SBK-L-21106, Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program
From kanterella
(Redirected from ML21277A388)
Jump to navigation
Jump to search
Letter Sequence Request | |
---|---|
EPID:L-2022-LRM-0016, Meeting Summary Re Presubmittal Meeting for PTL Curve Changes for Seabrook (Open) | |
MONTHYEARSBK-L-21106, Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program2021-09-30030 September 2021
[Table View]Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program Project stage: Request PMNS20220108, Notice of Meeting with NextEra Energy Seabrook, LLC2022-02-0909 February 2022 Notice of Meeting with NextEra Energy Seabrook, LLC Project stage: Request ML22146A3402022-02-0909 February 2022, 23 February 2022, 13 June 2022 Meeting Summary Re Presubmittal Meeting for PTL Curve Changes for Seabrook Project stage: Request ML22146A3472022-02-23023 February 2022 Slides - Pre-Submittal Meeting for February 23 with Nextera Energy Seabrook, LLC Regarding Planned Submittal of License Amendment Request to Update Pressure-Temperature Limits Curves Period of Applicability Project stage: Meeting ML22146A3422022-06-13013 June 2022 February 23, Summary of Meetings with Nextera Energy Seabrook, LLC Regarding Planned Submittal of License Amendment Request to Update Pressure-Temperature Limits Curves Period of Applicability Project stage: Meeting 2022-02-23 |
ML21277A388 | |
Person / Time | |
---|---|
Site: | Seabrook |
Issue date: | 09/30/2021 |
From: | Levander M NextEra Energy Seabrook |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
SBK-L-21106 | |
Download: ML21277A388 (284) | |
Similar Documents at Seabrook | |
---|---|
Category:Letter type:SBK
MONTHYEARSBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024
[Table view]2023 Annual Environmental Operating Report SBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report SBK-L-22093, 75 Day and 150 Day Submittal Letters2022-12-0101 December 2022 75 Day and 150 Day Submittal Letters SBK-L-22113, Radiological Emergency Plan (Ssrep), Revision 792022-11-16016 November 2022 Radiological Emergency Plan (Ssrep), Revision 79 SBK-L-22114, Independent Spent Fuel Storage Installation (Isfsi), Cask Registration2022-11-0909 November 2022 Independent Spent Fuel Storage Installation (Isfsi), Cask Registration SBK-L-22112, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2022-11-0303 November 2022 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration SBK-L-22094, Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)2022-10-26026 October 2022 Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) SBK-L-22105, Supplement to 2021 Annual Radioactive Effluent Release Report2022-10-24024 October 2022 Supplement to 2021 Annual Radioactive Effluent Release Report SBK-L-22103, 5 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan2022-10-12012 October 2022 5 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan SBK-L-22102, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2022-10-0606 October 2022 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration SBK-L-22080, Submittal of 10 CFR 72.48 Report of Changes, Tests and Experiments for August 2020 to July 20222022-08-12012 August 2022 Submittal of 10 CFR 72.48 Report of Changes, Tests and Experiments for August 2020 to July 2022 SBK-L-22054, SBK-L-22054 - License Amendment Request 22-01, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0909 June 2022 SBK-L-22054 - License Amendment Request 22-01, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections SBK-L-22042, 1 to Updated Final Safety Analysis Report, Cover Letter and Information on Enclosures 1 to 72022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Cover Letter and Information on Enclosures 1 to 7 SBK-L-22044, 2021 Annual Radioactive Effluent Release Report2022-04-29029 April 2022 2021 Annual Radioactive Effluent Release Report SBK-L-22036, Steam Generator Tube Inspection Report2022-04-25025 April 2022 Steam Generator Tube Inspection Report SBK-L-22040, Radiological Emergency Plan (Ssrep), Revision 7822022-04-20020 April 2022 Radiological Emergency Plan (Ssrep), Revision 782 SBK-L-22024, Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2022-03-0707 March 2022 Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-22003, Inservice Inspection Examination Report2022-01-24024 January 2022 Inservice Inspection Examination Report SBK-L-21126, Fourth 10 Year Interval - Inservice Inspection (ISI) Program Plan2022-01-0404 January 2022 Fourth 10 Year Interval - Inservice Inspection (ISI) Program Plan SBK-L-21135, Submittal of Changes to the Seabrook Station Technical Specification Bases2021-12-29029 