ML23241A083
Text
A B
C D
40E 41E 42E 43E 44E 45E 46E 47E 48E 49E r--------------------------------------------------------------------------------------------------------------------------------------
39-E 26 NITROGEN SUPPLY K2-I" A{
141-A 16 S 2 -3/4" I PRIMARY I
WATER SUPPLY I
I llf-1/2" ll<-1" NOTE I PRESSURE VACUUM FILL RELIEF FILL FUNNEL VALVE FUNNEL RV-1905 r __________ _J
- -1/2"
)II-1/2" 11!-1/2" NOTE 2 NOTE I NOTE I
- -I"
'-----+-I----,,------[]:
- -3/4" EDUCTOR NOTE 3 NOTE 6 ZINC TANK EDUC TOR NOTE 3
- -3/4" 111-1 11 NOTE 2 ZINC OVERFLOW lll-11/2" NOTE 2 NOTE 2
- -3/a" LI 1905
!11-I" ACETATE llf-3/4" LI 1905 111-1 11 INJECTION
- -I" SUB REFERENCE DRAWING DC 6015608-6 (NOTE 5l NOTE 3
- -3/4" llf-3/4"
- -I" NOTE 3 NOTE 3
- -3/4" SYSTEM NOTE 3
- -3/a" PS 1906 NOTE 3 ~
- -3/s" NOTE 4 NOTE 3 PULSATION 111-3/4" NOTE 3 PULSATION PS 1907 ;;
- -3/4" PS 1905 ;;
- -3/a" NOTE 3 NOTE 3 &
~
PCV-1906 PCV-1905 r-.J I
I I
I I
I TO UNIT 2 40C-B 08
~----------------------------------------------------------------------------------------------------------------------------------------------------
I TO UN IT NOTES:
STEWART,SERIES G3,3 PIECE BALL VALVE I" & 1/2"
- 3. WHITEY "40" SERIES,%" BALL VALVE
- 4. NUPRO "50" SERIES,%" LIFT CHECK VALVE
- 5. ALL PIPING ANO TUBING ON THE SKIO MOUNTED SUB-SYSTEM IS MANUFACTURER' s STANDARD.
- 6. ROOT VAL VE, STOCK CODEi'3-0 I 5~.
- 7. ISOLATION VALVE, STOCK COOE 73-0291.
B.
NEEOLEVALVE, S/C70-451B
- 9.
CHECK VALVE, S/C 74-5050
- 10. PRESSURE REGULATOR, S/C 12-8118 II. HIGH PURITY ARGON, S/C85-1203 12.RELIEFVALVE,S/C73-7422
~
FLOWCONTROLLE~
A2
&{NOTE 12 RV-120 f-l_0~-~14=-=20_1_9+A=J~F~J+-F=X=C_2 f-N=/~A-+-NO~T=R=EQ~U~l =RE~D~PE=R=CF=3=. ='°-5-+-~~~-+~~-----,f-c~=------iRev i sed Per OFT-7 *4969 DATE OWN RE IV PROFESSIONAL ENGINEER PE DISC.
1-905 1-904 UNIT DIABLO CANYON POWER PLANT - PG&E CO.
CHEMICAL & VOLUME CONTROL SYSTEM DRAWi NG SHEET PAGE REV 102008 4E 0
10 A
B C
D E