MONTHYEARML24319A1602024-11-14014 November 2024 Meeting Handouts - Overview of the Rulemaking Process - PRM Emphasis ML24309A2742024-11-0404 November 2024 Slides for the November 6, 2024, Public Information Meeting on the Draft White Paper on Nth-of-a-Kind Microreactor Licensing and Deployment Considerations ML24282A9632024-10-0303 October 2024 S8P1-Sircar-Wang - NRC LBSM80 Workshop ML24267A2452024-09-23023 September 2024 Session 3- Stakeholder Engagement - Advance Act of 2024, Section 401 ML24261B9742024-09-17017 September 2024 Master Slide Deck - Advanced Reactor Stakeholder Meeting - 2024-09-18 ML24248A2152024-09-0404 September 2024 Adapting Successful Hazard Analysis Approaches to New Hazards at the Nuclear Regulatory Commission ML24241A2342024-08-28028 August 2024 Bdh LIP Aug 29 2024 (002) - Final ML24218A1922024-07-30030 July 2024 NRC Presentation for 7-30-24 Public Meeting RG 1.247 Finalization Plan ML24205A0202024-07-23023 July 2024 5 - RG 1.59 - Appendix K - Consideration for Applying Guidance to Advanced Reactor and Small Modular Reactors - Stakeholders Meeting 07/24/2024 ML24205A0212024-07-23023 July 2024 1-Insights from 07-18-24 Workshop on Risk Metrics and Reliability Data to Support Risk-Informed Program for Advanced Reactors ML24205A0222024-07-23023 July 2024 Master Slide - Advanced Reactor Stakeholder Public Meeting - 2024-07-24 ML24205A0192024-07-23023 July 2024 6-Licensing and Deployment Considerations for Noak Micro-Reactors - AR Stakeholders Meeting July 24 2024 ML24192A1272024-07-10010 July 2024 Scale and Melcor non-LWR Fuel Cycle Demonstration Project - MSR ML24193A0772024-07-0909 July 2024 Nice ASME NQA-1 International Working Group (Iwg) - Emea (Europe, Middle East, & Africa) Iwg Trip Report Part 21 Presentation ML24190A1462024-07-0808 July 2024 Arcop Ws 4 Ppt - Public ML24173A1532024-06-27027 June 2024 20 - EPRI-NRC Cooperative Research Project: PWSCC Crack Initiation Characterization of Alloys 600/182 and Alloys 690/52/152-2024 Overview and Status ML24172A3052024-06-27027 June 2024 NRC- Perspective on ASME Code Efforts ML24172A3062024-06-27027 June 2024 Risk-Informing Materials Issues Risk Insights for Materials Issues NRC Perspective ML24163A0422024-06-11011 June 2024 Arcop Ws 3 Exercise Participant Handout ML24163A0412024-06-11011 June 2024 Arcop Ws 3 Exercise NRC Facilitator Handout ML24017A2992024-05-29029 May 2024 Public Meeting with the Nuclear Energy Institue (NEI) Regulatory Issue Task Force Presentation Slides, May 29, 2024 ML24144A1832024-05-23023 May 2024 Advanced Reactor Stakeholder Meeting 2024-05-23 ML24143A0802024-05-22022 May 2024 Arcap ISG Documents and Ticap Guidance Final Documents ML24142A5492024-05-21021 May 2024 Adv Rx Stakeholders - Risk Metrics Workshop - Rev 2 ML24142A5512024-05-21021 May 2024 Path Forward - Arsm Slides for 5-23-24 ML24141A1552024-05-20020 May 2024 NRC Slides Micro-Reactor Licensing May 23 2024 Advanced Reactor Stakeholder Meeting ML24123A2172024-05-15015 May 2024 Research Test Rx Construction Workshop Date 5.15.25 - Public ML24131A0142024-05-14014 May 2024 NRC Slides Micro-Reactor Licensing 5_14_24 Public Meeting ML24129A0752024-05-0808 May 2024 Arcop Work Shop 3 May 7 Version ML24122C6322024-05-0101 May 2024 ROP Bi-Monthly Meeting Slides on IP93100 Revision