PMNS20230223, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4
Letter Sequence Meeting | |
---|---|
EPID:L-2022-LLA-0105, 2021 Annual Radiological Environmental Operating Report (Withdrawn, Closed) | |
Initiation Administration Questions
| |
MONTHYEARL-2022-073, Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-0042022-05-0303 May 2022
[Table View]Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 Project stage: Request L-2022-070, 2021 Annual Radiological Environmental Operating Report2022-05-0303 May 2022 2021 Annual Radiological Environmental Operating Report Project stage: Request ML22251A1732022-09-0808 September 2022 Staff Presentation Slides for Turkey Point Di&C LAR Acceptance Review Public Meeting, September 13, 2022 Project stage: Acceptance Review PMNS20220930, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Acceptance Review of the Turkey Point Digital Instrumentation and Controls License Amendment Request2022-09-0808 September 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Acceptance Review of the Turkey Point Digital Instrumentation and Controls License Amendment Request Project stage: Acceptance Review ML22276A2332022-09-0808 September 2022, 13 September 2022, 15 September 2022, 6 October 2022 Summary of September 13, 2022, Public Meeting with FPL on Turkey Point to Discuss Acceptance Review Issues of Di&C LAR 274 Project stage: Request ML22276A0172022-09-13013 September 2022 Transcript of September 13, 2022 Public Meeting Meeting Between the NRC and Florida Power & Light Company (FPL) to Discuss Acceptance Review Issues of Di&C LAR 274 Project stage: Meeting L-2022-151, Evacuation Time Estimate Study2022-09-15015 September 2022 Evacuation Time Estimate Study Project stage: Request ML22258A1862022-09-15015 September 2022 NRR E-mail Capture - Turkey Point Unit Nos. 3 and 4 - Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Requests to Replace Instrumentation with Digital Systems Project stage: Acceptance Review ML22255A0502022-09-15015 September 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Replace Instrumentation with Digital Systems Project stage: Acceptance Review L-2022-166, Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement2022-10-0505 October 2022 Response to Request for Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project stage: Supplement ML22276A2302022-10-0606 October 2022 Summary of September 13, 2022, Public Meeting with FPL Concerning Supplemental Information Needed for Acceptance of License Amendment Request to Replace Instrumentation with Digital Systems on Turkey Point, Units 3 and 4 Project stage: Acceptance Review ML22280A1082022-10-13013 October 2022 Acceptance of Requested Licensing Action License Amendment Requests to Replace Instrumentation with Digital Systems Project stage: Acceptance Review PMNS20221243, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 32022-12-0202 December 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and Project stage: Meeting ML22349A0022022-12-0202 December 2022, 5 January 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 Project stage: Request ML22322A1812022-12-15015 December 2022 Audit Plan for Turkey Point Digital I&C License Amendment Request (Public Version) Project stage: Other ML22349A0012023-01-0505 January 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 Project stage: Meeting L-2023-004, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results2023-01-17017 January 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of Huma Factors Results Project stage: Supplement PMNS20230049, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-01-27027 January 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Project stage: Meeting L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis2023-02-10010 February 2023 Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis Project stage: Supplement PMNS20230168, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-02-22022 February 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Project stage: Meeting ML23058A4402023-02-22022 February 2023, 2 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Unit Nos. 3 and 4 Project stage: Request ML23048A0492023-03-0303 March 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 Project stage: Meeting PMNS20230223, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-0606 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Project stage: Meeting ML23108A2812023-03-0606 March 2023, 2 May 2023 April 14 2023 Public Meeting Summary for Turkey Point Digital I&C License Amendment Request Project stage: Request PMNS20230253, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-04-0707 April 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Project stage: Meeting ML23068A0712023-04-28028 April 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 (EPID L-2022-LLA-0105) - Nonproprietary Project stage: Meeting ML23087A0692023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 Project stage: Meeting ML23058A4262023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units 3 and 4 Project stage: Meeting ML23108A2752023-05-0202 May 2023 Summary of Audit Meeting with Florida Power and Light Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Turkey Point, Units Nos. 3 and 4 Project stage: Meeting L-2023-086, Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation.2023-06-28028 June 2023 Request Temporary Suspension of Turkey Point License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation. Project stage: Request ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary Project stage: Other ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System Project stage: Other L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project Project stage: Withdrawal ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request Project stage: Withdrawal 2023-01-05 |
ML23065A009 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 03/06/2023 |
From: | Office of Nuclear Reactor Regulation |
To: | |
References | |
PMNS20230223 | |
Download: ML23065A009 (3) | |
Similar Documents at Turkey Point | |
---|---|
Category:Meeting Notice
MONTHYEARPMNS20240533, Plants - 2023 Annual Assessment Meeting2024-04-12012 April 2024
[Table view]Plants - 2023 Annual Assessment Meeting PMNS20240303, Notice of Meeting with NextEra Energy/Florida Power & Light Regarding License Amendment Request to Create a Fleet Emergency Plan2024-03-0606 March 2024 Notice of Meeting with NextEra Energy/Florida Power & Light Regarding License Amendment Request to Create a Fleet Emergency Plan PMNS20230969, Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement2023-09-0707 September 2023 Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement PMNS20230973, Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement2023-09-0707 September 2023 Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement PMNS20230932, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-14014 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230879, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-0101 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230809, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-07-11011 July 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230775, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-30030 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230732, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle for Turkey Point Generating Unit Nos. 3 and 42023-06-26026 June 2023 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle for Turkey Point Generating Unit Nos. 3 and 4 PMNS20230718, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-12012 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230673, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-26026 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230599, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-15015 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230594, Annual Assessment Meeting2023-05-0404 May 2023 Annual Assessment Meeting PMNS20230447, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-04-20020 