ML22090A271

From kanterella
Jump to navigation Jump to search
Constellation Response to Beyond Nuclear and Staff Views in Response to CLI-22-04
ML22090A271
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/31/2022
From: Ferraro D, Leidich A, Doris Lewis
Constellation Energy Generation, Pillsbury, Winthrop, Shaw, Pittman, LLP
To:
NRC/OCM
SECY RAS
References
50-277-SLR, 50-278-SLR, ASLBP 19-960-01-SLR-BD01, RAS 56380
Download: ML22090A271 (9)


Text

March 31, 2022

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

Before the Commission

In the Matter of )

)

Constellation Energy Generation, LLC ) Docket Nos. 50-277-SLR (f/k/a Exelon Generation Company, LLC) ) 50-278-SLR

)

Peach Bottom Atomic Power Station, )

Units 2 and 3 )

Constellation Response to the NRC Staff and Beyond Nuclear Views in Response to CLI-22-04

Pursuant to the Commissions direction in CLI-22-04, Memorandum and Order

(February 24, 2022), Constellation Energy Generation, LLC (Constellation, formerly known as

Exelon Generation Company, LLC) hereby submits its response to the views submitted by the

NRC Staff and Beyond Nuclear on the practical effects of (1) the subsequent renewed licenses

continuing in place and (2) the previous licenses being reinstated.1

In its views, the NRC Staff articulated, and Constellation agrees with, the difficulty in

rescinding the subsequent renewed licenses (SLR licenses) for the Peach Bottom Atomic

Power Station, Units 2 and 3 (Peach Bottom) and the significant impact that would have to the

current licensing basis. As the Staff aptly put it, [v]acating the SLR licenses would have the

practical effect of [] vacating each of the amendments, orders, license conditions, exemptions,

and changes to technical specifications included in the SLR licenses or approved after their

1 Beyond Nuclears Response to Constellation Energys Petition for Partial Reconsideration of CLI-22-04 and Beyond Nuclears Views in Response to CLI-22-04 (Mar. 17, 2022) (ADAMS Accession No. ML22076A089)

(hereinafter Beyond Nuclear Views). NRC Staff Views on the Practical Effects of (1) the Subsequent Renewed Licenses Continuing in Place and (2) the Previous Licenses Being Reinstated (Mar. 21, 2022) (ADAMS Accession No. ML22080A274) (hereinafter NRC Staff Views).

4868-5828-6104.v1 issuance.2 This would have the practical effect of removal of all requirements imposed by, and

permissions granted by, the amendments made to the SLR licenses.3 As an example, the prior

licenses simply do not require the new and improved programs SLR licenses [sic] are currently

required to implement,4 such as the eleven new aging management programs identified by the

NRC Staff as an example.5 As a result, the licensee would not be required to implement those

programs.6 Reinstating the prior license would also render the Updated Final Safety Analysis

Report (UFSAR) obsolete,7 and result[] in the plant and its UFSAR being incongruent with

[the] restored license.8 This would require the licensee to determine how best to modify the

UFSAR to assure that the current UFSAR reflects the new [current licensing basis], potentially

requiring license amendment requests.9

Unlike the NRC Staff, in its views on practical effects, Beyond Nuclear ignores the

significant negative impacts of vaca ting the subsequent renewed licenses and instead claims that

from the practical standpoint of implementi ng NEPA, it would be preferable to vacate the

subsequent renewed license and restore Constellations initial renewed license.10 On the

contrary, for the reasons set forth below, revoking the subsequent renewed licenses for Peach

Bottom is both unnecessary and an excessive response to the NEPA issue the Commission

directed the Staff to address.

