A0822024-07-0101 July 2024 E-mail - Proprietary Review Form 897 for Meltac RAI Response, Document No. JEXU-1041-1018 Revision 1 Project stage: RAI ML24206A0782024-07-31031 July 2024 U.S. NRC Summary of Observation Public Meeting to Discuss Melcos Responses to the Rais and Supplement Response Project stage: RAI 2024-03-28
[Table View] |
Text
Enclosure 3 JEXU-1041-1008, SAFETY SYSTEM DIGITAL PLATFORM - MELTAC
[MITSUBISHI ELECTRIC TOTAL ADVANCED CONTROLLER] TOPICAL REPORT REQUEST FOR ADDITIONAL INFORMATION (RAIS)
DELETED DURING CLARIFICATION CALL The U.S. Nuclear Regulatory Commission (NRC) staff held a clarification call with Mitsubishi Electric Corporation (MELCO) on January 17, 2024, to ensure that MELCO understood the information being sought in the RAIs. During that meeting, MELCO directed the NRC to information already available to the staff that provide the information in the request below.
Therefore, the RAI was removed, and MELCO does not need to provide additional information.
RAI Deleted As a Result of Clarification Call Regulatory Basis: 10 CFR 50.55a(h), Protection and Safety Systems, requires that protection systems must be consistent with their licensing basis or may meet the requirements of the IEEE Std 603-1991, IEEE Standard Criteria for Safety Systems for Nuclear Power Generating Stations, and the correction sheet dated January 30, 1995. Clause 5.4, Equipment Qualification of IEEE Std 603-1991 states, in part, that safety system equipment shall be qualified by type test, previous operating experience, or analysis, or any combination of these three methods, to substantiate that it will be capable of meeting, on a continuing basis, the performance requirements as specified in the design basis. MELTAC is a safety system digital platform which shall meet the requirements in the above Clause 5.4.
Background and Issue: Section 3.2.1.6 Safety Visual Display System of the original SE for MELTAC does not include an evaluation finding of the safety visual display units (S-VDU). In addition, PSAI 5.2.17 of the original SE states, in part, that The S-VDU is not approved for use in a manner such that it is required to be operational when the MELTAC safety system is called upon to initiate an automatic safety function. However, the S-VDU is included in Appendix A, Hardware Specification of the revised MELTAC TR, which describes modules that are used for safety systems.
Request: Please provide information to demonstrate that the S-VDU was reviewed and found to be acceptable for safety applications.