MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] |
Text
July 13, 2022 Theodore R. Wentworth II, Manager Radiological Protection Section Materials Management Division Michigan Department of Environment, Great Lakes, and Energy 525 West Allegan Street Lansing, MI 48933
SUBJECT:
TERMINATION OF EMERGENCY RESPONSE DATA SYSTEM FEED FOR PALISADES NUCLEAR PLANT
Dear Mr. Wentworth:
This letter serves to notify the State of Michigan that Entergy Nuclear Operations, Inc. (Entergy) has terminated the Emergency Response Data System (ERDS) link from the Palisades Nuclear Plant (PNP) to the U.S. Nuclear Regulatory Commission (NRC) Operations Center, based on the permanently shutdown status of the facility.
Section VI, Emergency Response Data System, of Appendix E, Emergency Planning and Preparedness for Production and Utilization Facilities, to Part 50, Domestic Licensing of Production and Utilization Facilities, of Title 10, Energy, of the Code of Federal Regulations (10 CFR) establishes the requirement for a nuclear power reactor licensee to have a real-time electronic data link from the licensees onsite computer system to the NRC Operations Center that provides for the automated transmission of a limited data set of selected parameters. The Agreement between the NRC and the State of Michigan, effective December 17, 1991, provides the basis for mutually agreeable procedures whereby the State of Michigan may utilize the NRC ERDS to receive data during an emergency at a commercial nuclear power plant for which any portion of the plant's 10-mile Plume Exposure Pathway Emergency Planning Zone lies within the State of Michigan.
By letter dated January 4, 2017 (Agencywide Documents Access and Management System Accession No. ML17004A062), as supplemented by letters dated September 28, 2017, and October 19, 2017 (ML17271A233 and ML17292A032, respectively), Entergy notified the NRC, pursuant to 10 CFR 50.82(a)(1)(i), of its intention to permanently cease power operations at PNP no later than May 31, 2022. By letter dated June 13, 2022 (ML22164A067), Entergy certified to the NRC that PNP permanently ceased power operations on May 20, 2022, and that, pursuant to 10 CFR 50.82(a)(1)(ii), the fuel was permanently removed from the PNP reactor vessel and placed in the spent fuel pool on June 10, 2022. Upon the NRCs docketing of these certifications, the 10 CFR Part 50 license for PNP no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel, as specified in 10 CFR 50.82(a)(2).
By order dated December 13, 2021 (ML21292A146), the NRC staff approved (1) the transfer of Renewed Facility Operating License No. DPR-20 for Palisades, the general license for the Palisades independent spent fuel storage installation (ISFSI), Facility Operating License
T. Wentworth No. DPR-6 for the Big Rock Point Plant (Big Rock Point), and the general license for the Big Rock Point ISFSI (referred to collectively as the Sites and the licenses) to a Holtec International (Holtec) subsidiary to be known as Holtec Palisades, LLC (Holtec Palisades) and (2) the transfer of Enterys operating authority (i.e., its authority to conduct licensed activities at the Sites) to Holtec Decommissioning International, LLC (HDI). The order also approved draft conforming administrative amendments to the licenses to reflect the transfer.
On June 28, 2022 (ML22179A075), Entergy informed the NRC that the license transfer transaction closed on June 28, 2022. On June 28, 2022 (ML22173A179), the NRC staff issued Amendment No. 129 for Big Rock Point and Amendment No. 273 for Palisades to reflect the license transfer. Accordingly, HDI is now the licensee for decommissioning operations at Big Rock Point and Palisades.
The requirements to have an ERDS data link to the NRC under section VI.2 of Appendix E to 10 CFR Part 50 do not apply to nuclear power facilities that have permanently or indefinitely shut down, such as PNP. The termination of the ERDS link for PNP does not impact the licensees responsibility to provide notification to offsite authorities for an emergency declaration, to provide information on facility status to support the assessment of a potential radiological release at the facility, and to advise on offsite action that offsite authorities may consider to protect their citizenry, as described in PNPs Post-Shutdown Emergency Plan for PNP, which the NRC approved by letter dated September 24, 2018 (ADAMS Accession No. ML18170A219).
The termination of the PNP ERDS link will not impact the State of Michigans ability to continue to receive plant information via an ERDS link for incidents related to Fermi Unit 2 and D.C. Cook Units 1 and 2 plants.
If you have any questions regarding the termination of the ERDS link for PNP, or continued interface with the NRC for an event at PNP, please contact Bezakulu Alemu at (301) 287-3731 or by email at Bezakulu.Alemu@nrc.gov.
Sincerely, Signed by Johnson, Robert on 07/13/22 Robert Johnson, Director Division of Preparedness and Response Office of Nuclear Security and Incident Response
MLXXXXXXXX *via e-mail OFFICE NSIR/DPR/OB NSIR/DPR/OB NSIR/DRR/DORL/LPL3 NMSS/DUWP NAME J. Whited J. Quichocho N. Salgado B. Watson DATE 6/27/2022 6/30/2022 7/6/2022 7/6/2022 OFFICE RSLO, Region III NSIR/DPR/FO NAME A. Barker C. Johnson DATE 7/7/2022 7/13/2022
ML22175A017 OFFICE NSIR/DPR/OB NSIR/DPR/OB NSIR/DPR/RLB NRR/DORL/LPL3 NAME BAlemu BA JWhited JW JQuichocho JQ NSalgado NS DATE Jun 24, 2022 Jun 27, 2022 Jun 30, 2022 Jul 6, 2022 OFFICE NMSS/DUWP/RDB R-III NSIR/DPR NAME SAnderson SA ABarker AB RJohnson RJ DATE Jul 6, 2022 Jul 7, 2022 Jul 13, 2022