ML23241A627

From kanterella
Jump to navigation Jump to search
7 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-4, Drawing 102789, Rev. 5, Sheet 1, Logic Diagram Centrifugal Charging Pumps
ML23241A627
Person / Time
Site: Diablo Canyon  
Issue date: 05/25/2023
From:
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23241A052 List: ... further results
References
DCL-23-044
Download: ML23241A627 (1)


Text

68LZOl 1

2 z

0 j!Qlo

{

SIS AUTO REF A ST ART SIGNAL 5 & 6 B 4KV AUTO TRANSFER SIGNAL (NO SIS) 3 4

ALARM CS/NEUT 6REMOTE 5

6 7

8 9

10 NOTES 43/TS - TRANSFER SWITCH TRANSFERS CONTROL FROM MAIN CONTROL BOARD TO HOT SHUTDOWN PANEL (LOCATED AT SWITCHGEAR),

43 -

MODE SELECTOR SWITCH FOR SELECTING "AUTO" OR "MANUAL~ MODE <LOCATED AT HOT SHUTDOWN PANEL).

6 - REMOTE CONTROL SWITCH LOCATED AT HOT SHUTDOWN PANEL.

CLOSE 52 TRIP 52HF I I NO. 2 I 52HG9 NO, 22 4141---------------'

'----+-----+---~.....____'._J REFERENCES DWG NO.

{

SIS AUTO REF F START SIGNAL 5 & 6 G 4KV AUTO TRANSFER SIGNAL (NO SIS)

START CHARGING PP CHARGING PP RUNNING 6 43/MAN L.O. LOW PRESS (3 MIN)

CHARGING PUMP AUXILIARY LUBE OIL PUMP 5

M REV REGISTERED ENGINEER 102789D.E62 04-27-94 WAA 5 S.S.

ADD ALARM INPUT AT 43/t-iAN INPUT (FCT 17116)

WAA u/!:j CS/ TRIP <SWGR)

OVERCURRENT REF c TRANSFER TO DIESE 5 & 6 LOAD SHED ON OFF NO.

21 52-2F-60 NO. 22 52-2G-64

--0 I. LOGIC DIAG SYMBOLS _______ 19425
2. SCHEMATIC DIAG CHARGING PP ___ 441312 3. SLM& R D I AG 4 KV BUS F _____. 4 4 I 2 2 9
4. SLM&R DIAG 4KV BUS G & H ____ 441230
5.

LOGIC DIAG 4KV BUS F AUTO TRANSFER_ 441286

6.

LOGIC DIAG 4KV BUS G AUTO TRANSFER_ 441297 T.A.Betterswort No. 1986 J'

Cf.

).\,,

NUCLEAR SAFETY RELATED COAST VALLEYS DIVISION KEY DWG--SECTION _3_

UNIT 2 LOGIC DIAGRAM CENTRIFUGAL CHARGING PUMPS MICROFlLM 5

BILL OF MATL DWG UST SUPSDS E

D C

B 4 1-20-94 REV LOGIC; DEL STAR NOTE; ADD REF OWL WG 5 & 6 (FCT-16395) 1------1CHKD EZ r---:l--t-9--3---75-t--AP_P_R_OV_E_D _F_O_R -C-ON_S_TR_U_C_TI_O_N __

+-1-6-9 9-7-2-+--

+-E-Z--+---+-L-R-W-+-D-N--1 J WC OK H H DP J DN I--DWN ____

---1 DIABLO CANYON 1--SU_P_SD_B_Y --------1 A NO.

DATE DESCRIPTION GM/SPEC DWN CHKD SUPV APVD BY TAB DATE 9-23-75 R E V I S I O N S SCALES NONE 2

3 4

5 6

DEPARTMENT OF ENGINEERING PACIFIC GAS AND ELECTRIC COMPANY SAN FRANCISCO, CALIFORNIA 7

8 SHEET NO.

102789 9

UI 1941010 SHEETS REV 5