Letter Sequence Other |
---|
EPID:L-2021-LLA-0156, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation (Approved, Closed) |
|
MONTHYEARL-21-068, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation2021-08-29029 August 2021 License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation Project stage: Request ML21266A2222021-09-23023 September 2021 NRR E-mail Capture - Beaver Valley Loss of Power Diesel Generator Start and Bus Separation Instrument Project stage: Other ML22021A0292021-11-24024 November 2021 Engine Systems Inc., Part 21 - Swing Check Valve Pn ESI50359 Fax Project stage: Request ML21347A8832021-12-16016 December 2021 Audit Plan for Loss of Power Diesel Generator Start and Bus Separation Project stage: Other ML22068A1822022-03-0909 March 2022 NRR E-mail Capture - Beaver Valley Power Station, Units 1 & 2 - Request for Additional Information for License Amendment Request to Revise Technical Specification 3.3.5 Project stage: RAI ML22094A1152022-04-0404 April 2022 Response to a Request for Additional Information Regarding a Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation (EPID No. L-202 Project stage: Response to RAI ML22108A2922022-05-0202 May 2022 Summary of Regulatory Audit in Support of License Amendment Request to Revise TS 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation Project stage: Other ML22147A0392022-05-27027 May 2022 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Pennsylvania Regarding a Beaver Valley, Units 1 & 2 Amendment - Revise TS 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Separation Instrumentation Project stage: Other L-22-159, Supplement to a License Amendment Request Revising Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation2022-08-0202 August 2022 Supplement to a License Amendment Request Revising Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation Project stage: Supplement ML22222A0862022-09-0101 September 2022 Issuance of Amendment Nos. 317 and 208 Revise Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation Project stage: Approval 2022-03-09
[Table View] |
|
---|
Category:Audit Report
MONTHYEARML23124A3882023-05-16016 May 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Technical Specification 5.6.3, Core Operating Limits Reports (COLR) and TS 4.2.1 Fuel Assemblies ML22108A2922022-05-0202 May 2022 Summary of Regulatory Audit in Support of License Amendment Request to Revise TS 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation ML15292A1392015-11-0202 November 2015 Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML15203A1102015-07-28028 July 2015 Audit of the Licensee'S Management of Regulatory Commitments ML13295A6952013-11-21021 November 2013 Audit Report Regarding Seismic Walkdowns to Support Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident - Beaver Valley Power Station Units 1 and 2 ML1211403002012-04-30030 April 2012 Audit of the Licensee'S Management of Regulatory Commitments ML0904001722009-02-18018 February 2009 Audit of the Licensee'S Management of Regulatory Commitments (TAC Nos. MD9851 and MD9852) ML0821408382008-11-0505 November 2008 License Renewal Application Audit Report ML0919402152008-08-24024 August 2008 Audit Summary Regarding the License Renewal Application for Beaver Valley Power Station, Units 1 and 2 2023-05-16
[Table view] Category:Letter
MONTHYEARML24025A0922024-01-25025 January 2024 Requalification Program Inspection L-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 IR 05000334/20230112023-12-0404 December 2023 Age-Related Degradation Inspection Report 05000334/2023011 and 05000412/2023011 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports IR 05000334/20233012023-11-27027 November 2023 Initial Operator Licensing Examination Report 05000334/2023301 L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000334/20230032023-11-0606 November 2023 Integrated Inspection Report 05000334/2023003 and 05000412/2023003 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23198A3592023-10-0202 October 2023 Issuance of Amendment Nos. 322 and 212 Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident (EPID L-2022-LLA-0129) - Nonproprietary IR 05000334/20234022023-09-29029 September 2023 Security Baseline Inspection Report 05000334/2023402 and 05000412/2023402 (Cover Letter Only) ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure IR 05000334/20234012023-09-21021 September 2023 Cybersecurity Inspection Report 05000334/2023401 and 05000412/2023401 (Cover Letter Only) ML23263A0192023-09-20020 September 2023 Operator Licensing Examination Approval ML23243A9272023-09-19019 September 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23249A1842023-09-18018 September 2023 Authorization and Safety Evaluation for Alternative Request No. 2-TYP-4-RV-06 