MONTHYEARML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML22270A2372022-09-26026 September 2022 Form 5.1-1 Post Exam Checklist IR 05000282/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000282/2022301; 05000306/2022301 ML22249A0062022-08-26026 August 2022 2.1-1 Examination Preparation Checklist for Prairie Island 08092022 ML22270A2252022-08-26026 August 2022 Ile Security Agreement - Final ML22249A0072022-08-19019 August 2022 Ile 2022 Post Exam Comments Letter ML22213A1852022-08-0808 August 2022 Plan, Operator Licensing Examination Approval ML22237A3022022-08-0808 August 2022 Ile 2.3-2 ML22237A3032022-08-0808 August 2022 Ile 2.3-4 ML22166A3892022-07-28028 July 2022 Issuance of Amendments 239 and 227 24-Month Operating Cycle ML22174A3902022-06-27027 June 2022 Licensed Operator Positive Fitness-For-Duty Test ML22237A3012022-05-27027 May 2022 Ile Licensee Letter Transmitting Proposed Exam and Test ML22242A3032022-03-24024 March 2022 2.3-1 Exam Outline Quality Checklist ML22242A3072022-03-24024 March 2022 3.4-1 Scenario Events & Evolutions Checklist RO & SRO ML22027A8012022-01-27027 January 2022 Confirmation of Initial License Examination ML21121A0002021-04-27027 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21110A5922021-04-19019 April 2021 GFE Results, March 2021 ML21082A4892021-03-23023 March 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000282/20203012020-09-22022 September 2020 NRC Initial License Examination Report 05000282/2020301 and 05000306/2020301 ML20265A1722020-09-21021 September 2020 ES-201-1 L-PI-20-048, Post Exam Comments2020-09-21021 September 2020 Post Exam Comments ML20265A1802020-09-21021 September 2020 ES-403-1 L-PI-20-053, ES-201-32020-09-18018 September 2020 ES-201-3 ML20245E5482020-08-27027 August 2020 ES-D-1, Scenario Outline ML20252A2542020-08-27027 August 2020 Proposed facility-developed RO-SRO Written Examination ML20245E5792020-08-27027 August 2020 ES-301-6 ML20246G7462020-08-27027 August 2020 Ile As-Administered RO Admin JPMs ML20246G7432020-08-27027 August 2020 Ile As-Administered In-Plant JPMs ML20246G7322020-08-27027 August 2020 Ile As-Administered Simulator JPMs ML20245E5632020-08-27027 August 2020 ES-301-7 ML20245E5582020-08-27027 August 2020 ES-401-2, 3, 4, PWR Examination Outline ML20245E5822020-08-27027 August 2020 ES-201-2, Examination Outline Quality Checklist ML20245E5802020-08-27027 August 2020 75 Day Letter ML20245E5812020-08-27027 August 2020 ES-301-5, Transient and Event Checklist ML20252A2512020-08-27027 August 2020 Proposed Operating Test - Dynamic Simulator Scenarios ML20245E5692020-08-27027 August 2020 ES-401-9 ML20252A2482020-08-27027 August 2020 Proposed Operating Test - Walkthrough Portion JPMs ML20246G7542020-08-27027 August 2020 Ile As-Administered Scenarios ML20245E5702020-08-27027 August 2020 NRC Comments and Resolution on Licensee Outlines ML20245E5662020-08-27027 August 2020 ES-401-6 ML20245E5762020-08-27027 August 2020 ES-301-4 ML20246G7342020-08-27027 August 2020 Ile As-Administered SRO Admin JPMs ML20246G7402020-08-27027 August 2020 Ile As-Administered Written Exam ML20245E5742020-08-27027 August 2020 ES-301-3 ML20245E5642020-08-27027 August 2020 ES-401-4 ML20258A0162020-08-27027 August 2020 ES-401-6 ML20245E5452020-08-27027 August 2020 ES-301-1 and ES-301-2, Administrative Topics Outline ML20219A8402020-08-0707 August 2020 Operator Licensing Examination Approval ML20076F0592020-03-16016 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML20023A2342020-01-23023 January 2020 Confirmation of Initial License Examination 2024-01-19
