ML22136A069

From kanterella
Jump to navigation Jump to search
Form ES-301-1
ML22136A069
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/19/2019
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
Florida Power & Light Energy Point Beach
Baker R
Shared Package
ML17215A928 List:
References
Download: ML22136A069 (3)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Point Beach Date of Examination: 7/15/2019 Examination Level: RO SRO Operating Test Number: 2019 Administrative Topic (see Note) Type Describe activity to be performed Code*

D Respond to Quadrant Power Tilt in Excess Conduct of Operations of Technical Specifications S 2.1.7 (4.4/4.7)

D Perform a Pressurizer Heater Group Input Conduct of Operations Test Calculation R

2.1.25 (3.9/4.2)

S Auxiliary Feedwater Lineup Equipment Control N 2.2.15, (3.9/4.3)

Determine a Stay Time for a High D Radiation Area Radiation Control R 2.3.7 (3.5/3.6)

P 2.3.12 (3.2/3.7) 2015 NRC Exam Emergency Plan N/A Not Applicable NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes and Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1, randomly selected)

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Point Beach Date of Examination: 7/15/2019 Examination Level: RO SRO Operating Test Number: 2019 Administrative Topic (see Note) Type Describe activity to be performed Code*

D Review Quadrant Power Tilt Manual Conduct of Operations Calculation R

2.1.37 (4.3/4.6)

N Review a Pressurizer Heater Group Input Conduct of Operations Test Calculation R

2.1.25 (3.9/4.2)

D Review Tagout Equipment Control R 2.2.13, (4.1/4.3)

M Remove RMS Channel from Service Radiation Control R 2.3.13 (3.4/3.8)

D Formulate Protective Action Emergency Plan R Recommendations S 2.4.44 (2.4/4.4)

NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes and Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1, randomly selected)

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Point Beach - Added for Lohse-RO Date of Examination: 7/15/2019 Examination Level: RO SRO Operating Test Number: 2019 Administrative Topic (see Note) Type Describe activity to be performed Code*

Conduct of Operations D

Determination of Maximum Venting Time Conduct of Operations per Attachment B of CSP-I.3 R

2.1.25 (3.9/4.2)

Equipment Control Radiation Control Emergency Plan NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).

  • Type Codes and Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)

(N)ew or (M)odified from bank ( 1)

(P)revious 2 exams ( 1, randomly selected)