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments IR 05000334/20230052023-08-31031 August 2023 Updated Inspection Plan for Beaver Valley Power Station Units 1 and 2 (Report 05000334/2023005 and 05000412/2023005) L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000334/20230022023-08-0909 August 2023 Integrated Inspection Report 05000334/2023002 and 05000412/2023002 ML23219A0592023-08-0707 August 2023 Steam Generator Inspection Reports - Spring 2023 Spring Refueling Outrage L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 ML23188A0982023-07-17017 July 2023 Correction to the Safety Evaluation Issued Related to Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time ML23188A0672023-07-10010 July 2023 Project Manager Assignment L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report ML23157A1072023-06-0707 June 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000334/2023011 and 05000412/2023011 ML23143A0272023-05-23023 May 2023 Licensed Operator Positive Fitness-For-Duty Test L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 ML23102A1472023-05-22022 May 2023 Issuance of Amendment Nos. 321 and 211 Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23135A7872023-05-19019 May 2023 Summary of Conference Calls Regarding the Spring 2023 Steam Generator Tube Inspections L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report ML23124A3882023-05-16016 May 2023 Summary of Regulatory Audit in Support of License Amendment Request to Revise Technical Specification 5.6.3, Core Operating Limits Reports (COLR) and TS 4.2.1 Fuel Assemblies ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000334/20230012023-05-0808 May 2023 Integrated Inspection Report 05000334/2023001 and 05000412/2023001 L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations ML23118A3812023-04-28028 April 2023 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-04-20020 April 2023 ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments ML23107A2502023-04-18018 April 2023 Requalification Program Inspection 2024-01-25
[Table view] |
Text
May 2, 2022 Mr. John J. Grabnar Site Vice President Energy Harbor Nuclear Corp.
Beaver Valley Power Station Mail Stop P-BV-SSEB P.O. Box 4, Route 168 Shippingport, PA 15077-0004
SUBJECT:
BEAVER VALLEY POWER STATION, UNITS 1 AND 2 -
SUMMARY
OF REGULATORY AUDIT IN SUPPORT OF LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 3.3.5, LOSS OF POWER (LOP)
DIESEL GENERATOR (DG) START AND BUS SEPARATION INSTRUMENTATION (EPID L-2021-LLA-0156)
Dear Mr. Grabnar:
By letter dated August 29, 2021 (Agencywide Document Access Management System (ADAMS) Accession No. ML21242A125), Energy Harbor Nuclear Corp. (the licensee) requested an amendment to Facility Operating License Nos. DPR-66 and NPF-73 for the Beaver Valley Power Station (Beaver Valley), Unit Nos. 1 and 2. The proposed amendment would revise the Technical Specification (TS) 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation.
The U.S. Nuclear Regulatory Commission (NRC) staff conducted a virtual audit to support its review of the license amendment request (LAR) using an internet-based portal provided by the licensee. An audit plan was issued by the NRC staff by letter dated November 24, 2021 (ADAMS Accession No. ML21328A030). Using the portal, the NRC staff reviewed calculations and analyses related to the LAR but not available on the Beaver Valley dockets.
Following the audit, the NRC staff identified and requested additional information via e-mail dated March 9, 2022 (ADAMS Accession No. ML22068A182). The licensee provided responses to the NRC staffs requests for additional information via letter dated April 4, 2022 (ADAMS Accession No. ML22094A115).
The enclosure to this letter is the regulatory audit summary.
J. Grabnar If you have any questions, please contact me at 301-415-0680 or by e-mail to Brent.Ballard@nrc.gov.
Sincerely, Digitally signed by Brent Brent T. T. Ballard Date: 2022.05.02 Ballard 13:32:24 -04'00' Brent T. Ballard, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412
Enclosure:
Regulatory Audit Summary cc: Listserv
OFFICE OF NUCLEAR REACTOR REGULATION REGULATORY AUDIT
SUMMARY
TO SUPPORT REVIEW OF LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 3.3.5, LOSS OF POWER (LOP) DIESEL GENERATOR (DG) START AND BUS SEPARATION INSTRUMENTATION BEAVER VALLEY POWER STATION, UNITS 1 AND 2 DOCKET NOS. 50-334 AND 50-412
1.0 BACKGROUND
By letter dated August 29, 2021 (Agency wide Document Access Management System (ADAMS) Accession No. ML21242A125), Energy Harbor Nuclear Corp. (the licensee) requested an amendment to Facility Operating License Nos. DPR-66 and NPF-73 for the Beaver Valley Power Station, Unit Nos. 1 and 2. The proposed amendment would revise the Technical Specification (TS) 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation.