December 2021 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-21108, Core Operating Limits Report for Cycle 222021-11-0404 November 2021 Core Operating Limits Report for Cycle 22 SBK-L-21106, Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program2021-09-30030 September 2021 Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program SBK-L-21105, Withdrawal of Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension2021-09-27027 September 2021 Withdrawal of Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension SBK-L-21103, Request for Exercise of Enforcement Discretion2021-09-25025 September 2021 Request for Exercise of Enforcement Discretion SBK-L-21104, Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink Onetime Allowed Outage Time (AOT) Extension2021-09-25025 September 2021 Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink Onetime Allowed Outage Time (AOT) Extension SBK-L-21098, Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-09-22022 September 2021 Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-21083, NextEra Energy Seabrook, LLC - Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage2021-08-18018 August 2021 NextEra Energy Seabrook, LLC - Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage SBK-L-21067, License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-07-21021 July 2021 License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-21049, Revision to Updated Final Response to NRC Generic Letter 2004-022021-06-24024 June 2021 Revision to Updated Final Response to NRC Generic Letter 2004-02 SBK-L-21056, Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report Review References:2021-05-20020 May 2021 Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report Review References: SBK-L-21044, 2020 Annual Radiological Environmental Operating Report2021-04-30030 April 2021 2020 Annual Radiological Environmental Operating Report SBK-L-21045, Submittal of 2020 Annual Radioactive Effluent Release Report2021-04-30030 April 2021 Submittal of 2020 Annual Radioactive Effluent Release Report SBK-L-21042, Response to RIS 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to RIS 2021-01 Preparation and Scheduling of Operator Licensing Examinations SBK-L-21033, Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements2021-03-24024 March 2021 Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements SBK-L-21023, Radiological Emergency Plan (Ssrep), Revision 772021-03-0404 March 2021 Radiological Emergency Plan (Ssrep), Revision 77 SBK-L-20154, Submittal of Changes to the Seabrook Station Technical Specification Bases2020-12-22022 December 2020 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-20149, Response to Request for Additional Information in Respect to One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-12-0808 December 2020 Response to Request for Additional Information in Respect to One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic SBK-L-20146, One-Time Exemption Request for the Biennial Emergency Preparedness Exercise Requirements of 10 CFR 50, Appendix E. IV.F.2.b and IV.F.2.c2020-12-0303 December 2020 One-Time Exemption Request for the Biennial Emergency Preparedness Exercise Requirements of 10 CFR 50, Appendix E. IV.F.2.b and IV.F.2.c SBK-L-20144, Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-23023 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic SBK-L-20143, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 004-022020-11-19019 November 2020 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 004-02 SBK-L-20132, Fourth Interval Inservice Testing (IST) Program2020-10-21021 October 2020 Fourth Interval Inservice Testing (IST) Program SBK-L-20127, Generator Tube Inspection Report2020-10-20020 October 2020 Generator Tube Inspection Report SBK-L-20117, Response to Request for Additional Information Regarding Technical Specification 3/4.8.1 for a One-Time Extension of Allowed Outage Time License Amendment Request2020-09-23023 September 2020 Response to Request for Additional Information Regarding Technical Specification 3/4.8.1 for a One-Time Extension of Allowed Outage Time License Amendment Request SBK-L-20103, Inservice Inspection Examination Report2020-07-27027 July 2020 Inservice Inspection Examination Report SBK-L-20092, Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-411 and TSTF-4182020-07-13013 July 2020 Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-411 and TSTF-418 SBK-L-20068, License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating2020-07-13013 July 2020 License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating SBK-L-20085, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-16016 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic 2024-04-12 Category:Report MONTHYEARL-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024
