Appendix D Scenario Outline Form ES-D-1 Facility: PALISADES NUCLEAR PLANT Scenario No.: _____1________

Op-Test No.: __1______

Examiners: __________________________ Operators:

Initial Conditions: The Unit is 74% power, middle of core life. P-54A, Containment Spray pump is tagged OOS for seal cooler inspection.

Turnover: Shift orders are to alternate operating CCW pumps and continue the power escalation to full power.

Event No.

Malf.

No.

Event Type*

Event Description 1

N/A ATC (N)

SRO (N)

Alternate operating CCW pumps 2

N/A ATC (R)

SRO (R)

Commence power escalation 3

ATC (C)

SRO (C)

Primary water totalizer failure to stop at programmed value (during ramp, manual action required to secure dilution) 4 BOP (I)

SRO (I,T)

West ESS room ventilation rad monitor failure 5

ATC (C)

SRO (C,T)

Loss of Preferred AC Bus Y-10 (inverter failure) 6 BOP (C)

SRO (C)

Turbine Governor Valve GV3 and GV4 fail shut 7

BOP (C)

Failure of turbine to auto trip 8

ALL (M)

ESDE (Main Steamline Rupture) inside containment (ramped in at time of trip) 9 ATC (C)

SRO (C)

Left Channel Containment Spray fails to auto or manually actuate (requires manual alignment and start of P-54B)

(N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: PALISADES NUCLEAR PLANT Scenario No.: _____2________

Op-Test No.: __1______

Examiners: __________________________ Operators:

Initial Conditions:

The Unit is at 100% RTP in the middle of core life. P-66B HPSI Pump is tagged out of service for an impeller replacement.

Turnover: Shift orders are to cycle control valves per Section 7.9.1 of SOP-3.

Event No.

Malf.

No.

Event Type*

Event Description 1

ATC (N)

SRO (N)

Cycle Control Valves CV-3055, CV-3223, and CV-3212 per SOP-3 2

BOP (C)

SRO (C)

Main Generator Voltage Regulator fails with concurrent fluctuation in grid voltage 3

BOP (I)

SRO (I,T)

S/G A level transmitter LT-701 output fails low 4

ATC (I)

SRO (I,T)

Hot Leg #1 RTD fails low 5

BOP (C)

ATC (R)

SRO (C,R)

Cooling Tower Pump P-39B trips and Rapid Downpower (due to degrading vacuum) 6 ATC (C)

SRO (C,T)

P-50D lower seal failure. 4 minutes later, the middle seal fails, requiring the Unit to be taken offline.

7 ALL (M)

Small Break LOCA (350 gpm leakage from charging line piping at reactor vessel) 8 ATC (C)

SRO (C)

Failure of SIAS to automatically or manually actuate (must manually start/align equipment) 9 ATC (C)

HPSI Pump P-66A trips on ground O/C when manually started (no HPSI flow available)

(N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Facility: PALISADES NUCLEAR PLANT Scenario No.: _____3___________

Op-Test No.: __1______

Examiners: __________________________ Operators:

Initial Conditions:

The Unit is middle of core life at 45% RTP. P-1B Main Feedwater pump has just been returned to service following repair of an oil leak.

Turnover: P-55A charging pump is OOS for a seal leak. P-8A AF pump is OOS to support a breaker inspection. Shift orders to place the second Heater Drain pump online per SOP-10 and continue power ascension to full power.

Event No.

Malf.

No.

Event Type*

Event Description 1

N/A BOP (N)

SRO (N)

Start second Heater Drain pump per SOP-10 2

N/A ATC (R)

SRO (R)

Commence power escalation 3

BOP (C)

SRO (C,T)

Loss of A Control Room HVAC Train 4

ATC (I)

SRO (I,T)

Channel B Pressurizer Pressure controller failure 5

ATC (C)

BOP (C)

SRO (C,T)

Loss of DC Panel ED-11-1 (prevents left train from generating AFAS) 6 ALL (M)

LOOP coincident with spurious closure of B MSIV. Security calls and reports and earthquake.

7 BOP (C)

SRO (C)

When Aux Feedwater is actuated (auto or manual), S/G B Control Valve CV-0736A fails to open, requiring manual operation to feed S/G B with P-8C.

8 BOP (C)

SRO (C) 2 B MSSVs stick open (2 minutes after the B MSIV closes).

(N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor