Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23129A4882023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4215, Rev. 3, Reactor Building Structural Shielding Blocks (HPCI Hatch) ML23129A2642023-04-20020 April 2023 1 to Updated Safety Analysis Report, Section I, Figures ML23129A4682023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4259, Sheet 1A, Containment Vessel Penetration Schedule ML23129A4982023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 919D690BC, Reactor Vessel, Sheet 5 ML23129A4992023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 1 ML23129A4952023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E222BB, Sheet 3, Reactor Protection System ML23129A4962023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E222BB, Sheet 1, Reactor Protection System ML23129A4932023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E727BB, Rev. 2, Sheet 3, Functional Control Diagram Recirculation Flow Control System ML23129A4942023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107c, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection ML23129A4912023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E402BB, Rev. 6, Sheet 1, Functional Control Diagram Core Spray System ML23129A4922023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E223BB, Neutron Monitoring System, Sheet 1 ML23129A4892023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E589BB, High Pressure Coolant Injection System Functional Control Diagram, Sheet 3 ML23129A4872023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E100, Neutron Monitoring, Sheet 2 ML23129A4702023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E517BC, Functional Control Diagram Reactor Core Isolation Cooling System, Sheet 2 ML23129A4842023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Sheet 5, Functional Control Diagram Control Rod Drive Hydraulic System ML23129A4862023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4259, Rev. 10, Sheet 1, Containment Vessel Penetration Location ML23129A4822023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram, Control Rod Drive Hydraulic System, Sheet 2 ML23129A4832023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 919D690BC, Revision N01, Recirclulation Outlet Nozzle, Sheet 3 ML23129A4792023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 3005, Sheet 4, Auxiliary One Line Diagram Motor Control Centers M, N, P, U, V, & W ML23129A4802023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 6 ML23129A4772023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Control Rod Drive Hydraulic System Sheet 7 ML23129A4782023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing CNS-NBI-10, Revision N06, Reactor Water Level Indication Correlation ML23129A4752023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E517BC, Reactor Core Isolation Cooling System Functional Control Diagram, Sheet 3 ML23129A4762023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E148BB, Sheet 1, Process Diagram Reactor Water Clean-Up System ML23129A4722023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E727BB, Recirculation Flow Control System, Sheet 1 ML23129A4742023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing CNSMS43, Rev. 5, Leakage Paths from Outboard Msiv'S ML23129A4712023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E719BC, Sheet 1, Process Diagram Reactor Core Isolation Coolant System ML23129A4672023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 6000302, P & I Diagram Augmented Offgas System, Sheet 1 NLS2023022, 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107f, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection2023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107f, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection ML23129A4902023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E140BB, Revision N05, Sheet 2, Fcd Residual Heat Removal System