| | | Reporting criterion |
|---|
| 05000414/LER-2021-001, Indication Identified During Reactor Pressure Vessel Head Nozzle Penetration Inspection | Indication Identified During Reactor Pressure Vessel Head Nozzle Penetration Inspection | |
| 05000414/LER-2021-002, Valid Actuation of the Unit 2 Reactor Protection System and Auxiliary Feedwater System | Valid Actuation of the Unit 2 Reactor Protection System and Auxiliary Feedwater System | 10 CFR 50.73(a)(1), Submit an LER 10 CFR 50.73(a)(2)(iv)(A), System Actuation |
| 05000414/LER-2021-003, Re Containment Penetration Failure Resulting in Integrated Leak Rate Test Failure | Re Containment Penetration Failure Resulting in Integrated Leak Rate Test Failure | 10 CFR 50.73(a)(1), Submit an LER 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded |
| 05000413/LER-2021-005, Automatic Actuation of the 1B Emergency Diesel Generator Load Sequencer on Bus Under-voltage Condition | Automatic Actuation of the 1B Emergency Diesel Generator Load Sequencer on Bus Under-voltage Condition | 10 CFR 50.73(a)(1), Submit an LER 10 CFR 50.73(a)(2)(iv)(A), System Actuation |