[Table view]Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio L-2023-028, And Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 And Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2022-168, And Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 And Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report SBK-L-21106, Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program2021-09-30030 September 2021 Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program ML21062A1462021-04-21021 April 2021 Memo to File: Final Ea/Fonsi of 2012 and 2015 Decommissioning Funding Plans for Seabrook Station Unit 1 Independent Spent Fuel Storage Installation (2012 and 2015) L-2019-151, 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2019-08-0606 August 2019 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds2019-03-19019 March 2019 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds ML19002A1602019-03-12012 March 2019 Nrc'S Record of Decision for the License Renewal Application for Seabrook Station, Unit 1 - 1-4-19 ML19101A4552018-11-14014 November 2018 Samuel Miranda Public Comments for November 15, 2018 Seabrook LRA Meeting ML18012A5682018-01-12012 January 2018 Technical Evaluation Report: Storm Surge_Seabrook_January2018 SBK-L-17172, Seventh Annual Update to the License Renewal Application2017-10-18018 October 2017 Seventh Annual Update to the License Renewal Application SBK-L-17136, Seismic High Frequency Confirmation Report for the Reevaluated Seismic Hazard Information2017-08-28028 August 2017 Seismic High Frequency Confirmation Report for the Reevaluated Seismic Hazard Information ML17191A4122017-07-10010 July 2017 NextEra Service Position Paper: Seabrook Service Water TS 3.7.4 SBK-L-17099, Flooding Focused Evaluation for Impact of New Flooding Hazard Information2017-06-28028 June 2017 Flooding Focused Evaluation for Impact of New Flooding Hazard Information L-2017-014, Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 20162017-04-17017 April 2017 Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 2016 ML16279A0502016-07-31031 July 2016 Enclosure 3: MPR-4153, Revision 2, Seabrook Station-Approach for Determining Through-Thickness Expansion from Alkali-Silica Reaction, July 2016 (Seabrook Fp# 100918) (Non-proprietary) ML16279A0492016-07-31031 July 2016 Enclosure 2: Simpson Gumpertz & Heger, Inc., Evaluation and Design Confirmation of As-Deformed Ceb, 150252-CA-02, Revision 0, July 2016 (Seabrook FP#100985) ML16216A2422016-07-31031 July 2016 MPR-4273, Revision 0, Seabrook Station - Implications of Large-Scale Test Program Results on Reinforced Concrete Affected by Alkali-Silica Reaction, July 2016 ML16216A2412016-07-31031 July 2016 MPR-4288, Revision 0, Seabrook Station: Impact of Alkali-Silica Reaction on Structural Design Evaluations, July 2016 SBK-L-16071, Sg&H Report 160268-R-01 Development of ASR Load Factors for Seismic Category I Structures (Including Containment) at Seabrook Station. Seabrook, Nh Revision 02016-07-27027 July 2016 Sg&H Report 160268-R-01 Development of ASR Load Factors for Seismic Category I Structures (Including Containment) at Seabrook Station. Seabrook, Nh Revision 0 SBK-L-16108, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events2016-07-26026 July 2016 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events ML16147A1962016-04-29029 April 2016 10 CFR 50.59 Report, Revision 17 to Updated Final Safety Analysis Report, Revision 14 to Appendix R, Revision 15 to Appendix a, and Revision 146 to the Technical Requirements Manual ML16117A3122016-04-26026 April 2016 SBK-L-16056 - NextEra Energy Seabrook, LLC - Revised Response to NRC 12/23/2015 Questions on Ceb Root Cause ML16068A1352016-02-27027 February 2016 Attachment 3 - Clean Copy of Seabrook Emergency Action Levels - Initiating Conditions, Threshold Values and Basis ML16068A1392016-02-27027 February 2016 Attachment 5 - Technical Information for Proposed Initiating Conditions and Emergency Action Levels ML16068A1312016-02-27027 February 2016 Attachment 2 - Markup of Seabrook Station Emergency Action Levels -Initiating Conditions, Threshold Values and Basis ML16068A1372016-02-27027 February 2016 Attachment 4 - NEI 99-01, Rev. 6, Deviations and Differences, Seabrook Station Nuclear Power Plant - Unit 1 SBK-L-15195, Best Estimate Large Break Loss of Coolant Accident 10 CFR 50.46 30-Day Report2015-11-0707 November 2015 Best Estimate