ML23129A5002023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 719E479BB, Process Radiation Monitoring System, Sheet 1 ML23129A5012023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 3058, DC One Line Diagram ML23129A4812023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E140BB, Rev. 10, Sheet 1, Functional Control Diagram Residual Heat Removal System ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23129A4692023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 791E257, General Electric, Sheet 4 ML23129A4852023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E805BA, Revision N01, Neutron Monitoring System Functional Control Diagram, Sheet 7 ML23129A4732023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 731E611, Revision N04, Primary Steam Piping Nuclear Boiler Purchased Part, Sheet 1 2023-04-20
[Table view] Category:Drawing
MONTHYEARML23129A4862023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4259, Rev. 10, Sheet 1, Containment Vessel Penetration Location ML23129A4662023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E197BB, Rev. 7, Sheet 6b, Reactor Recirculation Controller Configuration ML23129A2642023-04-20020 April 2023 1 to Updated Safety Analysis Report, Section I, Figures ML23129A4982023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 919D690BC, Reactor Vessel, Sheet 5 ML23129A4962023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E222BB, Sheet 1, Reactor Protection System ML23129A4952023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E222BB, Sheet 3, Reactor Protection System ML23129A4932023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E727BB, Rev. 2, Sheet 3, Functional Control Diagram Recirculation Flow Control System ML23129A4922023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E223BB, Neutron Monitoring System, Sheet 1 ML23129A4912023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E402BB, Rev. 6, Sheet 1, Functional Control Diagram Core Spray System ML23129A4882023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4215, Rev. 3, Reactor Building Structural Shielding Blocks (HPCI Hatch) ML23129A4872023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E100, Neutron Monitoring, Sheet 2 ML23129A4682023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 4259, Sheet 1A, Containment Vessel Penetration Schedule ML23129A4842023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Sheet 5, Functional Control Diagram Control Rod Drive Hydraulic System ML23129A4832023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 919D690BC, Revision N01, Recirclulation Outlet Nozzle, Sheet 3 ML23129A4822023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram, Control Rod Drive Hydraulic System, Sheet 2 ML23129A4782023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing CNS-NBI-10, Revision N06, Reactor Water Level Indication Correlation ML23129A4792023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 3005, Sheet 4, Auxiliary One Line Diagram Motor Control Centers M, N, P, U, V, & W ML23129A4762023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E148BB, Sheet 1, Process Diagram Reactor Water Clean-Up System ML23129A4772023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Control Rod Drive Hydraulic System Sheet 7 ML23129A4742023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing CNSMS43, Rev. 5, Leakage Paths from Outboard Msiv'S ML23129A4752023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E517BC, Reactor Core Isolation Cooling System Functional Control Diagram, Sheet 3 ML23129A4712023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E719BC, Sheet 1, Process Diagram Reactor Core Isolation Coolant System ML23129A4732023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 731E611, Revision N04, Primary Steam Piping Nuclear Boiler Purchased Part, Sheet 1 ML23129A4692023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 791E257, General