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML22270A2372022-09-26026 September 2022 Form 5.1-1 Post Exam Checklist IR 05000282/20223012022-08-31031 August 2022 NRC Initial License Examination Report 05000282/2022301; 05000306/2022301 ML22270A2252022-08-26026 August 2022 Ile Security Agreement - Final ML22249A0062022-08-26026 August 2022 2.1-1 Examination Preparation Checklist for Prairie Island 08092022 ML22249A0072022-08-19019 August 2022 Ile 2022 Post Exam Comments Letter ML22213A1852022-08-0808 August 2022 Plan, Operator Licensing Examination Approval ML22237A3032022-08-0808 August 2022 Ile 2.3-4 ML22237A3022022-08-0808 August 2022 Ile 2.3-2 ML22237A3012022-05-27027 May 2022 Ile Licensee Letter Transmitting Proposed Exam and Test ML22242A3072022-03-24024 March 2022 3.4-1 Scenario Events & Evolutions Checklist RO & SRO ML22242A3032022-03-24024 March 2022 2.3-1 Exam Outline Quality Checklist ML22027A8012022-01-27027 January 2022 Confirmation of Initial License Examination ML21121A0002021-04-27027 April 2021 Preparation and Scheduling of Operator Licensing Examinations ML21082A4892021-03-23023 March 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information IR 05000282/20203012020-09-22022 September 2020 NRC Initial License Examination Report 05000282/2020301 and 05000306/2020301 L-PI-20-048, Post Exam Comments2020-09-21021 September 2020 Post Exam Comments ML20265A1802020-09-21021 September 2020 ES-403-1 ML20265A1722020-09-21021 September 2020 ES-201-1 L-PI-20-053, ES-201-32020-09-18018 September 2020 ES-201-3 ML20245E5662020-08-27027 August 2020 ES-401-6 ML20246G7542020-08-27027 August 2020 Ile As-Administered Scenarios ML20245E5762020-08-27027 August 2020 ES-301-4 ML20245E5822020-08-27027 August 2020 ES-201-2, Examination Outline Quality Checklist ML20246G7402020-08-27027 August 2020 Ile As-Administered Written Exam ML20245E5452020-08-27027 August 2020 ES-301-1 and ES-301-2, Administrative Topics Outline ML20252A2482020-08-27027 August 2020 Proposed Operating Test - Walkthrough Portion JPMs ML20246G7462020-08-27027 August 2020 Ile As-Administered RO Admin JPMs ML20246G7342020-08-27027 August 2020 Ile As-Administered SRO Admin JPMs ML20246G7432020-08-27027 August 2020 Ile As-Administered In-Plant JPMs ML20252A2542020-08-27027 August 2020 Proposed facility-developed RO-SRO Written Examination ML20245E5692020-08-27027 August 2020 ES-401-9 ML20252A2512020-08-27027 August 2020 Proposed Operating Test - Dynamic Simulator Scenarios ML20245E5642020-08-27027 August 2020 ES-401-4 ML20246G7322020-08-27027 August 2020 Ile As-Administered Simulator JPMs ML20245E5702020-08-27027 August 2020 NRC Comments and Resolution on Licensee Outlines ML20245E5582020-08-27027 August 2020 ES-401-2, 3, 4, PWR Examination Outline ML20245E5632020-08-27027 August 2020 ES-301-7 ML20258A0162020-08-27027 August 2020 ES-401-6 ML20245E5482020-08-27027 August 2020 ES-D-1, Scenario Outline ML20245E5742020-08-27027 August 2020 ES-301-3 ML20245E5812020-08-27027 August 2020 ES-301-5, Transient and Event Checklist ML20245E5802020-08-27027 August 2020 75 Day Letter ML20245E5792020-08-27027 August 2020 ES-301-6 ML20219A8402020-08-0707 August 2020 Operator Licensing Examination Approval ML20076F0592020-03-16016 March 2020 Preparation and Scheduling of Operator Licensing Examinations ML20023A2342020-01-23023 January 2020 Confirmation of Initial License Examination IR 05000282/20183012018-11-30030 November 2018 Errata - Prairie Island Nuclear Generating Plant, Units 1 and 2 - NRC Initial License Examination Report 05000282/2018301 and 05000306/2018301 (DRS-R.Baker) ML22179A2542018-10-16016 October 2018 2018 Prairie Island Ile Outline Review Comments-Final ML22179A2392018-10-16016 October 2018 2018 Prairie Island Ile ES-201-1 Exam Prep Checklist 2024-01-19
[Table view] |
Text
Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 1 Op-Test No.: PI-ILT-NRC-1801 Examiners: Randy Baker Operators: Shift Supervisor Chuck Zoia Lead Reactor Operator Jesse Seymour Reactor Operator Initial Conditions:
Reactor Power at 1x10-8 amps, Boron Concentration at 1346 ppm, RCS temperature at 549°F, RCS pressure at 2235 psig, Xenon free prior to startup, Bank D rods at 140 steps, Generator Power at 0 MW. Backup pressurizer heaters are ON. Two 40 GPM letdown orifices are in service.
No equipment out of service.
Turnover:
Raise reactor power to the point of adding heat.
Secure 12 MD AFW Pump.
