ML21327A382
| ML21327A382 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 06/16/2021 |
| From: | Joseph Demarshall NRC/RGN-III/DRS/OLB |
| To: | DTE Energy |
| Demarshall J | |
| Shared Package | |
| ML20055D900 | List: |
| References | |
| NRC-21-0039 | |
| Download: ML21327A382 (1) | |
Text
ES-401 Record of Rejected K/As Form ES-401-4 Page 1 of 1 Tier / Group Randomly Selected K/A Reason for Rejection Tier 2 / Group 1
206000 A2.08 RO Q31 NRC was unable to develop an operationally valid and discriminating RO level question to test the selected K/A (Ability to (a) predict the impacts of the following on the HIGH PRESSURE COOLANT INJECTION SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: High suppression pool temperature: BWR-2,3,4). (IR 3.9) 3/11/20 - CHIEF EXAMINER randomly re-selected K/A A2.01 for Q31:
Ability to (a) predict the impacts of the following on the HIGH PRESSURE COOLANT INJECTION SYSTEM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Turbine trips: BWR-2,3,4. (IR 4.0)
Tier 3 G2.4.39 RO Q73 Overlap/balance of coverage concern between the randomly selected Generic K/A G2.4.39, Knowledge of RO responsibilities in emergency plan implementation, and the RO Emergency Plan Administrative Topics JPM on the Operating Test.
3/16/20 - CHIEF EXAMINER randomly re-selected K/A G2.4.17 for Q73:
Knowledge of EOP terms and definitions. (IR 3.9)
Tier 1 / Group 1
295016 AK3.02 RO Q6 NRC was unable to develop an operationally valid and discriminating RO level question to test the selected K/A (Knowledge of the reasons for the following responses as they apply to CONTROL ROOM ABANDONMENT: Turbine trip). (IR 3.7) 3/20/2020 - CHIEF EXAMINER randomly re-selected K/A AK3.03 for Q6:
Knowledge of the reasons for the following responses as they apply to CONTROL ROOM ABANDONMENT: Disabling control room controls. (IR 3.5)
Tier 1 / Group 2
295008 AK2.09 RO Q23 Overlap/balance of coverage concern between randomly selected Abnormal Plant Evolution (APE) #295008, K/A AK2.09, Knowledge of the interrelations between HIGH REACTOR WATER LEVEL and the following: Reactor water cleanup system (ability to drain): Plant-Specific, and Control Room Systems JPM b for Safety Function 2. on the Operating Test..
3/24/20 - CHIEF EXAMINER randomly re-selected K/A AK2.03 for Q23:
Knowledge of the interrelations between HIGH REACTOR WATER LEVEL and the following: Reactor water level control. (IP 3.6)
Tier 1 / Group 1
295038 EK2.04 RO Q18 NRC was unable to develop an operationally valid and discriminating RO level question to test the selected K/A (Knowledge of the interrelations between HIGH OFF-SITE RELEASE RATE and the following: Stack-gas monitoring system Plant-Specific). (IR 3.9) 4/13/20 - CHIEF EXAMINER randomly re-selected K/A EK2.07 for Q18:
Knowledge of the interrelations between HIGH OFF-SITE RELEASE RATE and the following: Control room ventilation. (IR 3.5)
Tier 3 G2.1.39 RO Q67 NRC was unable to develop an operationally valid and discriminating RO level question that would test and maintain a plant-wide generic focus for the selected Tier 3 K/A (Knowledge of conservative decision making practices). (IR 3.6) 4/24/20 - CHIEF EXAMINER randomly re-selected K/A G2.1.3 for Q67:
Knowledge of shift or short-term relief turnover practices. (IR 3.7)