MONTHYEARML24320A1232024-11-18018 November 2024 Confirmation of Initial License Examination IR 05000255/20203012020-08-13013 August 2020 NRC Initial License Examination Report 05000255/2020301 ML20267A3432020-07-0606 July 2020 2020 Palisades Ile Form ES-401-6 ML20268A0732020-07-0606 July 2020 2020 Palisades Ile Form ES-401-4 ML20267A3442020-07-0606 July 2020 2020 Palisades Ile Proposed RO Admin JPMs ML20268A0842020-07-0606 July 2020 2020 Palisades Ile Op Test Outline Review Comments ML20267A3492020-07-0606 July 2020 2020 Palisades Ile Proposed Scenarios ML20267A3592020-07-0606 July 2020 2020 Palisades Ile Proposed Written Exam with Answer Key - Redacted ML20268A1312020-07-0606 July 2020 2020 Palisades Ile Administered Walkthrough JPMs ML20268A1502020-07-0606 July 2020 2020 Palisades Ile Administered Written Exam with Answer Key - Redacted ML20267A5822020-07-0606 July 2020 2020 Palisades Ile Form ES-201-1 ML20267A5882020-07-0606 July 2020 2020 Palisades Ile Form ES-403-1 ML20267A3322020-07-0606 July 2020 2020 Palisades Ile Form ES-301-6 - Rev 0 ML20267A3212020-07-0606 July 2020 2020 Palisades Ile Form ES-301-4 ML20267A3102020-07-0606 July 2020 2020 Palisades Ile Form ES-301-3 PNP 2020-003, 2020 Palisades Ile Proposed Exam Submittal Letter2020-07-0606 July 2020 2020 Palisades Ile Proposed Exam Submittal Letter ML20268A0762020-07-0606 July 2020 2020 Palisades Ile Form ES-401-9 ML20268A1632020-07-0606 July 2020 2020 Palisades Ile Administered Written Exam - Redacted ML20267A5922020-07-0606 July 2020 2020 Palisades Post-Examination Submittal Letter ML20267A3342020-07-0606 July 2020 2020 Palisades Ile Form ES-301-6 - Rev 1 ML20268A0792020-07-0606 July 2020 2020 Palisades Ile Post-Exam Comments - Redacted ML20268A1092020-07-0606 July 2020 2020 Palisades Ile Administered Scenarios ML20267A5852020-07-0606 July 2020 2020 Palisades Ile Form ES-201-3 ML20267A3562020-07-0606 July 2020 2020 Palisades Ile Proposed Walkthrough JPMs ML20268A0712020-07-0606 July 2020 2020 Palisades Ile Form ES-301-7 ML20268A1012020-07-0606 July 2020 2020 Palisades Ile Administered RO Admin JPMs ML20268A1112020-07-0606 July 2020 2020 Palisades Ile Administered SRO Admin JPMs ML20267A3522020-07-0606 July 2020 2020 Palisades Ile Proposed SRO Admin JPMs ML20099D2832020-04-0808 April 2020 Operator Licensing Examination Approval ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations PNP 2019-038, 2020 Palisades Ile Outline Submittal Letter2019-11-0707 November 2019 2020 Palisades Ile Outline Submittal Letter ML19234A0332019-08-22022 August 2019 Confirmation of Initial License Examination (Bab) ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19009A2502019-01-0808 January 2019 GFE Annual Registration Letter - 2019 Examinations, Region III ML18284A1822018-09-27027 September 2018 Gfes Results, September 2018 PNP 2018-030, Voluntary Response to NRC Regulatory Issue Summary 2018-02: Preparation and Scheduling of Operator Licensing Examinations2018-06-0606 June 2018 Voluntary Response to NRC Regulatory Issue Summary 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML17361A0302017-12-26026 December 2017 GFE Annual Registration Letter - 2018 Examinations - Region III ML22145A5952017-08-14014 August 2017 2017 Palisades Retake ES-201-1 ML22145A5972017-08-14014 August 2017 2017 Palisades Retake Outline and Operating Test Comments (ES-301-7) ML22145A5962017-08-14014 August 2017 2017 Palisades Retake ES-201-3 PNP 2017-051, 2017 Palisades Retake Post Exam Submittal Letter2017-08-0909 August 2017 2017 Palisades Retake Post Exam Submittal Letter ML22146A0232017-08-0808 August 2017 JPM 2 ML22146A0172017-08-0808 August 2017 JPM 1a ML22146A0192017-08-0808 August 2017 JPM 1b ML22146A0242017-08-0808 August 2017 JPM 3 ML22146A0262017-08-0808 August 2017 JPM 4 ML17222A1812017-08-0707 August 2017 Operator Licensing Reexamination Approval ML22146A0542017-08-0101 August 2017 2017 Palisades Retake ES-301-1 ML22146A0502017-08-0101 August 2017 2017 Palisades Retake ES-201-2 ML22146A0322017-07-24024 July 2017 2017 Palisades Retake Proposed Admin JPMs 2024-11-18
