License Amendment 7 Approving the Decommissioning Plan for the Radiography and Research Reactor
ML23310A114
Person / Time
Site: Aerotest
Issue date: 03/06/2024
From: Goller K
Division of Decommissioning, Uranium Recovery and Waste Programs
To: Slaughter D
Aerotest
Shared Package
ML23310A104:ml23310a104 List:
References
EPID L-2021-LLN-0004
Download: ML23310A114 (3)


Text

Attachment 1 ATTACHMENT TO LICENSE AMENDMENT NO. 7 FACILITY OPERATING LICENSE NO. R-98 DOCKET NO. 50-228 Replace the following page of the Facility Operating License No. R-98 with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

Facility Operating License Remove Insert 4

4 5

Amendment No. 7 E.

Records In addition to those otherwise required under this license and applicable regulations, the licensee shall keep the following:

(1)

Reactor operating records, including power levels.

(2)

Records of in-pile irradiations.

(3)

Records showing radioactivity released or discharged into the air or water beyond the effective control of the licensee as measured at the point of such release of discharge.

(4)

Records of emergency reactor scrams, including reasons for emergency shutdowns.

F.

Decommissioning The licensee shall implement and maintain in effect all provisions of the approved Decommissioning Plan for the Aerotest Radiography and Research Reactor, dated July 20, 2021, as supplemented on January 20, 2022, July 21, 2022, and November 16, 2022, (hereinafter, DP), which authorizes inclusion of the DP as a supplement to the Safety Analysis Report pursuant to 10 CFR 50.82(b), and is subject to and amended by the following stipulations:

(1) The licensee may make changes to the DP without prior NRC approval provided the proposed changes do not meet any of the following criteria:

a) Require Commission approval under 10 CFR 50.59.

b) Result in the potential for significant environmental impacts that have not previously been reviewed.

c)

Detract or negate the reasonable assurance that adequate funds will be available for decommissioning.

(2) This DP is approved under the regulation in 10 CFR 50.82(b)(2) that allows for a DP, in which the major dismantlement activities are delayed by first placing the facility in storage, to be less detailed. Therefore, an updated detailed DP shall be submitted and approved prior to the start of major dismantlement activities. The updated DP shall contain more detailed information on the remaining dismantlement and remediation activities, as well as the final status survey plan, for NRC review and approval prior to conducting final status surveys for license termination.

Amendment No. 7 G.

This amended license is effective as of the date of issuance and until the Commission notifies the licensee in writing that the license is terminated.

FOR THE ATOMIC ENERGY COMMISSION

/RA/

Karl R. Goller, Assistant Director for Operating Reactors Directorate of Licensing

Attachment:

Change No. 8 to the Technical Specifications Date of Issuance: October 22, 1974