1 to Updated Safety Analysis Report, Drawing 2034, Flow Diagram Plant Make Up Water Treatment System
ML23129A328
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/20/2023
From:
Nebraska Public Power District (NPPD)
To:
Office of Nuclear Reactor Regulation
Shared Package
ML23129A261 List: ... further results
References
NLS2023022
Download: ML23129A328 (1)


Text

1 2 3 4 5 6 c__.J....__ _ _ _ 7_ _ _ _ __j_ _ _ _ _ s______,_____9_ _ _ _-'-_ _ _ _ 1o

_____,______ 11_ _ _ _ ..J...__ _ _ _ 1_2_ _ _ ---,7 ABANDONED ABANDONED IN PLACE IN PLACE TO MEMBRANE TO MEMBRANE (SEE NOTE 9) PROCESS WATER (SEE NOTE 9) PROCESS WATER 1-WT-101 TREATMENT SYSTEM 1-WT-101 TREATMENT SYSTEM A (13CV) w

'-' (13CV) w

'-' A WT-477 WT-477 (12CV) 1/2" (12CV) 13"'

(198) 19 (198) 161 2WD-1 WT-513 WT-513 (201) (193) (188) (20RV) (201) (193) (188) (20RV) 161 RIVER 161 RIVER (195) 1/2" (195) 1/2" BLIND FLANGE AND WT-531 REPLACED w/ WYE CONNECTION w/ 2 VALVES WT-53~!

HYDRO- HYDRO-(191)161 PNEUMATIC (191)161 PNEUMATIC TANK 2016 SH 2 TANK I I 2016 SH 2 TO CONTROLS ZONE F-10 TO CONTROLS I / ZONE F-10 (199) .,

  • (199) \ ,.,T \

(200) (194)

SEE NOTE 9 -20 4 "WD-1

~~~~__,f><l WT -530 WT -400 r'--.---,f-~....- ~ - - - j H O S E (200) (194)

SEE NOTE 9 -20 4"WD-1 \ WT~3~f-\-l"---WT -4f-oo_~_ _,HOSE CONNECTION \ \ CONNECTION (197) (197)

DRAIN DRAIN B B REMOVABLE SPOOL I \

DRAIN YARD WATER DRAIN YARD\ WATER \

TREATMENT

\ TREATMENT \

I I

\ I

  • N 529 *N 529 527 527 \' I 528 528 '- I 526 526 '- '- I
  • N 6"WD-1
  • N 6"WD-1 '- I

\ I

\ I 6" WELL WATER MAJN L--- 6" WEU. WATER MAIN 6" WELL WATER MAJN L--- 6" WEU. WATER MAlN I; REFER TO CC 5350257 I ABANDONED IN PLACE REFER TO CC 5350257 I ABANDONED IN PLACE }

//\_

u PER CC 5350257 u PER CC 5350257 n n HOSES MAY BE ATTACHED AS NEEDED

/ PER 2.2.57 AND AN APPLICABLE W.O.

521 521 /

C /

/

C

/

519 520 519 520 /

u u /

/

FUTURE 522 FUTURE 522 /

/

EXPANSION EXPANSION /

0 523 523 AIR RELIEF AIR RELIEF VALVE VALVE (203) (18RV) (203) {18RV)

(524) 2" 10 {524) 2" 10 (10CV) (10CV) 12 13 12 13 WELL #1 WELL #1 518 {208) {209) 518 {208) {209)

D D AIR RELIEF AIR RELIEF VALVE VALVE (204) {19RV) (204) {19RV)

TO DRAINAGE TO DRAINAGE

{525) 2" DITCH {525) 2" DITCH ACCESS PIT ACCESS PIT (11CV) 17 SUMP (11CV) 17 SUMP 16 16 WELL #2 WELL #2 517 517 E E ALTERNATE WELL WATER SUPPLY SYSTEM SUPPLY TO WATER TREATMENT SYSTEM (REFERENCE PROCEDURE 2.2.57)

F F NOTES:

1. DELETED
2. HEAVY LINES INDICATE EQUIPMENT & PIPING FURNISHED AND INSTALLED UNDER CONTRACT E69-4.
3. LIGHT LINES INDICATE EQUIPMENT & PIPING FURNISHED BY OTHERS AND INSTALLED UNDER CONTRACT E69-4.

G 4. UNLESS OTHERWISE INDICATED ALL PRESSURE AND FLOW INSTRUMENT ROOT G

VALVES SHALL BE 3/4. LINES UP TO AND INCLUDING ROOT VALVES SHALL BE

,---- --1 y r=, FILTER VENT FURNISHED AND INSTALLED UNDER CONTRACT E69-4.

5. DELETED

~

1 I

.. 6. DELETED

~

NEUTRALIZING ,L

~ (295)

SUMP {192) 7. AT SAMPLING POINTS SP-32 & SP-52, CONNECTIONS, PROBES AND ROOT REMOTE PLUG SEGREGATED VALVES SHALL BE FURNISHED AND INSTALLED UNDER CONTRACT E69-4.

FLOOR DRAIN (TYP) 30,000 GALLON DEMINERALIZED

/LG\ LC 702 LI 702 LS

.;'585

- _J PROBES SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH A CONTRACT PARAGRAPH 3.4.2 AND DWG. SP-07211, FIGURE NUMBER />S

~

WATER STORAGE '(296) t NOTED. ALL OTHER SAMPLING POINTS ARE SUPPLIED BY DEGREMONT-COTTRELL AS INDICATED ON D.C. DWGS. CONTINUATION OF SAMPLE

_/

TANK PUMP - PIPING BY E70-3.

I I (280) 3"CF ,

  • 281 A TRIP 7 I I I 8. WHERE LINES INTERCONNECT AND ARE CONTINUED ON OTHER DRAWINGS, (ALLOY 20) ' ZONE NUMBERS ARE APPROXIMATE ONLY.

J

\

l_

.. LT LS J J297) 702 70"} I 9. HYDRA-PNEUMATIC PRESSURE MAINTENANCE SYSTEM NO LONGER USED 3"DR-6 (282)

I AND ABANDONED IN PLACE.

/LG\ "'I H ~

(293)

  • 0 I H "w I

. {294)

,,. LS 702tj

~

NOTE: ALL ITEMS MARKED THUS 0 ARE "AS BUILT" ITEMS AND ARE NOT SHOWN

,a~ DR-6 1298) m I I MAIN SUMP A 193 w I ON PIPING DRAWINGS.

TO POND '7 I w

I

' 194 I I LS _J I

702':

L __ l y

2"V126S-195 2 "DW 1S I

,-J.., AS BUILT SUMP B~DW-1S TO TRANSFER PUMPS SEE DWG 2013 454003627 ZONE 8-9 STATUS: Release STATUS DATE: 12/22/2021 OS APPROVED: JEDAUEL VER: AE REV: 72 SIZE: F J J SIGNlFICANT DRAWN DAlE NUWBER HFY 06/28/02 GROUP 2 5

  • "'n: ..,

BURNS & ROE CHECKED REVISIONS TO THIS DRAWING VERSIONS/REVISIONS BY NPPD COOPER NUCLEAR STATION "',.._a, REQUIRES A REVISION TO THE CORRESPONDING ISOKEY.