April 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230449, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-18018 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230409, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-11011 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230253, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-04-0707 April 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230278, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-0303 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230308, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-27027 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230226, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-03-0707 March 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230223, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-0606 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230192, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-0101 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230168, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-02-22022 February 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230134, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-02-22022 February 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230159, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-02-15015 February 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230049, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-01-27027 January 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-26026 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230060, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-18018 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230003, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-0505 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221243, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 32022-12-0202 December 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and PMNS20221177, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle Turkey Point Generating Unit Nos. 3 and 42022-11-22022 November 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle Turkey Point Generating Unit Nos. 3 and 4 PMNS20221132, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-31031 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-17017 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221057, Meeting Between the U.S. Nuclear Regulatory Commission and Florida Power & Light Company to Discuss Review of Digital Instrumentation and Controls License Amendment Requests for Turkey Point Nuclear Generating, Units 3 and 42022-10-11011 October 2022 Meeting Between the U.S. Nuclear Regulatory Commission and Florida Power & Light Company to Discuss Review of Digital Instrumentation and Controls License Amendment Requests for Turkey Point Nuclear Generating, Units 3 and 4 PMNS20220997, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-0303 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20220876, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Review of Defense-in-Depth and Diversity (D3) Evaluation for Turkey Point Nuclear Generating, Units 3 and 4 (Turkey Point)2022-09-22022 September 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Review of Defense-in-Depth and Diversity (D3) Evaluation for Turkey Point Nuclear Generating, Units 3 and 4 (Turkey Point) PMNS20220998, Notice of Meeting with Florida Power and Light Company (FPL) Regarding Turkey Point Setpoint Methodologies as It Relates to the Improved Technical Specification (ITS) Conversion License Amendment Request2022-09-22022 September 2022 Notice of Meeting with Florida Power and Light Company (FPL) Regarding Turkey Point Setpoint Methodologies as It Relates to the Improved Technical Specification (ITS) Conversion License Amendment Request PMNS20220935, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-09-0909 September 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220930, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Acceptance Review of the Turkey Point Digital Instrumentation and Controls License Amendment Request2022-09-0808 September 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Acceptance Review of the Turkey Point Digital Instrumentation and Controls License Amendment Request PMNS20220832, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-16016 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220799, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and2022-08-16016 August 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and 4 PMNS20220748, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-0303 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220701, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-07-14014 July 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220683, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-28028 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220609, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-14014 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220582, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 42022-06-10010 June 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 4 PMNS20220592, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-0606 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220454, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-05-17017 May 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220478, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 42022-05-11011 May 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 4 PMNS20220468, Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company2022-05-0404 May 2022 Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company 2024-04-12 Category:Meeting Agenda MONTHYEARPMNS20240533, Plants - 2023 Annual Assessment Meeting2024-04-12012 April 2024
[Table view]Plants - 2023 Annual Assessment Meeting ML24073A3372024-03-13013 March 2024 NextEra - NRC Slides for the Public Meeting on March 19, 2024 Regarding Emergency Plan Licensing Amendment PMNS20240303, Notice of Meeting with NextEra Energy/Florida Power & Light Regarding License Amendment Request to Create a Fleet Emergency Plan2024-03-0606 March 2024 Notice of Meeting with NextEra Energy/Florida Power & Light Regarding License Amendment Request to Create a Fleet Emergency Plan PMNS20230973, Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement2023-09-0707 September 2023 Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement PMNS20230969, Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement2023-09-0707 September 2023 Public Meeting to Receive Comments on the Draft Site-Specific Turkey Point Environmental Impact Statement PMNS20230932, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-14014 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230879, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-0101 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230809, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-07-11011 July 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230775, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-30030 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230732, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle for Turkey Point Generating Unit Nos. 3 and 42023-06-26026 June 2023 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle for Turkey Point Generating Unit Nos. 3 and 4 PMNS20230718, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-12012 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230673, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-26026 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230599, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-15015 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230594, Annual Assessment Meeting2023-05-0404 May 2023 Annual Assessment Meeting PMNS20230447, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-04-20020 April 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230449, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-18018 