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24320A1232024-11-18018 November 2024 Confirmation of Initial License Examination IR 05000255/20203012020-08-13013 August 2020 NRC Initial License Examination Report 05000255/2020301 ML20268A1632020-07-0606 July 2020 2020 Palisades Ile Administered Written Exam - Redacted ML20268A0762020-07-0606 July 2020 2020 Palisades Ile Form ES-401-9 ML20268A0842020-07-0606 July 2020 2020 Palisades Ile Op Test Outline Review Comments ML20268A1012020-07-0606 July 2020 2020 Palisades Ile Administered RO Admin JPMs ML20268A1312020-07-0606 July 2020 2020 Palisades Ile Administered Walkthrough JPMs ML20267A3342020-07-0606 July 2020 2020 Palisades Ile Form ES-301-6 - Rev 1 ML20267A3592020-07-0606 July 2020 2020 Palisades Ile Proposed Written Exam with Answer Key - Redacted ML20267A3102020-07-0606 July 2020 2020 Palisades Ile Form ES-301-3 ML20267A5852020-07-0606 July 2020 2020 Palisades Ile Form ES-201-3 ML20268A0712020-07-0606 July 2020 2020 Palisades Ile Form ES-301-7 ML20268A1112020-07-0606 July 2020 2020 Palisades Ile Administered SRO Admin JPMs ML20268A1502020-07-0606 July 2020 2020 Palisades Ile Administered Written Exam with Answer Key - Redacted ML20267A5822020-07-0606 July 2020 2020 Palisades Ile Form ES-201-1 ML20267A5882020-07-0606 July 2020 2020 Palisades Ile Form ES-403-1 ML20267A3442020-07-0606 July 2020 2020 Palisades Ile Proposed RO Admin JPMs ML20267A3322020-07-0606 July 2020 2020 Palisades Ile Form ES-301-6 - Rev 0 ML20268A0792020-07-0606 July 2020 2020 Palisades Ile Post-Exam Comments - Redacted ML20268A1092020-07-0606 July 2020 2020 Palisades Ile Administered Scenarios ML20268A0732020-07-0606 July 2020 2020 Palisades Ile Form ES-401-4 ML20267A3522020-07-0606 July 2020 2020 Palisades Ile Proposed SRO Admin JPMs ML20267A3492020-07-0606 July 2020 2020 Palisades Ile Proposed Scenarios ML20267A5922020-07-0606 July 2020 2020 Palisades Post-Examination Submittal Letter ML20267A3212020-07-0606 July 2020 2020 Palisades Ile Form ES-301-4 ML20267A3432020-07-0606 July 2020 2020 Palisades Ile Form ES-401-6 PNP 2020-003, 2020 Palisades Ile Proposed Exam Submittal Letter2020-07-0606 July 2020 2020 Palisades Ile Proposed Exam Submittal Letter ML20267A3562020-07-0606 July 2020 2020 Palisades Ile Proposed Walkthrough JPMs ML20099D2832020-04-0808 April 2020 Operator Licensing Examination Approval ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations PNP 2019-038, 2020 Palisades Ile Outline Submittal Letter2019-11-0707 November 2019 2020 Palisades Ile Outline Submittal Letter ML19234A0332019-08-22022 August 2019 Confirmation of Initial License Examination (Bab) ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18284A1822018-09-27027 September 2018 Gfes Results, September 2018 PNP 2018-030, Voluntary Response to NRC Regulatory Issue Summary 2018-02: Preparation and Scheduling of Operator Licensing Examinations2018-06-0606 June 2018 Voluntary Response to NRC Regulatory Issue Summary 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML22145A5952017-08-14014 August 2017 2017 Palisades Retake ES-201-1 ML22145A5972017-08-14014 August 2017 2017 Palisades Retake Outline and Operating Test Comments (ES-301-7) ML22145A5962017-08-14014 August 2017 2017 Palisades Retake ES-201-3 PNP 2017-051, 2017 Palisades Retake Post Exam Submittal Letter2017-08-0909 August 2017 2017 Palisades Retake Post Exam Submittal Letter ML22146A0262017-08-0808 August 2017 JPM 4 ML22146A0172017-08-0808 August 2017 JPM 1a ML22146A0232017-08-0808 August 2017 JPM 2 ML22146A0192017-08-0808 August 2017 JPM 1b ML22146A0242017-08-0808 August 2017 JPM 3 ML17222A1812017-08-0707 August 2017 Operator Licensing Reexamination Approval ML22146A0502017-08-0101 August 2017 2017 Palisades Retake ES-201-2 ML22146A0542017-08-0101 August 2017 2017 Palisades Retake ES-301-1 ML22146A0322017-07-24024 July 2017 2017 Palisades Retake Proposed Admin JPMs ML22146A0292017-07-24024 July 2017 2017 Palisades Retake ES-301-3 ML22146A0402017-07-10010 July 2017 Ltr Pal 2017 Retake Exam - Outline and Proposed Exam Submittal 2024-11-18
[Table view] |
Text
Appendix D Scenario Outline Form ES-D-1
Facility: PALISADES NUCLEAR PLANT Scenario No.: _____1 ________ Op-Test No.: __1______
Examiners: __________________________ Operators: _____________________________
Initial Conditions: The Unit is 74% power, middle of core life. P-54A, Containment Spray pump is tagged OOS for seal cooler inspection.