Large Break Loss of Coolant Accident 10 CFR 50.46 30-Day Report ML15274A2142015-09-25025 September 2015 FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-1 Through Figure 4-33 SBK-L-15181, FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-34 Through Figure the End2015-09-25025 September 2015 FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Figure 4-34 Through Figure the End ML15274A2122015-09-25025 September 2015 FPL-081-PR-002, Revision 0, Flooding Hazards Reevaluation Report, Pp. 1 Through Figure 2-1 ML15208A0492015-08-12012 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Revaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights SBK-L-14229, Expedited Seismic Evaluation Process Report (CEUS Sites) Related to the Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The...2014-12-19019 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites) Related to the Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The... ML14216A4062014-07-24024 July 2014 Attachment 5, WCAP-17444-NP, Reactor Vessel Closure Head/Vessel Flange Requirements Evaluation for Seabrook Unit 1, (Non-proprietary) ML14216A4052014-07-24024 July 2014 Attachment 3, WCAP-17441-NP, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation SBK-L-14090, ANP-3243NP, Rev. 1, Seabrook Station, Unit 1, Fixed Incore Detector System Analysis Supplement to YAEC-1855PA, Licensing Report.2014-05-31031 May 2014 ANP-3243NP, Rev. 1, Seabrook Station, Unit 1, Fixed Incore Detector System Analysis Supplement to YAEC-1855PA, Licensing Report. ML14030A5522014-02-25025 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14049A1972014-02-14014 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Seabrook Station, TAC No.: MF0836 ML13295A2522013-12-17017 December 2013 Review of the 2012 Steam Generator Tube Inspections ML13267A3882013-12-0404 December 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13260A1612013-07-31031 July 2013 ANP-3243NP, Rev. 0, Seabrook Station Unit I Fixed Incore Detector System Analysis Supplement to YAEC-1855PA, Licensing Report ML13189A1972013-07-0202 July 2013 Third Annual Update to License Renewal Application ML13099A0192013-03-19019 March 2013 Attachment 5 to SBK-L-13061, Holtec Non-Proprietary Licensing Report HI-2114996, Rev. 3, Licensing Report for Seabrook Spent Fuel Pool and New Fuel Vault Analyses. ML12340A4872012-11-21021 November 2012 Enclosure to SBK-L-12242, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic ML12339A2742012-09-13013 September 2012 Concrete Summary 4-12 SBK-L-12101, NextEra Energy Seabrook License Renewal Application, Structures Monitoring Program Supplement-Alkali-Silica Reaction (ASR) Monitoring2012-05-16016 May 2012 NextEra Energy Seabrook License Renewal Application, Structures Monitoring Program Supplement-Alkali-Silica Reaction (ASR) Monitoring ML12179A2822012-03-15015 March 2012 ASR at Seabrook Station, Shear and Lap Splice Testing ML12038A0382012-01-30030 January 2012 Licensing Report for Seabrook Spent Fuel Pool and New Fuel Vault Analyses (Holtec International Document HI-2114996, Revision 2 SBK-L-12256, WCAP-17441-NP, Rev 0, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation2011-10-31031 October 2011 WCAP-17441-NP, Rev 0, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation 2024-05-30 Category:Technical MONTHYEARL-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024
[Table view]Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio L-2022-168, And Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 And Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report SBK-L-21106, Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program2021-09-30030 September 2021 Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds2019-03-19019 March 2019 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds ML18012A5682018-01-12012 January 2018 Technical Evaluation Report: Storm Surge_Seabrook_January2018 SBK-L-17136, Seismic High Frequency Confirmation Report for the Reevaluated Seismic Hazard Information2017-08-28028 August 2017 Seismic High Frequency Confirmation Report for the Reevaluated Seismic Hazard Information ML16216A2422016-07-31031 July 2016 MPR-4273, Revision 0, Seabrook Station - Implications of Large-Scale Test Program Results on Reinforced Concrete Affected by Alkali-Silica Reaction, July 2016 ML16216A2412016-07-31031 July 2016 MPR-4288, Revision 0, Seabrook Station: Impact of Alkali-Silica Reaction on Structural Design Evaluations, July 2016 ML16279A0492016-07-31031 July 2016 Enclosure 2: Simpson Gumpertz & Heger, Inc., Evaluation and Design Confirmation of As-Deformed Ceb, 150252-CA-02, Revision 