Event Malf. Event Type* Event No. No. Description R (ATC) 1 RAISE POWER TO THE POAH N (SRO) 2 N (BOP) SECURE 12 MD AUXILIARY FEEDWATER PUMP I (ATC, SRO) 3 PRZR LEVEL WHITE (INTRLK) CHANNEL FAILS HIGH TS (SRO)
C (BOP, SRO) 4 B PRZR PORV LEAKAGE TS (SRO) 5 M (ALL) 12 STEAM GENERATOR TUBE RUPTURE 11 & 12 SAFETY INJECTION PUMPS FAIL TO START 6 C (BOP)
AUTOMATICALLY 7 C (BOP) CTMT ISOLATION RELAY AUTO ACTUATION FAILURE
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 2 Op-Test No.: PI-ILT-NRC-1802 Examiners: Randy Baker Operators: Shift Supervisor Chuck Zoia Lead Reactor Operator Jesse Seymour Reactor Operator Initial Conditions:
Reactor Power at 50%, Boron Concentration 1539 ppm, RCS temperature 552°, RCS pressure 2235 psig, Xenon at equilibrium, Bank D rods at 168 steps, Generator power at 270 Mw.
11 TD AFW Pump is out of service. T.S. LCO 3.7.5 Condition B entered with 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> remaining. 12 MD AFW Pump is protected.
Turnover:
Place a 2nd 40 gpm Letdown orifice in service in preparation for reactor up power.
Raise reactor power to 60%.
Event Malf. Event Type* Event No. No. Description 1 N (BOP) PLACE 2nd LETDOWN ORIFICE IN SERVICE R (ATC) 2 RAISE RX POWER FROM 50% TO 60%
N (SRO)
I (ATC, SRO) 3 CONTROLLING PRZR PRESS CH FAILS LOW TS (SRO)
C (BOP, SRO) 4 SI ACCUMULATOR LEAKAGE TS (SRO) 5 M (ALL) LBLOCA, w/ TRANSFER to RECIRCULATION 6 C (BOP) SAFETY INJECTION PUMPS FAIL TO AUTO START 7 C (BOP) SI TO CC RELAY ACTUATION FAILURE 8 C (ATC) 12 MDAFWP AUTO START FAILURE
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 3 Op-Test No.: PI-ILT-NRC-1803 Examiners: Randy Baker Operators: Shift Supervisor Chuck Zoia Lead Reactor Operator Jesse Seymour Reactor Operator Initial Conditions:
Reactor Power at 100%, Boron Concentration is 828 ppm, RCS temperature 560°, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 218, Generator power at 580 Mw.
11 RHR Pump out of service. T.S. LCO 3.5.2 Condition A was entered with 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> remaining. D2, 12 MD AFW Pump, 12 RHR Pump, 12 SI Pump, 12 CC Pump, and 22 CL Wtr Pump are protected.
Turnover:
Swap CRDM Fans IAW TP 1393 and 1C19.2.
Event Malf. Event Type* Event No. No. Description 1 N (BOP) SWAP CRDM FANS I (ATC, SRO) 2 TAVG YELLOW CHANNEL FAILS HIGH TS (SRO)
R (ATC) 3 RESTORE TAVG TO TREF N (SRO) 4 C (BOP, SRO) FAULTY GENERATOR AUTOMATIC VOLTAGE REGULATOR C (ATC, SRO) 5 REACTOR VESSEL O-RING LEAKAGE TS (SRO) 6 M (ALL) FAULTED 12 STEAM GENERATOR TO CONTAINMENT 7 C (BOP) MAIN TURBINE FAILS TO AUTOMATICALLY TRIP 8 C (BOP) SI TO FEEDWATER/CONDENSATE RELAY SIGNAL FAILURE
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: PRAIRIE ISLAND Scenario No.: 4 Op-Test No.: PI-ILT-NRC-1804 Examiners: Randy Baker Operators: Shift Supervisor Chuck Zoia Lead Reactor Operator Jesse Seymour Reactor Operator Initial Conditions:
Reactor Power at 90%, Boron Concentration at 858 ppm, RCS temperature at 558°, RCS pressure at 2235 psig, Xenon at equilibrium, Bank D rods at 208, Generator Power at 525 Mw.
D2 Diesel Generator is out of service. T.S. LCO 3.8.1 Condition B was entered with 9 days remaining. D1 Diesel Generator has been evaluated for common cause failure and has been determined to be OPERABLE. D1, 11 TD AFW Pump, 11 RHR Pump, 11 SI Pump, 11 CC Pump, 12 CL WTR Pump, 121 CR Air Supply Fan, 121 CR Chiller & Pump, and 121 CR Clean up Fan are protected. SP 1118 was completed 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ago and is due in 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.
Turnover:
Swap 11 & 12 EH oil pumps.
Event Malf. Event Type* Event No. No. Description 1 N (BOP) SWAP EH OIL PUMPS I (ATC, SRO) 2 PRZR LEVEL WHITE CHANNEL FAILS LOW TS(SRO)
I(ATC, SRO) 3 FIRST STAGE PRESSURE FAILS LOW TS(SRO)
R(ATC) 4 RESTORE TAVG TO TREF N(SRO) 5 M(ALL) LOSS OF ALL AC 6 C(BOP) D1 FAILS TO AUTO START 7 C(ATC) 11 TD AFW PUMP FAILS TO AUTO START
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor