ML22164A432

From kanterella
Jump to navigation Jump to search
Notification of Transition of Oversight for Decommissioning Units_Draft
ML22164A432
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/13/2022
From: Dave Hills
NRC/RGN-III/DNMS/MCID
To: Corbin D
Entergy Nuclear Operations
References
Download: ML22164A432 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 Mr. Darrell Corbin Vice President, Operations Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530

SUBJECT:

TERMINATION OF REACTOR OVERSIGHT PROCESS FOR PALISADES NUCLEAR PLANT AND COMMENCEMENT OF DECOMMISSIONING INSPECTION PROGRAM

Dear Mr. Corbin:

This letter is to inform you that oversight activities by the U.S. Nuclear Regulatory Commission (NRC) at the Palisades Nuclear Plant will no longer be performed in accordance with our operating power reactor inspection program. The NRCs oversight of your future activities at Palisades will be conducted in accordance with our decommissioning power reactor inspection program.

On January 4, 2017, Entergy Nuclear Operations, Inc., notified the NRC of their intent to permanently shut down the Palisades Nuclear Plant (ADAMS Accession Number:

ML17004A062). Additional updates regarding the date of shutdown were provided to the NRC on September 28, 2017 (ML17271A233) and on October 19, 2017 (ML17292A032). On June 13, 2022, Entergy Nuclear Operations, Inc., certified cessation of power operations and the permanent removal of fuel from the Palisades Nuclear Plant reactor vessel (ADAMS Accession Number: ML22164A067). The NRC will no longer use Inspection Manual Chapter (IMC) 0305, Operating Reactor Assessment Program, IMC 0608, Performance Indicator Program, and IMC 2515, Light-Water Reactor Inspection Program when conducting oversight activities and assessing site performance. Therefore, it is also no longer necessary to report Reactor Oversight Process performance indicator data for the Palisades Nuclear Plant. The results of inspection activities completed under IMC 2515 will be provided in future correspondence. Although the inspection program for NRC oversight at your facility has changed, all license commitments remain in effect until altered by formal action from the NRC.

The NRCs oversight of your licensed activities as you progress through decommissioning will be conducted under the provisions in IMC 2561, Decommissioning Power Reactor Inspection Program. The objectives of the decommissioning inspection program are to verify that decommissioning activities are being conducted safely, that spent fuel is safely being stored, and that site operations and license termination activities are in conformance with applicable regulatory requirements, licensee commitments, and management controls.

As defined in IMC 2561, the Palisades Nuclear Plant is currently in the "Post-Operation Transition Phase" of decommissioning and the inspections as detailed in IMC 2561, Appendix A, Core Inspection Procedures for that phase will be conducted at your facility. In June 13, 2022 addition, the inspection procedures listed in IMC 2561, Appendix B, Discretionary Procedures for Decommissioning Power Reactors could be performed based on site activities and conditions.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records component of the NRCs Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9733 or Rhex Edwards, at 630-829-9722, with any questions you may have regarding this letter.

Sincerely, David E. Hills, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 05000255 License No. DPR-20 cc: Distribution via LISTSERV Signed by Hills, David on 06/13/22

D. Corbin

D. Corbin

Letter to D. Corbin from D. Hills dated June 13, 2022

DISTRIBUTION:

Jessie Quichocho Robert Orlikowski Shaun Anderson Bruce Watson Karl Sturzbecher Scott Wall RidsNrrDorlLpl3 RidsNrrDroIrib Resource Jack Giessner Mohammed Shuaibi Shelby Lewman Allan Barker Harral Logaras Viktoria Mitlyng Prema Chandrathil DNMSIII DRPIII DRSIII

ADAMS Accession Number: ML22164A432 OFFICE RIII DNMS C RIII DRP C RIII DNMS RIII NAME RAEdwards BCDickson DEHills DATE 06/13/22 06/13/22 06/13/22 OFFICIAL RECORD COPY