ES-301 Transient and Event Checklist - Team 1 Form ES-301-5 Facility: Point Beach Date of Exam: 15 July 2019 Operating Test No.: 2019 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RO SRO-I SRO-U1 RX 0
1 1
0 NOR 2
2 2
1 1
1 I/C 1, 3, 4, 5, 7, 8 1, 3, 4, 5, 7, 8 12 4
4 2
MAJ 6
6 2
2 2
1 TS 1, 3 1, 2 4
0 2
2 RO1 SRO-I SRO-U RX 2
1 1
1 0
NOR 2
1 1
1 1
I/C 1, 3, 4, 5 1, 5, 7
7 4
4 2
MAJ 6
6 2
2 2
1 TS 0
0 2
2 RO2 SRO-I SRO-U RX 2
1 1
1 0
NOR 2
1 1
1 1
I/C 1, 7, 8
3, 4, 8 6
4 4
2 MAJ 6
6 2
2 2
1 TS 0
0 2
2 RO SRO-I SRO-U RX 0
1 1
0 NOR 0
1 1
1 I/C 0
4 4
2 MAJ 0
2 2
1 TS 0
0 2
2 Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist - Team 2 Form ES-301-5 ez Facility: Point Beach Date of Exam: 15 July 2019 Operating Test No.: 2019 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RO SRO-I SRO-U2 RX 0
1 1
0 NOR 2
1 1
1 1
I/C 1, 3, 4, 5, 7, 8 6
4 4
2 MAJ 6
1 2
2 1
TS 1, 3 2
0 2
2 RO SRO-I SRO-U3 RX 0
1 1
0 NOR 2
1 1
1 1
I/C 1, 3, 4, 5, 7, 8 6
4 4
2 MAJ 6
1 2
2 1
TS 1, 2 2
0 2
2 RO3 SRO-I SRO-U RX 2
1 1
1 0
NOR 2
1 1
1 1
I/C 1, 3, 4, 5 1, 5, 7
7 4
4 2
MAJ 6
6 2
2 2
1 TS 0
0 2
2 RO4 SRO-I SRO-U RX 2
1 1
1 0
NOR 2
1 1
1 1
I/C 1, 7, 8
3, 4, 8 6
4 4
2 MAJ 6
6 2
2 2
1 TS 0
0 2
2 Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
ES-301 Transient and Event Checklist - Team 3 Form ES-301-5 Facility: Point Beach Date of Exam: 15 July 2019 Operating Test No.: 2019 A
P P
L I
C A
N T
E V
E N
T T
Y P
E Scenarios 1
2 3
4 T
O T
A L
M I
N I
M U
M(*)
CREW POSITION CREW POSITION CREW POSITION CREW POSITION S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P R
I U
RO SRO-I1 SRO-U RX 2
1 1
1 0
NOR 2
1, 2 3
1 1
1 I/C 1, 3, 4, 5, 7, 8 3, 4, 8 3, 5, 8 12 4
4 2
MAJ 6
6 6
3 2
2 1
TS 1, 3 2
0 2
2 RO SRO-I2 SRO-U RX 2
1 1
1 0
NOR 2
1, 2 3
1 1
1 I/C 1, 3, 4, 5 1, 3, 4, 5, 7, 8 3, 4, 5, 7, 8 15 4
4 2
MAJ 6
6 6
3 2
2 1
TS 1, 2 1, 3 4
0 2
2 RO5 SRO-I SRO-U RX 2
1 1
1 0
NOR 2
2 2
1 1
1 I/C 1, 7, 8
1, 5, 7
3, 4, 7 9
4 4
2 MAJ 6
6 6
3 2
2 1
TS 0
0 2
2 RO SRO-I SRO-U RX 1
1 0
NOR 1
1 1
I/C 4
4 2
MAJ 2
2 1
TS 0
2 2
Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
- 3.
Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
- 4.
For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.