Electric, Sheet 4 ML23129A5012023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 3058, DC One Line Diagram ML23129A4812023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E140BB, Rev. 10, Sheet 1, Functional Control Diagram Residual Heat Removal System ML23129A5002023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 719E479BB, Process Radiation Monitoring System, Sheet 1 ML23129A4942023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107c, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection ML23129A4802023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 6 ML23129A4702023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E517BC, Functional Control Diagram Reactor Core Isolation Cooling System, Sheet 2 ML23129A4902023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E140BB, Revision N05, Sheet 2, Fcd Residual Heat Removal System ML23129A4672023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 6000302, P & I Diagram Augmented Offgas System, Sheet 1 ML23129A4892023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E589BB, High Pressure Coolant Injection System Functional Control Diagram, Sheet 3 NLS2023022, 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107f, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection2023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing ILE70-3, Sheet 107f, Installation Details - Temperature Detectors for Nuclear Boiler Systems Leak Detection ML23129A4992023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E471BB, Functional Control Diagram Control Rod Drive Hydraulic System, Sheet 1 ML23129A4852023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 730E805BA, Revision N01, Neutron Monitoring System Functional Control Diagram, Sheet 7 ML23129A4722023-04-20020 April 2023 1 to Updated Safety Analysis Report, Drawing 729E727BB, Recirculation Flow Control System, Sheet 1 2023-04-20
[Table view] |
Text
{{#Wiki_filter:1 2 3 DUCT 14' -6"x 9' -6" 4 5 6 '--.,____ _ _ _7_ _ _ _ __j_ _ _ _ _ s______,_____9_ _ _ _-'-_ _ _ _ 1o ____---'--____ 11_ _ _ _ ...J...__ _ _ _ 1_2_ _ _ ---,7 i-,
CONNECTING CONDENSER SHELLS CONDENSER I I R~S 1 "PS-4 1-0G-109-1 I
I A I A
,-- :--~7 10" SCREEN SAMPLE PUMP 0
VENT--.~*W',/ ' S-10 ASSEMBLY (17-107)
,,AVSPV-153
~ \ 0 10"-150MV
~VACUUM BREAKER 0 F-153AV NI lo °'~ ~- \I 1 ,* -no 0
"' - ;< I I MO I I/ I I I 1"0G-38 l"PS 4 7
(154AV) 3" I 150 ;:f fr'---::Jf--'\._'1,r--,-,.f;;,_.i--C-V---~*'7*1---..!..!::.=.:::.'.!:.._..j I
C
;:<-1 AR-2 1 "0.G:;-37 I (FL-1 ) 7 9
10 4
°'
N
- <(
N<Y
- <t N 1-AR-104-10 'L _ _ _ _ ~MS , - - - - - - - - - - - - - - - - - - - - o - G - - - 1 0 _ 7__-1---------------.'7.,.._ _ _ _-,..,, oG-ssv5 DWG 2008 I I I ZONE E-1 LUB-153AV I ,<<"' SAMPLE ~U~
OIL (154AV)
"'I
<( ~ 1-AR-103-11/2"
~- _ _
/Fi\ ~ LUB-155AV I
\..11_J
! AO (100) (156AV) iAVSPV-155 0 l"OG-36 f-{>
'--.,.._1+=-t--~--t><J---,p..-,..,,,__,,__,~-,,.--jO IL
~*=7 ~
155 B < > 103 *N
' F-155AV B
'----".--f '\.--1
' (156AV)
TP
u
. !~-----------,
11 85' 10 153 I ~-.,-__,,._VENT N I H OG-70 L : I
.--+-,-!;:"
.. o~ I
- C
,<< ~ 11/2'-1 s I II I ICC NUMBER: 5431815
. 0 r,+- AVSPV-166
., I ECM DRAFTER; NUMBER; DR--2022-oe12 AVSPV-165 ~ 11/,"-14 ...t- - - AO 86 83
"'------+---<
=..- __ I 154 q;9) OG-68 OG-69
*~ I II DUI
~ .,.
~ I I AL ASSIGNED ENG: RPDUIII 11/,"-15
~ L.__f'~'----'--'r-'-,
I _ .DAIE; 11/18/22
~
F-165AV '--f:a:J-' l'---l ~ I
~-, ~ OFF GAS
- ~~--------~ VACUUM PUMP U) j PS-4 *~
R IRMs\ SAMPLING (17-106)
~r 9 I
107< ~ < ~ 105 '7
,104 LUB-165AV AIR PURGE ' \.._.} CHAMBER 17-104 U) ., HYPODERMIC NEEDLE FOR SAMPLE BOTTLE r
-,j-0 CONN.
l1 "0G~132 1 "PS-4 1- /
L I
OFF -GAS VIAL U) 1-AR-100 . 1-0G-107-1 ~ Cl
., 14"AR-2
-1 0
SAMPLER)
DWG 2008 DWG 2008 DWG 2008 t17-136 C ZONE E-11 ZONE E-1 ZONE E-2 ! /TE\
\!:;:,/
I I
AO 165 ~ - - - - - - - - _ J L.J '----"'--_ _ ___,, ' - - - - ' _,' 1"0G-133 07 ' C 1 -+--_\
L --
1-AR-101 n 1 "QG-34
' 14"AR-2 :1"-19 '
?~
, 14" * ...
