ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:

Point Beach Date of Examination:

7/15/2019 Exam Level: RO SRO-I SRO-U Operating Test Number:

2019 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*

Safety Function

a. Chemical and Volume Control System / Establish Excess Letdown 004A4.06 (3.6/3.1)

A, D, S 1

b. Emergency Core Cooling System / Align a Train of SI for Containment Sump Recirculation Following Containment Spray Recirculation 006A4.05 (3.9/3.8)

D, EN, L, S 2

c. Residual Heat Removal / Stroke Open Test 1SI-852A, Low Head SI Core Deluge Isolation 005A1.07 (2.3/3.1*)

N, S 4P

d. Auxiliary/Emergency Feedwater System / Raise Steam Generator Water Level Using Auxiliary Feedwater (1P-53) 061A2.05 (3.1*/3.4*) 2015 NRC Exam A, D, L, P, S 4S
e. Containment Spray System / Secure Containment Spray 026A2.08 (3.2/3.7) 2017 NRC Exam D, EN, L, P, S 5
f. AC Electrical Distribution / Synchronize Turbine Generator Output with Grid at Minimum Load 062A4.07 (3.1*/3.1*)

D, L, S 6

g. Reactor Protection System / Place Reactor Protection Channel in the Tripped Condition 012A3.01 (3.8/3.9)

D, S 7

h. Component Cooling Water System / Respond to Component Cooling Water System Component Malfunction 008A4.01 (3.3/3.1)

A, D, L, S 8

In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U

i. Emergency Core Cooling System / Refill RWST 006A2.03 (3.3/3.7)

D, E, L, R 3

j. Emergency Diesel Generator / Fast Start an Emergency Diesel Generator 064A4.01 (4.0/4.3)

A, E, L, M 6

k. Control Room Evacuation / Locally Start Standby Steam Generator Feed Pump 068AA1.02 (4.3/4.5)

A, D, E 8

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6/4-6/2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:

Point Beach Date of Examination:

7/15/2019 Exam Level: RO SRO-I SRO-U Operating Test Number:

2019 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*

Safety Function

a. Chemical and Volume Control System / Establish Excess Letdown 004A4.06 (3.6/3.1)

A, D, S 1

b. Emergency Core Cooling System / Align a Train of SI for Containment Sump Recirculation Following Containment Spray Recirculation 006A4.05 (3.9/3.8)

D, EN, L, S 2

c. Residual Heat Removal / Stroke Open Test 1SI-852A, Low Head SI Core Deluge Isolation 005A1.07 (2.3/3.1*)

N, S 4P

d. Auxiliary/Emergency Feedwater System / Raise Steam Generator Water Level Using Auxiliary Feedwater (1P-53) 061A2.05 (3.1*/3.4*) 2015 NRC Exam A, D, L, P, S 4S
e. Containment Spray System / Secure Containment Spray 026A2.08 (3.2/3.7) 2017 NRC Exam D, EN, L, P, S 5
f.
g. Reactor Protection System / Place Reactor Protection Channel in the Tripped Condition 012A3.01 (3.8/3.9)

D, S 7

h. Component Cooling Water System / Respond to Component Cooling Water System Component Malfunction 008A4.01 (3.3/3.1)

A, D, L, S 8

In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U

i. Emergency Core Cooling System / Refill RWST 006A2.03 (3.3/3.7)

D, E, L, R 3

j. Emergency Diesel Generator / Fast Start an Emergency Diesel Generator 064A4.01 (4.0/4.3)

A, E, L, M 6

k. Control Room Evacuation / Locally Start Standby Steam Generator Feed Pump 068AA1.02 (4.3/4.5)

A, D, E 8

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6/4-6/2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:

Point Beach Date of Examination:

7/15/2019 Exam Level: RO SRO-I SRO-U Operating Test Number:

2019 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*

Safety Function

a.
b. Emergency Core Cooling System / Align a Train of SI for Containment Sump Recirculation Following Containment Spray Recirculation 006A4.05 (3.9/3.8)

D, EN, L, S 2

c.
d. Auxiliary/Emergency Feedwater System / Raise Steam Generator Water Level Using Auxiliary Feedwater (1P-53) 061A2.05 (3.1*/3.4*) 2015 NRC Exam A, D, L, P, S 4S
e. Containment Spray System / Secure Containment Spray 026A2.08 (3.2/3.7) 2017 NRC Exam D, EN, L, P, S 5
f.
g.
h.

In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U

i. Emergency Core Cooling System / Refill RWST 006A2.03 (3.3/3.7)

D, E, L, R 3

j. Emergency Diesel Generator / Fast Start an Emergency Diesel Generator 064A4.01 (4.0/4.3)

A, E, L, M 6

k.

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6/4-6/2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:

Point Beach Date of Examination:

7/15/2019 Exam Level: RO SRO-I SRO-U Operating Test Number:

2019 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*

Safety Function

a.
b.
c.
d.
e. Pressure Relief Tank/Quench Tank System / Fill the PRT for Nitrogen Purge 007A1.01 (2.9/3.1)

D, S 5

f.
g.
h. Component Cooling Water System / Respond to Component Cooling Water System Component Malfunction 008A4.01 (3.3/3.1)

A, D, L, S 8

In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U

i.
j.
k.

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6/4-6/2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1

- Added for Lohse-RO