0, July 2016 (Seabrook FP#100985) ML16279A0502016-07-31031 July 2016 Enclosure 3: MPR-4153, Revision 2, Seabrook Station-Approach for Determining Through-Thickness Expansion from Alkali-Silica Reaction, July 2016 (Seabrook Fp# 100918) (Non-proprietary) SBK-L-16071, Sg&H Report 160268-R-01 Development of ASR Load Factors for Seismic Category I Structures (Including Containment) at Seabrook Station. Seabrook, Nh Revision 02016-07-27027 July 2016 Sg&H Report 160268-R-01 Development of ASR Load Factors for Seismic Category I Structures (Including Containment) at Seabrook Station. Seabrook, Nh Revision 0 ML16068A1312016-02-27027 February 2016 Attachment 2 - Markup of Seabrook Station Emergency Action Levels -Initiating Conditions, Threshold Values and Basis ML16068A1392016-02-27027 February 2016 Attachment 5 - Technical Information for Proposed Initiating Conditions and Emergency Action Levels ML16068A1372016-02-27027 February 2016 Attachment 4 - NEI 99-01, Rev. 6, Deviations and Differences, Seabrook Station Nuclear Power Plant - Unit 1 ML16068A1352016-02-27027 February 2016 Attachment 3 - Clean Copy of Seabrook Emergency Action Levels - Initiating Conditions, Threshold Values and Basis ML14216A4052014-07-24024 July 2014 Attachment 3, WCAP-17441-NP, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation ML14216A4062014-07-24024 July 2014 Attachment 5, WCAP-17444-NP, Reactor Vessel Closure Head/Vessel Flange Requirements Evaluation for Seabrook Unit 1, (Non-proprietary) ML14030A5522014-02-25025 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14049A1972014-02-14014 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Seabrook Station, TAC No.: MF0836 ML13260A1612013-07-31031 July 2013 ANP-3243NP, Rev. 0, Seabrook Station Unit I Fixed Incore Detector System Analysis Supplement to YAEC-1855PA, Licensing Report ML13099A0192013-03-19019 March 2013 Attachment 5 to SBK-L-13061, Holtec Non-Proprietary Licensing Report HI-2114996, Rev. 3, Licensing Report for Seabrook Spent Fuel Pool and New Fuel Vault Analyses. ML12340A4872012-11-21021 November 2012 Enclosure to SBK-L-12242, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic ML12339A2742012-09-13013 September 2012 Concrete Summary 4-12 ML12038A0382012-01-30030 January 2012 Licensing Report for Seabrook Spent Fuel Pool and New Fuel Vault Analyses (Holtec International Document HI-2114996, Revision 2 SBK-L-12256, WCAP-17441-NP, Rev 0, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation2011-10-31031 October 2011 WCAP-17441-NP, Rev 0, Seabrook Unit 1 Heatup and Cooldown Limit Curves for Normal Operation ML1109702602011-03-28028 March 2011 Nwt 817, Chemistry Control in the Seabrook Thermal Barrier Loop, Final ML1033701672010-11-23023 November 2010 Attachment 3 to SBK-L-10185 -Seabrook Station Response to Request for Additional Information, NextEra Energy Seabrook License Renewal Environmental Report ML0915305402009-04-30030 April 2009 Attachment 5, WCAP-17071-NP, H: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model F), Non-Proprietary ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0709201422007-01-31031 January 2007 LTR-SCS-07-14-NP, Revision 0, Engineering Report, Seabrook, Turbine Trip Without Reactor Trip Transient from the P-9 Setpoint Analysis. SBK-L-05185, Limited Inspection of the Steam Generator Tube Portion within the Tubesheet at Seabrook Generating Station.2005-08-31031 August 2005 Limited Inspection of the Steam Generator Tube Portion within the Tubesheet at Seabrook Generating Station. ML0512201092005-04-22022 April 2005 Slides & Handouts from Meeting with FPL Energy Seabrook, LLC, Regarding Implementation of Technical Specification 3/4.8.1.1 ML0305604472003-02-14014 February 2003 Submittal of Investigation Report on Blind Performance Test Samples ML0303604312003-01-23023 January 2003 Submittal of Investigation Report on Blind Performance Test Samples ML0234702232002-12-0202 December 2002 Response to Request for Corrected Information - Steam Generator Tube ML0232405122002-11-0808 November 2002 Part 2 of 2, FPL Energy, Seabrook Station, Root Cause Analysis for CR 02-08166 Evaluation of D Steam Generator Tube Cracking ML0232404932002-11-0505 November 2002 Part 1 of 2, FPL Energy, Seabrook Station, Root Cause Analysis for CR 02-08166 Evaluation of D Steam Generator Tube Cracking ML0207702312002-03-12012 March 2002 Decommissioning Update March 2002 ML20248L4091998-05-31031 May 1998 Analysis of Seabrook Stations Unit 1,Reactor Vessel Surveillance Capsules U & Y ML20099J2031992-07-16016 July 1992 Analysis of Seabrook Station Unit 1 Reactor Vessel Surveillance Capsule U 2024-05-30 |