IR 05000275/2023005

From kanterella
(Redirected from ML23233A183)
Jump to navigation Jump to search
Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2023005 and 05000323/2023005) - Mid Cycle Letter
ML23233A183
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/22/2023
From: Patricia Vossmar
NRC/RGN-IV/DORS
To: Gerfen P
Pacific Gas & Electric Co
References
IR 2023005
Download: ML23233A183 (1)


Text

August 22, 2023

SUBJECT:

UPDATED INSPECTION PLAN FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 (REPORT 05000275/2023005 AND 05000323/2023005)

Dear Paula Gerfen:

The enclosed inspection plan lists the inspections scheduled through June 30, 2025, for Diablo Canyon Power Plant, Units 1 and 2. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. The Regional Administrator has approved the staffs plan to conduct Inspection Procedure 71013, Site Inspection for Plants with a Timely Renewal Application and Inspection Procedure 71002, License Renewal Inspection at your facility as indicated in the enclosed inspection plan. These inspections are being scheduled in anticipation of your submittal of an application for a renewed operating license. The scheduling of these inspections is based on advanced planning of NRC inspector workload and is not indicative of any NRC decisions related to license renewal applications.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). The ADAMS system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (817) 200-1144 with any questions you have regarding this letter.

Sincerely, Signed by Vossmar, Patricia on 08/22/23 Patricia J. Vossmar, Chief Reactor Projects Branch A Division of Operating Reactor Safety Docket Nos: 05000275, 05000323, and 07200026 License Nos: DPR-80 and DPR-82 Enclosure:

Inspection Plan cc w/ encl: Distribution via LISTSERV

ML23233A183 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:

By: RLB Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:DORS/A BC:DORS/A NAME RBywater PVossmar DATE 8/22/23 8/22/23

Site Inspection Activity Plan 07200026 - Diablo Canyon (ISFSI)

07/01/2023 - 06/30/2025 Unit Start End Activity CAC Title Staff Count Diablo Canyon ISFSI Loading Inspection (one week during the campaign) 2 8/1/2024 10/31/2024 IP 60855 001001 Operation Of An ISFSI ISFSI Security Inspection (IP 81311) 1 10/7/2024 10/11/2024 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations Prepared on 8/18/2023 1:29:11 PM 1 of 4

Site Inspection Activity Plan Diablo Canyon 07/01/2023 - 06/30/2025 Unit Start End Activity CAC Title Staff Count Security FFD .08 1 1,2 7/24/2023 7/28/2023 IP 71130.08 000740 Fitness For Duty Program DC 2023 INITIAL EXAM 3 1,2 7/30/2023 8/5/2023 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Security Protective Strategy .05 2 1,2 9/11/2023 9/15/2023 IP 71130.05 000737 Protective Strategy Evaluation EP 2023 Program Inspection - DC 1 1,2 9/18/2023 9/22/2023 IP 71114.02 000717 Alert and Notification System Testing 1,2 9/18/2023 9/22/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 9/18/2023 9/22/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 9/18/2023 9/22/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 9/18/2023 9/22/2023 IP 71151 001397 Performance Indicator Verification Inservice Inspection Unit 1 2 1 10/8/2023 10/21/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

License Renewal 71013 - DC 3 1 10/9/2023 10/29/2023 IP 71013 001852 Site Inspection for Plants with a Timely Renewal Application RP 1,4,PI - 2 1,2 10/9/2023 10/13/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 10/9/2023 10/13/2023 IP 71124.04 000728 Occupational Dose Assessment 1,2 10/9/2023 10/13/2023 IP 71151 000746 Performance Indicator Verification Cyber Security Inspection - DC 4 1,2 11/13/2023 11/17/2023 IP 71130.10 000741 Cybersecurity License Renewal 71013 - DC (Unit 2) 3 2 4/8/2024 4/26/2024 IP 71013 001852 Site Inspection for Plants with a Timely Renewal Application Inservice Inspection - DC (U2) 1 2 4/8/2024 4/19/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,3,PI 2 1,2 4/15/2024 4/19/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 4/15/2024 4/19/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 1,2 4/15/2024 4/19/2024 IP 71151 000746 Performance Indicator Verification In-Office EP Exercise Scenario Review (2024) - DC 4 1,2 5/26/2024 6/30/2024 IP 71114.08 000723 Exercise Evaluation - Scenario Review Prepared on 8/18/2023 1:29:11 PM 2 of 4

Site Inspection Activity Plan License Renewal 71002 Followup - DC 5 1,2 6/10/2024 6/21/2024 IP 71002 000686 License Renewal Inspection Age-Related Degradation Inspection - Diablo Canyon 3 1,2 6/10/2024 6/14/2024 IP 71111.21N.04 001832 Age-Related Degradation 1,2 6/24/2024 6/28/2024 IP 71111.21N.04 001832 Age-Related Degradation Security Equipment (.04), Security Training (.07) 2 1,2 6/24/2024 6/28/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 6/24/2024 6/28/2024 IP 71130.07 000739 Security Training DC 2024 INITIAL EXAM 6 1,2 6/16/2024 6/22/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1,2 7/21/2024 8/3/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

EP Exercise & PI Inspection (2024) - DC 4 1,2 7/29/2024 8/2/2024 IP 71114.01 000716 Exercise Evaluation 1,2 7/29/2024 8/2/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 7/29/2024 8/2/2024 IP 71151 001397 Performance Indicator Verification RP 5,8 2 1,2 8/12/2024 8/16/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 8/12/2024 8/16/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation RP 6,7 2 1,2 8/12/2024 8/16/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1,2 8/12/2024 8/16/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program License Renewal 71013 - Phase 2 (Unit 1) 4 1,2 8/19/2024 8/23/2024 IP 71013 001852 Site Inspection for Plants with a Timely Renewal Application DC 2024 PI&R Inspection 4 1,2 9/9/2024 9/13/2024 IP 71152B 000747 Problem Identification and Resolution 1,2 9/23/2024 9/27/2024 IP 71152B 000747 Problem Identification and Resolution Security Access Control (.02), Security Plan Changes (.09), Security PIV (71151), Target Sets (71130.14) 1 1,2 10/7/2024 10/11/2024 IP 71130.02 000734 Access Control 1,2 10/7/2024 10/11/2024 IP 71130.09 001656 Security Plan Changes 1,2 10/7/2024 10/11/2024 IP 71130.14 000743 Review of Power Reactor Target Sets 1,2 10/7/2024 10/11/2024 IP 71151 001338 Performance Indicator Verification FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - DC 5 1,2 1/13/2025 1/17/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 2/10/2025 2/14/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Cyber Security Inspection - DC 4 1,2 3/24/2025 3/28/2025 IP 71130.10 000741 Cybersecurity Prepared on 8/18/2023 1:29:11 PM 3 of 4

Site Inspection Activity Plan RP 1,4,PI - DC 2 1,2 4/21/2025 4/25/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 4/21/2025 4/25/2025 IP 71124.04 000728 Occupational Dose Assessment 1,2 4/21/2025 4/25/2025 IP 71151 000746 Performance Indicator Verification DC 2025 BRQ 2 1,2 6/1/2025 6/7/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Prepared on 8/18/2023 1:29:11 PM 4 of 4