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230409, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-11011 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230253, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-04-0707 April 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230278, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-0303 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230308, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-27027 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230226, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-03-0707 March 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230223, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-0606 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230192, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-03-0101 March 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230168, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-02-22022 February 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230134, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-02-22022 February 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230159, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-02-15015 February 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230049, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 42023-01-27027 January 2023 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4 PMNS20230080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-26026 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230060, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-18018 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230003, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-0505 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221243, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 32022-12-0202 December 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Planned Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and PMNS20221177, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle Turkey Point Generating Unit Nos. 3 and 42022-11-22022 November 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request for Transition to a 24-month Fuel Cycle Turkey Point Generating Unit Nos. 3 and 4 PMNS20221132, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-31031 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-17017 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221057, Meeting Between the U.S. Nuclear Regulatory Commission and Florida Power & Light Company to Discuss Review of Digital Instrumentation and Controls License Amendment Requests for Turkey Point Nuclear Generating, Units 3 and 42022-10-11011 October 2022 Meeting Between the U.S. Nuclear Regulatory Commission and Florida Power & Light Company to Discuss Review of Digital Instrumentation and Controls License Amendment Requests for Turkey Point Nuclear Generating, Units 3 and 4 PMNS20220997, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-0303 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20220998, Notice of Meeting with Florida Power and Light Company (FPL) Regarding Turkey Point Setpoint Methodologies as It Relates to the Improved Technical Specification (ITS) Conversion License Amendment Request2022-09-22022 September 2022 Notice of Meeting with Florida Power and Light Company (FPL) Regarding Turkey Point Setpoint Methodologies as It Relates to the Improved Technical Specification (ITS) Conversion License Amendment Request PMNS20220876, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Review of Defense-in-Depth and Diversity (D3) Evaluation for Turkey Point Nuclear Generating, Units 3 and 4 (Turkey Point)2022-09-22022 September 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Review of Defense-in-Depth and Diversity (D3) Evaluation for Turkey Point Nuclear Generating, Units 3 and 4 (Turkey Point) PMNS20220935, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-09-0909 September 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220930, Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Acceptance Review of the Turkey Point Digital Instrumentation and Controls License Amendment Request2022-09-0808 September 2022 Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss Acceptance Review of the Turkey Point Digital Instrumentation and Controls License Amendment Request ML22227A1302022-08-17017 August 2022 License Amendment Request Reactor Trip Breaker Completion Time Extension - Public Meeting August 17, 2022 (EPID L-2022-LRM-0061) (Slides) PMNS20220799, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and2022-08-16016 August 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Extend the Completion Time for an Inoperable Reactor Trip Breaker for the Turkey Point Generating, Unit Nos. 3 and 4 PMNS20220832, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-16016 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220748, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-0303 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220701, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-07-14014 July 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220683, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-28028 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request ML22172A2172022-06-22022 June 2022 LAR: Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) PMNS20220609, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-14014 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request PMNS20220582, Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 42022-06-10010 June 2022 Pre-submittal Meeting with NextEra Energy/Florida Power & Light Company to Discuss a Planned License Amendment Request to Replace Reactor Coolant Pump Seals for the Turkey Point Generating Unit Nos. 3 and 4 PMNS20220592, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request2022-06-0606 June 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the Turkey Point Nuclear Generating Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Request 2024-04-12 |
Text
March 06, 2023
Title:
Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power &
Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4
Date(s) and Time(s):March 24, 2023, 01:00 PM to 03:00 PM ET
Location: Teleconference
Category: This is a Closed meeting. Contains trade secrets and commercial or financial information (proprietary information).
Purpose:
NextEra Energy/Florida Power & Light Company (NextEra/FPL) and the U.S. Nuclear Regulatory Commission (NRC) will discuss the Digital Instrumentation and Controls license amendment request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4.
Contact:
Ed Miller Michael Marshall 301-415-2481 301-415-2871 ed.miller@nrc.gov michael.marshall@nrc.gov
Participants:
NRC External Ed Miller, Office of Nuclear Reactor Jarrett Mack, NextEra Energy, FPL Regulation
Docket No: 05000250 05000251
The NRC provides reasonable accommodations to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in a meeting or need a meeting notice or the transcript or other information from a meeting in another format (e.g. braille, large print), please contact Anne Silk, NRC Reasonable Accommodations Coordinator, at Anne.Silk@nrc.gov or call directly at 301-287-0745.
Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Ten (10) days advance notice is requested to try to ensure availability; however, every effort will be made to address a request for reasonable accommodations with less notice.
CLOSED MEETING AGENDA Meeting Between the U.S. Nuclear Regulatory Commission (NRC) and Florida Power & Light Company (FPL) to Discuss the Digital Instrumentation and Controls License Amendment Request for Turkey Point Nuclear Generating, Unit Nos. 3 and 4
March 24, 2023, 01:00 PM to 03:00 PM ET
Teleconference ADAMS Accession Number: ML23065A009
Distribution:
Office NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-1/PM Name GEMiller KGoldstein DWrona GEMiller Date 03/06/2023 03/06/2023 03/06/2023 03/06/2023 OFFICIAL RECORD COPY