2 NRC Staff Views at 8.

3 Id. at 10.

4 Id. at 8

5 Id. at 6.

6 Id. at 8.

7 Id. at 9.

8 Id. at 10.

9 Id. at 9.

10 Beyond Nuclear Views at 14.

2 4868-5828-6104.v1 Instead, based on consideration of the factors set forth in Oglala Sioux Tribe v. NRC, 896

F.3d 520 (D.C. Cir. 2018) and Allied-Signal, Inc. v. NRC, 988 F.2d 146 (D.C. Cir. 1993), the

Commission should direct the NRC Staff to revise the Peach Bottom subsequent renewed

licenses to restore the expirati on dates, pending completion of the additional environmental

review.11 For the reasons stated in Constellations previous submittals,12 maintaining the

subsequent renewed licenses in place with 2053/2054 expiration dates is consistent with the

standards set forth in the Oglala Sioux and Allied-Signal cases, and would avoid unnecessary

disruptive effects while causing harm to no one.

Beyond Nuclear incorrectly argues that from a practical standpoint it would be preferable

to vacate the subsequent renewed licenses as that would bring NRC into line with judicial

precedents.13 However, vacatur in the case cited by Beyond Nuclear was prompted by an

absence of a NEPA analysis and, as a result, had far different practical impacts than in this case.

Citing Standing Rock Sioux Tribe v. United States Army Corps of Engineers, 985 F.3d 1032

(D.C. Cir. 2021), Beyond Nuclear asserts that the failure to provide required notice and invite

public comment constitutes a fundamental flaw that normally requires vacatur. 14 Standing Rock,

11 Pursuant to the direction in CLI-22-04, on March 25, 2022, the NRC Staff amended the subsequent renewed licenses for Peach Bottom, Units 2 and 3, to change the expiration dates from 2053 and 2054 to 2033 and 2034, respectively. Peach Bottom Atomic Power Station, Units 2 and 3 Modification to Renewed Facility Operating License Nos. DPR-44 and DPR-56 in Conjunction with the Commission Memorandum and Order CLI-22-02 (Mar. 25, 2022) (ADAMS Accession No. ML22073A193). In CLI-22-04, however, the Commission stated that after considering the briefing on the practical effects of maintaining the subsequent renewed licenses or reinstating the previous licenses, it will issue a subsequent order providing additional direction, if any, regarding the status of the licenses. CLI-22-04, slip op. at 4.

12 Constellation Energy Generations Petition for Partial Reconsideration of CLI-22-04 (Mar. 7, 2022) (ADAMS Accession No. ML22066B335); Constellations Response to the Commissions Request for Views in CLI-22-04 (Mar. 21, 2022) (ADAMS Accession No. ML22080A250).

13 Beyond Nuclear Views at 14.

14 Id. at 10.

3 4868-5828-6104.v1 however, involved a failure by the agency to prepare any environmental impact statement on a

proposed action, even after a previous remand.15

In contrast, here the NRC prepared not only its generic environmental impact statement

(GEIS) on license renewal16 (which specifically defined the license renewal term that it

analyzed as the period of time past the original or current license term for which the renewed

license is in force17 and which included notice and public comment),18 but also a site-specific

supplement for the Peach Bottom subsequent license renewal.19 For each Category 1 issue, the

supplemental EIS considered whether there was any new and significant information that might

alter the conclusions reached in the GEIS for that issue20 (as Constellation had previously

considered in its Environmental Report). The supplemental EIS included a cumulative impacts

analysis that considered potential effects through the end of the current license term, as well as

through the 20-year renewal license term.21 Before drafting the supplemental EIS for Peach

Bottom, the NRC Staff conducted a scoping process that included public meetings22 and then

provided a 45-day period (including another public meeting) for public comments on the draft.23

The notices of these multiple opportunities for public comment clearly informed the public that

the supplemental EIS addressed subsequent license renewal.24 In short, the environmental

15 Standing Rock, 985 F.3d at 1051.

16 NUREG-1437, Revision 1, Generic Environmental Imp act Statement for License Renewal of Nuclear Plants (June 2013) (2013 GEIS).

17 Id. at 7-27 (emphasis added).

18 See id. at S-2.

19 Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 10, Second Renewal Regarding Subsequent License Renewal for Peach Bottom Atomic Power Station Units 2 and 3 (Jan.

2020) (Peach Bottom SEIS) (ADAMS Accession No. ML20023A937).