DWG 2008 y,:co c..,,.__c;:.':: 16sAv - I - F-166AV ZONE E-12 545 6"-D +;B_Y_M_S_D_D__ -C0~-1 14" ..1..r---;=,=o::::;--'f"7:---..J, 14"..L I ~,o~ ~-----------~
OFF-GAS SAMPLE RACK
'-----L-U_B___1_5_2_A_V_ _ _ ~..,j_ 166AV - - 166 OIL LUB-166AV 17-116 t
.-~---, ~----- I tioc ,
CD - - 151 AO 14" TO LOOP SEAL PIPE ON----. L.________ 54..6h1/4" AVSPV ---jOIL>-,._+-15-2-+--,-'"-.152AV FILTER SJ-EJTR-1A DWG. 2008 ~ - 152 F-152AV '--'-LO-- ,-TE, BY MSDD. CO. (17-457l I OG-(75) (17-458
-g ZONE D-2 JJ. r TF '
,. Ol 2" - 6" 1- C \BEE) 2" 2. c.o 2:cD 2" _
~
- - -,- fTF\
SEE _ _L:=:;a;5t:4~3f-.:,,,.Jl'--~524:'.4~=-<1s5**-'--{=J)--jr-TE\ OIL~ I RMls I ~8'*~ - ~ t-----M-:c~ _ _J ~ OG-TK-1 /LG\
STEAM JET AIR NOTE g SEE NOTE 9J ~ :3 tj~-i~I.O .8, *~ ...... 2" -6" ~ ,,-,_TE I
a, \...2-.J 17 STEAM JET AIR
~ . (!J -,&
.l (L.~__
(Th)~ {"ff 0
EJECTOR 1A I\ - 1st I ~ "' ~**u, EJECTOR 1B I
Cl b
D f..':.5. , __, STAGE "' ro SEE o,
CD-~22 J_ 5wN8 J '-- NOTE 9 (;J ~
,-' SIGHT I
SEE
' -'---l-f-L-~----------L..-, C I ~- ~--L.--------~~~~~--j GLASS NOTE SIGHi:---.,_ -c, GLASS INTER CONDENSER ~ ~i5 INTER CONDENSER AR-1 OWC(AR-1) r,
,--7 -
- NI I "'
<<wm_ ~---~-----------1 - CD-529
,-- CD-530 63 (36) 12" AR-1
1
. . I 1-AR-107-12
~---!:-~--c_D-{~><§j 0- - - - - j
)l 9~w co-s21: ~ - 1 1st 1 I 46 1 1/2' AR-115 11/," OWC(AR-1) FROM DWG SYSTEMS 1 __' .JiVIl tl,.f----
AVSPV-151 "' ci: 0 g;~o STAGE I
- J.,- INTEGRAL I .------{)e::J--------cc-cl:.,__._,_."------'==.._'_L__ 2091 SH 1 SEE DWG. 2037 l
I I
I""'
- I I CD-523 *o - <C I (40) 1z *"
FOR CONT. SEE I
I 1/1
I 11/2" AR-116 ZONE G-12 SEE DWG. 20051------i~
2" FDR-2 16" AR-2 1-----,1--"'A""R--"'1""0""5__..,.1-=-s----,
ZONE D-12 & H-11 INTEGRAL----f - ' FOR CONT. SEE
~
I I l ..- QJO L __ _J SH 2 ZONE D-3 DRAIN L __ .J DWG. 2008, I I DWG. 2008, f-UlN ZONE D-11 1"PS-4 I 60 -o COCK ZONE D-1 ' ~ f - ~ - . J I,__
f--,P~X+-,-- 1-t N 45 I
"' I I I (35) ~
<( " '
10 NI
.,.ro
*13 I
* <(
I ro
*""N L ____ _j I E
!~ E SEE '._SEE
"' 0 NOTE 9 NOTE 9 <( -
~ 1U1 1 "PS 4 10G1091,
'? '? ., "'
- r : ""1 I 4"AR-1 4"AR-1 S-242A, 4" I ~ N ' ~
S-242B, 4"
~ F f;:::
RUPTUREr--!Dit J
-,~Jl,1 "39 BY MSDD.
! I°'"'
II I BJ c~~DDI " - 4" 1 "40 / RUPTURE DISC PS-~ 1-AR-107-4 I co. ~ 1 "PS-4S r/ -
4" ,1, <( 4" - 3", f- 9 ~__,,, ,L.'"3--C}-'---..L.-r-"""'---,'I r
'1'
' 4" -~*f-*-
*** 1 "OG-92 1 -OG-108-1 f::::
~i~E 9 1!1.. r-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _712',"c,A,CR..,-,,2;-;;--.,-;;,Cl----'-1-"6-,"ArR,__-_,2'--j,*, V. 1 -AR-1 08-16 I A-0 I I (30) , - I (31) 11 [d'.
