IR 05000280/2022405
| ML22081A092 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 03/22/2022 |
| From: | Stewart Bailey NRC/RGN-II/DRP/RPB4 |
| To: | Stoddard D Virginia Electric & Power Co (VEPCO) |
| References | |
| IR 2022405 | |
| Download: ML22081A092 (3) | |
Text
March 22, 2022
SUBJECT:
SURRY POWER STATION - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000280/2022405 AND 05000281/2022405 (OUO REMOVED)
Dear Mr. Stoddard:
On March 3, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Surry Power Station and discussed the results of this inspection with Mr. Richard Philpot, Acting Director of Safety and Licensing, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Stewart N. Bailey, Chief Reactor Projects Branch 4 Division of Reactor Projects
Docket Nos. 05000280 and 05000281 License Nos. DPR-32 and DPR-37
cc w/Enclosure:
R. Jones, Nuclear Protection Services cc w/o Enclosure: Distribution via LISTSERV
ML22081A092 (Cover letter)
Cover Letter Only:
X SUNSI Review X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available OFFICE RII:DRP RII:DRP
NAME MToth SBailey
DATE 3/14/2022 3/22/2022