20 Id. at 4-2, 4-112 to 4-113.

21 Id. at 4-123.

22 See id. at 1-2.

23 Id. See also 84 Fed. Reg. 38,676 (Aug. 7, 2019); 83 Fed. Reg. 45,692 (Sep. 10, 2018).

24 84 Fed. Reg. 38,676 (Aug. 7, 2019); 83 Fed. Reg. 45,692 (Sep. 10, 2018).

4 4868-5828-6104.v1 review in this proceeding was in no way similar to the unsupported agency action in Standing

Rock, or one where no notice or opportunity for public comment was provided as Beyond

Nuclear suggests.

Further, the supplemental EIS for Peach Bottom specifically addressed and explained

why uncertainties and knowledge gaps alleged by Beyond Nuclear in the understanding of aging

effects would not alter the SMALL impact findings in the GEIS.25 And although impact of

design basis accidents is a Category 1 issue, th e supplemental EIS for Peach Bottom included an

analysis explaining why those impacts remain SMALL for subsequent license renewal.26

Beyond Nuclears reliance on Standing Rock is also misplaced because the agency action

in that proceeding had immediate and ongoing environmental effects warranting vacatur.

Indeed, in Standing Rock one of the practical effects of vacatur was to eliminate the risk of a spill

from the then-operating Dakota Access Pipeline.27 No such justification exists in this case.

Beyond Nuclear essentially ignores the teaching in Oglala Sioux that vacatur is not required

(even when a deficiency in the NEPA review is deemed significant) when it would result in

disruptive effects and no harm would occur from a disposition that leaves the license in effect for

now.28 That is exactly the situation in this proceeding, where the subsequent period of extended

operation (and any environmental effects from it) will not commence for over a decade, giving

the NRC Staff ample time to clarify the applicability of the Category 1 findings to subsequent

25 Peach Bottom SEIS at A-4.

26 Id. at E-2 ([B]ecause of the requirements that the existing design basis and aging management programs be in effect for license renewal, the environmental impacts of design-basis accidents as calculated for the original operating license application should not differ significantly from the environmental impacts of design-basis accidents at any other time during plant operations, including during the initial license renewal and subsequent renewal periods.).

27 Standing Rock, 985 F.3d at 1051.

28 Oglala Sioux, 896 F.3d at 538. Accord Powertech (USA), Inc. (Dewey-Burdock In Situ Uranium Recovery Facility), CLI-19-1, 89 N.R.C. 1, 11 (2019).

5 4868-5828-6104.v1 license renewal. As Beyond Nuclear acknowledges, it is unlikely that the process for preparing a

new GEIS for subsequent license renewal will take as many as ten years. 29 In short, keeping the

subsequent renewed licenses in place would cause no harm: to the environment, to NEPA, or to

the public. Indeed, as there is no harm in doing so, the Commission should direct the NRC Staff

to restore the 2053/2054 expiration dates in those licenses.

Nor is there any merit to Beyond Nuclears claim that if Constellations subsequent

renewed license remains in place, it... signal[s] a belief that the NEPA process will not result in

any meaningful insights or changes.30 Leaving the subsequent renewed licenses in place (and

restoring the expiration dates) would merely signal that there is no need to take any precipitous

disruptive action, given that there is ample time to clarify the applicability of the 2013 GEIS to

subsequent license renewal before any associated effects will occur. Further, there is nothing in

the record of this proceeding establishing that the environmental effects of Category 1 issues

evaluated in the 2013 GEIS will not be the same in a second period of extended operation as in

the first, as Beyond Nuclear presumes. As the Commission acknowledged in CLI-22-02, the

Staff may have intended the 2013 GEIS to address subsequent license renewal,31 and as

discussed above, both Constellation and the NRC Staff considered whether there was any new

and significant information affecting the applicability of the Category 1 findings to Peach

Bottom. As a result, when the NRC Staff performs its revision to the 2013 GEIS, it may well be

the case that all the analyses of Category 1 issues in the 2013 GEIS are found to be applicable to

Peach Bottom in the second period of extended operation.