11 1 HH : [-
~(-29-)~[~-8-0--<: (28) - ~E 11,,~6~E 9 1-AR-108-12 Al 7 2nd V 2nd Y
RMS ,
[ 4" AG STAGE ly'.~
i-~~
r-- STAGE 54 , ,---, /PS TURBINE 15B 0
46 45 .... ,__ _,-.....- ~ ~ - - - - ~ - - - - - - , ~---~---~--~-~-, I IT : __ _J ~ AL I 1 BUILDING I
.,~ [- I 1
I 478 I I 47A.,,I AFTER CONDENSER AFTER CONDENSER ::'.:=---,
~l:t--i ~ "7 4" II I\ A
"'I OIL I I MO L .T,93 .T.95 I : 68 *
> I L_ill:J - - - - SEE _/LJ1_E_;
L-,-~.~J 69 C 163
- ,; 1--.:__SEE .. NOTE 7 I 0
(ll
_,"c-,~M!'.o, NOTE 7 FROM 3 0
't-* 161 ~
1 ----2, 47B TO FR-47 I- r-::=l 33 8" 8"
,,.--'---=ff-"..L_ _--1: I nJ I: -
ZONE F-5 LUB-157AV AO ~ NOTE 96 163MV 14"'AR 2 st 1
- L _____ ~ AVSPV-15~. - ..__r--,. ZONE F-2 ~ 11 I 47A OILf----f---:'::";-fr>a.."'
------------0 157 ' - _ .....
'----1-.j ~ L_ _ _ T_ -~ I "' 12" ' (_ THROTTLEDNOTE l~I- - - ~
p~ -
I F I F-157AV J__ 12CV ~~A 1-A 11 a, 0 F
~-.
4"AR-1 1-AR-107-4 I 4"AR-1 RMS I BY W.E. CO.
"'I
<(
@-7-0:
I 1-----------7 i tA . .. ..
I r-----------..J'---__J I
12"AR-2 1-AR-108-12 [- A I NOTES:
I ~ I
- 1. UNLESS DESIGNATED OTHERWISE ALL AIR REMOVAL PIPING
~
70 71. J MIO l..r(OC ON THIS DWG IS AR-1.
lO'"AR-2 1-AR-108-10 1/2"-26' 7 I M
- 2. UNLESS OTHERWISE INDICATED ALL PRESSURE AND/OR FLOW
~~ ~ '734 8"[K] 164 INSTRUMENT ROOT LINES SHALL BE 3/4", ROOT VALVES TO
- r N
GLAND EXHAUSTERS I , ** 1 *;. 97 18"164MV BE 3/4" V253X. LINE UP TO AND INCLUDING ROOT VALVE SHALL 11/2" VENT
"' NOTE
- In.JI SB~---g
;< 11 ~ BE FURNISHED AND INSTALLED UNDER CONTRACT E69-4.
~~ o rfO
','C THROTTLED NOTE 3. FOR DETAILS ON CONDENSER CONNECTIONS SEE CORRESPONDING r------~----------------- ---7 r------ ________________ ___,: - r - - - - - 1 LUB-160AV F-160AV '
MCCF 1-8 11 DESIGNATIONS ON MS & DD CO, DWG. DC-93877 GA 3 SH. 3 T 'l foiLl 13CV T ~
12"1 OCV '
- ..__ I AO I ,. -...,_____,,_
**~
- 12**11cv 10"160Av".:::' AO ** 1 ** '--.: ;:r1 'T' 'T'
' _f 1
10"159AV 159 i >-] 4. NOT USED.
G I 'r I
160 I VENT~
11/," "'r-- -] 5. ITEMS IDENTIFIED BY (17- ) ARE FURNISHED BY GENERAL ELECTRIC G l __
I I r----------T---7 BY W.E. CO.
MECHANICAL I (,) 3"0VERFLOW - ~ ~ MECHANICAL I G) 3"0VERFLOW ~ ~ AVSPV-160 I I
- 6. ALL VALVE, INSTRUMENT OR EQUIPMENT NUMBERS IN PARENTHESIS (B)ERS LJ
' I SEE I
PI PT
~ ~ 7'J I I ~ -]
I VACUUM PUMP 1A I VACUUM PUMP 1B I NOTE 202 89 ARE NUMBERS TO BE USED IN OPERATING PROCEDURES. THESE NUM STUFFING TANK J"', I T I ARE ASSIGNED BY NPPD AND WILL NOT BE SHOWN ON PIPING DWGS Lr 1
I (,) I STUFFING I ~_w__ i-_1_.e __l'/.. __ LE_J BOX DRAINS (SEE NASH DWG.
