ML22013A663

From kanterella
Jump to navigation Jump to search
Amendment 31 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance
ML22013A663
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 11/11/2021
From:
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML22013A681 List:
References
L-2021-177
Download: ML22013A663 (4)


Text

LIST OF EFFECTIVE PAGES CHAPTER 17 QUALITY ASSURANCE Page Amendment Page Amendment 17-1 28 17-i 12 17.1-1 0 17.2-1 22 UNIT 1 17-1 Amendment No. 28 (05/17)

QUALITY ASSURANCE CHAPTER 17 TABLE OF CONTENTS Section Title Page 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION 17.1-1 17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE 17.2-1 17-i Amendment No. 12, (12/93)

CHAPTER 17 QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section is not applicable to the FSAR.

17.1-1

17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE Reference 1, FPL Quality Assurance Topical Report (QATR), describes the methods and establishes quality assurance program and administrative control requirements which comply with the criteria of 10 CFR 50 Appendix B, and meets the requirements of Regulatory Guides and industry standards.

Reference 2 transmitted the NRC Safety Evaluation that documented approval of the QATR at St. Lucie.

NOTE: All future proposed changes to this section shall be reviewed/evaluated pursuant to 10 CFR 50.54(a).

REFERENCES

1. Florida Power and Light Company, FPL Energy Seabrook, LLC, and FPL Energy Duane Arnold, LLC Quality Assurance Topical Report, FPL-1.
2. B.T. Moroney (NRC) to J.A. Stall (FPL), Florida Power and Light Company, FPL Energy Seabrook, LLC, and FPL Energy Duane Arnold, LLC - Approval of Common Quality Assurance Topical Report, December 29, 2006.

17.2-1 Amendment No. 22 (05/07)