29 Beyond Nuclear Views at 13.

30 Id. at 15.

31 CLI-22-02, slip op. at 10.

6 4868-5828-6104.v1 Amending the expiration dates in the Peach Bottom subsequent renewed licenses has also

already had the practical effect of confusing the public and Beyond Nuclear. In an attempt to

dismiss Constellations observation that amending the expiration dates in the Peach Bottom

subsequent renewed licenses creates confusion regarding Constellations statutory right to

continue to operate under the timely renewal provision of the Administrative Procedure Act,

Beyond Nuclear argues that nothing in CLI-22-04 would appear to prevent Constellation from

seeking timely renewal of its shortened extended license renewal term several years from

now.32 Rather than refuting Constellations observation, Beyond Nuclears argument in fact

demonstrates the confusion created by amending the license expiration dates. Because

Constellations subsequent license renewal application has not been finally determined by the

NRC, the timely renewal provision in the Adminis trative Procedure Act is already and remains

applicable.33 Constellation does not need to seek timely renewal twice for the same period of

extended operation; yet the Commissions decision has clearly misled Beyond Nuclear to believe

otherwise.

Finally, there is no merit to Beyond Nuclears suggestion that revoking the Peach Bottom

subsequent renewed licenses would have no effect on the aging management commitments and

program enhancements currently required as a condition in the subsequent renewed licenses.

Beyond Nuclear asserts that [h]aving completed a safety review and offered an opportunity for

a public hearing on Constellations revised Aging Management Plan (AMP), the Commission

may declare that Constellations initial renewed license has effectively been amended, with the

required procedures for fairness and due process, to incorporate the revised AMP.34 In support

32 Beyond Nuclear Views at 13.

33 5 U.S.C. § 558(c).

34 Beyond Nuclear Views at 15.

7 4868-5828-6104.v1 of this assertion, Beyond Nuclear relies on Amergen Energy Co., LLC (Oyster Creek Nuclear

Generating Station), CLI-8-13, 67 N.R.C. 396, 400 (2008). This case, however, only supports

the possibility that a subsequent renewed license could be conditioned as a result of

administrative review and says nothing about imposing conditions in a prior license. If the

subsequent renewed licenses were revoked, any attempt to impose new conditions on operation

during the initial renewal term would need to comply with the backfit rule.35

In sum, the Beyond Nuclear Views only further demonstrate why the Commission should

not vacate the subsequent renewed licenses. Instead, for the reasons stated in Constellations

Petition for Partial Reconsideration of CLI-22-04 and Constellations Response to the

Commissions Request for Views in CLI-22-04, the Commission should permit the licenses to

continue in place and direct the NRC Staff to restore the 2053/2054 expiration dates while the

Staff revisits its NEPA analysis.

Respectfully submitted,

Donald P. Ferraro /signed electronically by David R. Lewis/

Assistant General Counsel David R. Lewis Constellation Energy Generation, LLC Anne Leidich 200 Exelon Way, Suite 305 PILLSBURY WINTHROP SHAW Kennett Square, PA 19348 PITTMAN LLP Telephone: 610.765.5381 1200 Seventeenth Street, NW E-mail: donald.ferraro@constellation.com Washington, DC 20036 Telephone: 202-663-8474 Facsimile: 202-663-8007 david.lewis@pillsburylaw.com

March 31, 2022 Counsel for Constellation

35 10 C.F.R. § 50.109.

8 4868-5828-6104.v1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

Before the Commission

In the Matter of )

)

Constellation Energy Generation, LLC ) Docket Nos. 50-277-SLR (f/k/a Exelon Generation Company, LLC) ) 50-278-SLR

)

Peach Bottom Atomic Power Station, )

Units 2 and 3 )

CERTIFICATE OF SERVICE

I hereby certify that copies of the foregoing Constellation Response to the NRC Staff and

Beyond Nuclear Views in Response to CLI-22-04 has been served through the E-Filing system

on the participants in the above-captioned proceeding this 31st day of March, 2022.

/signed electronically by David R. Lewis/

David R. Lewis

4868-5828-6104.v1