ES-301 Administrative Topics Outline Form ES-301-1 Facility:
Point Beach Date of Examination:
7/15/2019 Examination Level: RO SRO Operating Test Number:
2019 Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations D
S Respond to Quadrant Power Tilt in Excess of Technical Specifications 2.1.7 (4.4/4.7)
Conduct of Operations D
R Perform a Pressurizer Heater Group Input Test Calculation 2.1.25 (3.9/4.2)
Equipment Control S
N Auxiliary Feedwater Lineup 2.2.15, (3.9/4.3)
Radiation Control D
R P
Determine a Stay Time for a High Radiation Area 2.3.7 (3.5/3.6) 2.3.12 (3.2/3.7) 2015 NRC Exam Emergency Plan N/A Not Applicable NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes and Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1, randomly selected)
ES-301 Administrative Topics Outline Form ES-301-1 Facility:
Point Beach Date of Examination:
7/15/2019 Examination Level: RO SRO Operating Test Number:
2019 Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations D
R Review Quadrant Power Tilt Manual Calculation 2.1.37 (4.3/4.6)
Conduct of Operations N
R Review a Pressurizer Heater Group Input Test Calculation 2.1.25 (3.9/4.2)
Equipment Control D
R Review Tagout 2.2.13, (4.1/4.3)
Radiation Control M
R Remove RMS Channel from Service 2.3.13 (3.4/3.8)
R S
Formulate Protective Action Recommendations 2.4.44 (2.4/4.4)
NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes and Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1, randomly selected)
ES-301 Administrative Topics Outline Form ES-301-1 Facility:
Point Beach Date of Examination:
7/15/2019 Examination Level: RO SRO Operating Test Number:
2019 Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations Conduct of Operations D
R Determination of Maximum Venting Time per Attachment B of CSP-I.3 2.1.25 (3.9/4.2)
Equipment Control Radiation Control Emergency Plan NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes and Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1, randomly selected)
- Added for Lohse-RO