Update ML24052A2232024-03-14014 March 2024 Regulatory Information Conference (RIC) 2024 - Digital Exhibit - the NRC Is Advanced Reactor Ready! ML24030A6732024-03-13013 March 2024 RIC 2024 Krepel Presentation Adapting to a Changing Landscape ML24067A2572024-03-12012 March 2024 RIC-2024 W14 Slides - NRC Rtaylor Chair Opening Remarks ML24067A2582024-03-12012 March 2024 RIC-2024 W14 Slides - NRC Ncoovert and Jgreives Future of Construction Oversight ML24040A1832024-03-12012 March 2024 RIC 2024 T4 Slides - Vhuckabay Spent Fuel Reprocessing: Past, Present, and Future ML24149A1492024-03-12012 March 2024 Enclosure 1 - 36th Annual RIC Presentation - Opening Remarks & Fulfilling the Mission Today and Tomorrow - Miranda Ross ML24067A0102024-03-0808 March 2024 4 - NRC - Workshop3 - EQ Presentation - Final ML24043A1812024-02-14014 February 2024 Lessons Learned Report Slides Public Meeting on 2-14-24 Rev1 ML24030A0092024-02-14014 February 2024 Lessons Learned Report Slides Public Meeting on 2/14/2024 ML23338A2792023-11-30030 November 2023 Technology-Inclusive, Risk-Informed, and Performance-Based Licensing Approaches ML23306A1262023-11-0707 November 2023 Terrapower Public Outreach Meeting Wyoming Final (1) ML23298A1342023-10-27027 October 2023 DG-4034 (RG 4-7 Rev 4) Presentation on Population-Related Siting Oct 27 2023 ML23270B9282023-09-28028 September 2023 50.72 Aug 9 2023 Public Meeting Slides ML23256A0012023-09-20020 September 2023 Generic Issues Program Presentation - ROP Public Meeting ML23250A1292023-09-11011 September 2023 NRC Staff Presentation on the NRC Draft White Paper on Licensing and Deployment Considerations for Factory-Fabricated Micro-Reactors ML23219A1382023-08-0707 August 2023 50.72 Rulemaking Update ML23200A3392023-06-21021 June 2023 National Organization of Test, Research, and Training Reactors 2023 Annual Conference Presentation by Travis Tate on Non-power Production and Utilization Facilities Oversight ML23200A3372023-06-21021 June 2023 National Organization of Test, Research, and Training Reactors 2023 Annual Conference Presentation by Josh Borromeo on Non-power Production and Utilization Facilities and Advanced Reactors Licensing ML23200A3432023-06-19019 June 2023 National Organization of Test, Research, and Training Reactors 2023 Annual Conference Presentation by Beth Reed on Physical Security Event Notification and Suspicious Activity Reporting Rule ML23200A3422023-06-19019 June 2023 National Organization of Test, Research, and Training Reactors 2023 Annual Conference Presentation by Beth Reed on Secy Option Paper for Enhanced Security of Special Nuclear Material 2024-09-04
[Table view]Some use of "" in your query was not closed by a matching "". |
Text
RG 1.247:
ACCEPTABILITY OF PRA RESULTS FOR NLWR RISK INFORMED ACTIVITIES November 8, 2022 public meeting
BACKGROUND RG 1.247 endorses :
ASME/ANS RA-S-1.4-2021, Probabilistic Risk Assessment Standard for Advanced Non Light Water Reactor Nuclear Power Plants NEI 20-09, Performance of PRA Peer Reviews Using the ASME/ANS Advanced Non-LWR PRA Standard Provides guidance on one acceptable approach the NRC staff has developed for determining whether a design-specific or plant-specific PRA used to support an application is sufficient to provide confidence in the results.