14-1865) 1
~2
~186 11/," I -
lt=j I RMS OIL LUB-159AV BOX DRAINS (SEE NASH DWG. ~ ;,.;"' TANK 14-1865) 12 I ,-.
'i 11/2 .I. -
1
'°
,i o VENT I aMS 65 -]
- 7. REFERENCE DWG. 1550-Xl 03 FOR INSTRUMENT PIPING AND VALVE INSTALLATION AT INSTRUMENT RACK 1E.
(,) (,)
Ifii ,__ -"sTNR-MVTA - 0'27 G) G)
I fii STNR-MVTB *
~
-] 8. ALL VALVES ARE IN THE AIR REMOVAL (AR) SYSTEM UNLESS DESIGNATED OTHERWISE.
24 "'I (32) 9. THE START UP POSITION FOR VALVES AR-V-10, 11, 12, 13, CD-V-524, 1
3/4 ~ "' 3/4"22 ' 3/4"'23 y,** 11/2'25~ i 525,543 AND 544 ASSUMES RED SET IN SERVICE.
L _______________
20 ' '3/4" 21
*------------~ 0
! 0
------ -- -------- _____________ J
- - 10. WHERE LINES ARE INTERCONNECTED AND CONTINUED ON OTHER DRAWINGS, ZONE NUMBERS ARE APPROXIMATE ONLY.
V3/4" DR-5 3/4"DR-5 "j'
'-.--'----_J ---~ 108"
.__,______,,~ "' 11. GLAND STEAM EXHAUSTER FLEX HOSES INSTALLED BY CED 6015260.
3/4"DR-5 o
'-3/4" DR-5
--r:~1-
"TO VENT GLAND STEAM CONDENSER I
U)
H I TO FLOOR TO FLOOR NOTE: H i5 DRAIN AVSPV-159 U)
DRAIN
- - ALL ITEMS MARKED THUS 0 ARE "AS BUILT"' ITEMS AND ARE NOT I
SHOWN ON PIPING DRAWINGS.
RMS I I
i5 1 " BW-1 S MAKEUP ) ';... 1" 1" FROM DWG.
'-------'--1=D~w,'---"-1~1"'1-"--"1=--:--"----------------_L_------'--;,, 2013 ZONE F-8 MAIN STEAM LINE - - - I L - - - - - - - - - - HIGH-HIGH RADIATION - - - - - - - - - - - - - - - - l_ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _J AS BUILT SHUT-DOWN 1'
454003592 STATUS: Release STATUS DATE: 01/12/2023 DS APPROVED: RPDURR VER: AG REV: 36 SIZE: F J REVISIONS TO THIS DRAWING SIGNlflCANT NUhEIER DRAWN DATE J
REQUIRES A REVISION TO THE RRT 1/21/02 CORRESPONDING ISOKEY.
GROUP 2
' 5
' CHECl<ED DATE BURNS & ROE a,
NO.
VERSIONS/REVISIONS BY NPPD DESCRIPTION ORDER OFT DATE ENG COOPER NUCLEAR STATION 0 a,
r--
AC 33 DR-2022-0019 AD 34 DR-2022-0019 CC [NSTALLATION CC REMOVAL 5431615 OJB 1 10 2 GLHADL.E 5431615 DJB O 12 22 GLHADLE FLOW DIAGRAM APPROVED DATE Sff ~E~grnrn 0
0 AE 35 DR-2022-0512 CC [NSTALLATJON 5431615 DLR 1 16 RPDURR AIR REMOVAL SYSTEM f - - - ~ - - - ' - - - - - - - - - - - 1 ~u C 2009 AG 36 DR-2022-0001 - OJB 1 12 2 RPDURR FIL.MED 1 2 3 4 5 6 7 8 9 10 11 12}}