Turnover: Shift orders are to alternate operating CCW pumps and continue the power escalation to full power.
Event Malf. Event Event No. No. Type* Description 1 N/A ATC (N) Alternate operating CCW pumps SRO (N) 2 N/A ATC (R) Commence power escalation SRO (R) 3 ATC (C) Primary water totalizer failure to stop at programmed value SRO (C) (during ramp, manual action required to secure dilution) 4 BOP (I) West ESS room ventilation rad monitor failure SRO (I,T) 5 ATC (C) Loss of Preferred AC Bus Y-10 (inverter failure)
SRO (C,T) 6 BOP (C) Turbine Governor Valve GV3 and GV4 fail shut SRO (C) 7 BOP (C) Failure of turbine to auto trip 8 ALL (M) ESDE (Main Steamline Rupture) inside containment (ramped in at time of trip) 9 ATC (C) Left Channel Containment Spray fails to auto or manually SRO (C) actuate (requires manual alignment and start of P-54B)
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1
Facility: PALISADES NUCLEAR PLANT Scenario No.: _____2 ________ Op-Test No.: __1______
Examiners: __________________________ Operators: _____________________________
Initial Conditions:
The Unit is at 100% RTP in the middle of core life. P -66B HPSI Pump is tagged out of service for an impeller replacement.
Turnover: Shift orders are to cycle control valves per Section 7.9.1 of SOP-3.
Event Malf. Event Event No. No. Type* Description 1 ATC (N) Cycle Control Valves CV-3055, CV-3223, and CV-3212 per SRO (N) SOP-3 2 BOP (C) Main Generator Voltage Regulator fails with concurrent SRO (C) fluctuation in grid voltage 3 BOP (I) S/G A level transmitter LT-701 output fails low SRO (I,T) 4 ATC (I) Hot Leg #1 RTD fails low SRO (I,T) 5 BOP (C) Cooling Tower Pump P-39B trips and Rapid Downpower (due ATC (R) to degrading vacuum)
SRO (C,R) 6 ATC (C) P-50D lower seal failure. 4 minutes later, the middle seal fails, SRO (C,T) requiring the Unit to be taken offline.
7 ALL (M) Small Break LOCA (350 gpm leakage from charging line piping at reactor vessel) 8 ATC (C) Failure of SIAS to automatically or manually actuate (must SRO (C) manually start/align equipment) 9 ATC (C) HPSI Pump P-66A trips on ground O/C when manually started (no HPSI flow available)
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1
Facility: PALISADES NUCLEAR PLANT Scenario No.: _____3______ _____ Op-Test No.: __1______
Examiners: __________________________ Operators: _____________________________
Initial Conditions:
The Unit is middle of core life at 45% RTP. P-1B Main Feedwater pump has just been returned to service following repair of an oil leak.
Turnover: P-55A charging pump is OOS for a seal leak. P-8A AF pump is OOS to support a breaker inspection. Shift orders to place the second Heater Drain pump online per SOP-10 and continue power ascension to full power.
Event Malf. Event Event No. No. Type* Description 1 N/A BOP (N) Start second Heater Drain pump per SOP-10 SRO (N) 2 N/A ATC (R) Commence power escalation SRO (R) 3 BOP (C) Loss of A Control Room HVAC Train SRO (C,T) 4 ATC (I) Channel B Pressurizer Pressure controller failure SRO (I,T) 5 ATC (C) Loss of DC Panel ED-11-1 (prevents left train from generating BOP (C) AFAS)
SRO (C,T) 6 ALL (M) LOOP coincident with spurious closure of B MSIV. Security calls and reports and earthquake.
7 BOP (C) When Aux Feedwater is actuated (auto or manual), S/G B SRO (C) Control Valve CV-0736A fails to open, requiring manual operation to feed S/G B with P-8C.
8 BOP (C) 2 B MSSVs stick open (2 minutes after the B MSIV closes).
SRO (C)
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor