ES-301 Administrative Topics Outline Form ES-301-1 Facility: __PRAIRIE ISLAND______________________ Date of Examination: SEPTEMBER 2018 Examination Level: RO Operating Test Number: PI-ILT-NRC-18 Administrative Topic (see Note)

Type Code*

Describe activity to be performed Conduct of Operations D, R RCS/STEAM GENERATOR TEMPERATURE VERIFICATION (ADMIN-48) 2.1.20 (4.6/4.6)

This is a bank JPM where the examinee determines if requirements are met to start an RCP.

Conduct of Operations D, P, R TURBINE START UP AND LOAD TIME (ADMIN-78) 2.1.25 (3.9/4.2)

This is a bank JPM where the examinee interprets a graph, performs calculation, and determines startup and loading rates of the main turbine.

Equipment Control D, R PERFORM RCS LEAKAGE INVESTIGATION (PRT)

(ADMIN-100) 2.2.12 (3.7/4.1)

This is a bank JPM where examinee has to determine RCS leakage into the PRT.

Radiation Control N/A N/A Emergency Procedures/Plan M, R DETERMINE STEAM GENERATOR LEAKAGE CORRELATION TO R-15 COUNTS (ADMIN-29) 2.4.11 (4.0/4.2)

Modified bank JPM where examinee demonstrates knowledge of SG leak AOP. Original JPM has R-15 counts of 2500 CPM which results in 80 GPD & 81 GPD/hr leak rates. The modified JPM requires the operator to calculate leak rate from a higher count rate.

NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes & Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)

ES-301 Administrative Topics Outline Form ES-301-1 Facility: __PRAIRIE ISLAND_____________________ Date of Examination: SEPTEMBER 2018 Examination Level: SRO Operating Test Number: PI-ILT-NRC-18 Administrative Topic (see Note)

Type Code*

Describe activity to be performed Conduct of Operations D, R EVALUATE OPERATING CONDITIONS WHEN SECURITY ANALYSIS IS OOS (ADMIN-19) 2.1.25 (3.9/4.2)

This is a bank JPM that requires the examinee to evaluate the current system operating conditions for BUS 25 ONLY per C20.3 AOP 1.

Conduct of Operations D, R ASSESS SHIFT STAFFING LEVELS (ADMIN-88) 2.1.5 (2.9*/3.9)

This is a bank JPM where the examinee must determine if the STA can leave for convenience reasons.

Equipment Control N, R PERFORM SHUTDOWN SAFETY ASSESSMENT (ADMIN-105) 2.2.18 (2.6/3.9)

This is a new JPM where the examinee will perform a portion of the SSA checklist and determine risk of maintenance activities while plant is shutdown.

Radiation Control D, P, R AUTHORIZE WASTE GAS RELEASE (ADMIN-22) 2.3.6 (3.8/4.3)

This is a bank JPM where the examinee determines a gas release cannot be approved due to unfavorable wind conditions.

Emergency Procedures/Plan N, R REVIEW EMERGENCY NOTIFICATION REPORT (ADMIN-106) 2.4.40 (2.7/4.5)

This is a new JPM where the examinee performs a peer check on an already filled out emergency notification report and must identify at least one error and determine the report is NOT ready to be sent out. The original JPM had the examinee verify type of release in progress. This JPM will contain an error in downwind sectors.

NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes & Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1; randomly selected)