An audit plan was issued by the U.S. Nuclear Regulatory Commission (NRC) staff by letter dated November 24, 2021 (ADAMS Accession No. ML21328A030). The scope of the audit was to gain a better understanding of the LAR, to verify information provided in the LAR, and to identify any information that may require docketing to support the basis of the NRC staffs licensing decision. The NRC staff performed an audit of the calculations performed by the licensee related to the LAR, via an internet-based portal.
2.0 AUDIT DATES AND LOCATION The regulatory audit was conducted via an internet-based portal provided by the licensee in the months of January and February 2022.
3.0 AUDIT TEAM MEMBERS The NRC audit team members consisted of:
Vijay Goel, Electrical Engineer, Team Leader Richard Stattel, Senior Electronics Engineer Vu Hang, Electronics Engineer Nadim Khan, Electrical Engineer Enclosure
4.0 DOCUMENTS AUDITED The following documents related to the LAR were reviewed during the audit:
a) Calculations/analyses performed to determine analytic limits of the Loss of Voltage Relays and Degraded Voltage Relays.
In particular, the following documents were reviewed:
Calculation No. 8700-E-345, Rev. 1 for BVPS [Beaver Valley Power Station]-1, Voltage and Time Delays Analysis for Unit 1 Undervoltage Protection Scheme.
Calculation No. 10080-E-346, Rev. 1 for BVPS-2, Voltage and Time Delays Analysis for Unit 2 Undervoltage Protection Scheme.
Calculation No. 8700-E-271, Rev. 3, Addendum 4 for BVPS-1, Station Service System Dynamic Stability Study.
Calculation No. 10080-E-271, Rev. 1, Addendum 6 and 7 for BVPS-2 Transient Stability Analysis.
b) Calculations/analyses performed to determine the proposed nominal trip setpoints and allowable values of (1) the existing Loss of Voltage Relays and (2) the time delays for the new Degraded Voltage Relays.
In particular, the following documents were reviewed:
Westinghouse Topical Reports:
- WCAP-11419, Revision 6, (for BVPS-1) and
- WCAP-11366, Revision 7, (for BVSP-2).
Calculation No. 8700-DEC-0212, Revision 2, "Beaver Valley Unit 1, 4.1 kV Emergency Bus Undervoltage: Trip Feed and Start Diesel Uncertainty Calculations".
Calculation No. 10080-DEC-0215, Revision 2, "Beaver Valley Unit 2, 4.1 kV Emergency Bus Undervoltage: Trip Feed and Start Diesel Uncertainty Calculations".
Calculation No. E-529, Revision 1, "Beaver Valley Units 1 and 2, Degraded Voltage Relay (DVR) Time Delay Relay Instrument Uncertainty".
The NRC staff did not download, copy or retain possession of any documents that were made available to the audit team.
5.0 AUDIT ACTIVITIES The audit was conducted by reviewing the relevant portions of calculations/analyses listed in Section 4.0, via internet-based portal. The focus of the audit was to gain a better understanding of the LAR, to verify information provided in the LAR, and to identify information that may require docketing to support the basis of the NRC staffs licensing decision. Aside from verifying that the documents requested by the staff were accessible on the internet-based portal, there were no person-to-person interactions between the audit team and the licensee.
The NRC staff verified that the information in the LAR agreed with the information provided in the documents provided on the internet-based portal. Based on the review of the documents, the NRC staff identified and requested additional information via e-mail dated March 9, 2022 (ADAMS Accession No. ML22068A182). The licensee provided responses to the NRC staffs requests for additional information via letter dated April 4, 2022 (ADAMS Accession No. ML22094A115).
There were no deviations from the audit plan. No regulatory decisions were made during the audit.
6.0 EXIT BRIEFING The audit was performed via internet-based portal, and there were no person-to-person interactions between the audit team and the licensee. Therefore, there was no need of a formal exit briefing.
ML22108A292 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA NRR/DEX/EEEB/BC NAME BBallard KZeleznock WMorton DATE 04/18/2022 04/19/2022 04/29/2022 OFFICE NRR/DEX/EICB/BC NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM NAME MWaters JDanna BBallard DATE 04/28/2022 04/29/2022 05/02/2022