ML22167A039
| ML22167A039 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 10/12/2016 |
| From: | Randy Baker NRC/RGN-III/DRS/OLB |
| To: | Entergy Nuclear Operations |
| Baker R | |
| Shared Package | |
| ML17037C879 | List: |
| References | |
| Download: ML22167A039 (2) | |
Text
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PALISADES NUCLEAR PLANT Date of Exam: 2/13 - 2/20 2017 Operating Test No.: NRC-2017 A
P P
L I
C A
N T
E V
E N
T T
Y P
E (Crew 1) Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RO SRO-I SRO-U RX 2
2 2
1 1 0 NOR 1
1 1
1 1 I/C 3,5,6 9
3,4,5 7
4 4 2 MAJ 8
7 2
2 2 1 TS 0
0 2 2 RO SRO-I SRO-U RX 2
2 2
1 1 0 NOR 1
1 1
1 1 I/C 4,7 4,6,8 5
4 4 2 MAJ 8
7 2
2 2 1 TS 0
0 2 2 RO SRO-I SRO-U RX 2
1 1
1 0 NOR 1
1 1
1 1 I/C 3,4,5 6,9 5
4 4 2 MAJ 8
1 2
2 1 TS 4,5 2
0 2 2 RO SRO-I SRO-U RX 2
1 1
1 0 NOR 1
1 1
1 1 I/C 3,4,5 6,8 5
4 4 2 MAJ 7
1 2
2 1 TS 2,4,5 3
0 2 2 Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: PALISADES NUCLEAR PLANT Date of Exam: 2/13 - 2/20 2017 Operating Test No.: NRC-2017 A
P P
L I
C A
N T
E V
E N
T T
Y P
E
( Crews 2 & 3) Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RO SRO-I SRO-U RX 2
2 2
3 1
1 0 NOR 1
1 2
1 1 1 I/C 3,4,5 6,7,9 3,4,5 4,5 11 4 4 2 MAJ 8
7 6
3 2
2 1 TS 4,5 2
0 2 2 RO SRO-I SRO-U RX 2
2 2
3 1
1 0 NOR 1
1 2
1 1 1 I/C 3,5,6 9
3,4,5 6,8 3,5,7 12 4 4 2 MAJ 8
7 6
3 2
2 1 TS 2,4,5 3
0 2 2 RO SRO-I SRO-U RX 2
2 2
3 1
1 0 NOR 1
1 2
1 1 1 I/C 4,7 4,6,8 3,4,5 7
9 4
4 2 MAJ 8
7 6
3 2
2 1 TS 1,3,4 5
4 0
2 2 RO SRO-I SRO-U RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 TS 0
2 2 Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.