ACRS Full Meetings-SC September 20, 2021; FC October 5, 2021.
ACRS concluded that RG 1.247 was acceptable for release on a trial basis.
RG issued for trial use in March 2022 Public comment period ended May 23, 2022 FRN published October 17, 2022 (87 FR 62894)
COMMENT PERIOD Comments received from Nuclear Energy Institute (NEI) and X-energy Staff considers the comments on HLR-HR-E and HR-E4 significant to the extent they warrant a response to clarify the record.
No changes made to the TRG NRC staff will consider other comments in preparing a final draft of RG 1.247, and will consider the experience obtained through trial use of the RG.
COMMENTS ON ERRORS OF COMMISSION RG 1.247 takes exceptions to the ASME and ANS NLWR PRA standard regarding the treatment of errors of commission (EOCs) in a PRA.
The exceptions provide for consideration of EOCs that result in adverse safety impacts for Capability Category I, (CC-I). CC-I defines the minimum capability needed for a PRA element. In contrast, Capability Category II (CC-II) defines the minimum capability needed to meet current good practice standards for each PRA element.
The comments indicate that these exceptions are not consistent with the current PRA state of practice, and broadly considering EOCs goes above and beyond the requirement for the current operating fleet.
COMMENT ON ERRORS OF COMMISSION -
STAFF RESPONSE The staff is keeping the exceptions related to EOCs in this trial use RG.
Because there is limited operating experience regarding EOCs for NLWRs and the scope of the ASME/ANS NLWR PRA standard is broader than the scope of the ASME/ANS Level 1/LERF LWR PRA standard, EOCs may play a more important role in NLWR PRA than for LWR PRA and, therefore, NLWR PRA developers will need to address that EOCs are not an issue before eliminating them from consideration.
The staff notes that such identification of EOCs is generally expected to apply to a PRA developed for the operational phase of a plant's lifecycle. Related staff guidance on the treatment of such EOCs during pre-operational phases of a plant's lifecycle is currently under development.
Various studies, methods and references have been used to provide guidance on the use of EOCs (e.g., NUREG-2198, NUREG/CR 7017, ATHEANA, IDHEAS-ECA).
TRIAL USE COMMENTS No.
Requirement comment 1
HL-HR-E, HR-E4 The clarifications on HLR-HR-E and HR-E4 (EOCs) are not consistent with the current PRA State of practice and represents a new requirement above and beyond the requirement for the current operating fleet 2
POS-A8 Suggests POS review by operations personnel even for early pre-operational PRAs.
Some PRA developers may not have operations personnel available at earlier phases in the design process.
3 HR-D4 The clarification may be appropriate for operating plants but not for plants in the early design phase where procedures may not be fully developed.
TRIAL USE COMMENTS No.
Requirement comment 4
WFR-I1 The clarification on WFR-I1 is redundant to item b) of WFRI1. Documentation of the dominant failure mode covers f, the method of analyses covers g and the sources of information covers h.
5 General sections Guidance on PRA acceptability for construction permit applicants would be appreciated.
6 The analysis elements in the RG do not align with the high level requirements in the standard. The RG separates the standard sub-element for Protective Action Parameters and Other Site Data Analysis into site characterization and protective action analysis. The 50 mile site characterization will not be required for all risk-informed applications.
TRIAL USE COMMENTS No.
Requirement comment 7
Sect.2.2 The definition of feasible provided here may be appropriate for the HRA requirements within the standard, HLR-DA-D also uses the word feasible in a manner not consistent with the proposed definition 8
IE-C9 Editorial-missing parenthesis 9
HR-G1 Added expectations of feasibility studies 10 HR-E4 Errors of commission-inconsistency with current state of the practice 11 Addressing NRCs non-endorsement of supporting requirements addressing reporting thresholds
NEXT STEPS RG Trial Use period Approximately two years Allow time to incorporate any changes related to revision of the NLWR Standard Incorporate changes/comments that arise from trial use Potential PRA peer review observations