TQ-AA-150-J020 Revision 01 Page 1 of 10 Job Performance Measure Reset 1C Diesel Generator After an Overspeed Trip JPM Number: JPM451 Revision Number: 05 Date: 8/19/2020 Developed By: Matt Beeler / 8/19/20 Instructor: Print / Sign Date Reviewed By: /

SME or Instructor: Print / Sign Date Reviewed By: /

Operations Representative: Print / Sign Date Approved By: /

Training Department: Print / Sign Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 01 Page 2 of 10 JPM451 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by instructor or SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. IAW NUREG 1021 Appendix C, clearly identify the task standard (i.e., the predetermined qualitative or quantitative outcome) against which task performance will be measured.
9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure: CPS 3506.01 Revision: 40a Procedure: Revision:

Procedure: Revision:

Procedure: Revision:

10. Verify cues both verbal and visual are free of conflict.
11. Verify performance time is accurate.
12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
13. When JPM is initially validated, sign and date JPM cover page. For subsequent validations, sign and date below:

/

SME / Instructor (Print/Sign) Date

/

SME / Instructor (Print/Sign) Date

/

SME / Instructor (Print/Sign) Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 01 Page 3 of 10 JPM451 Revision Record (Summary)

Revision # Summary 00 4/11/11 - New JPM.

01 7/17/12 - Minor revision due to procedure revision.

02 10/9/14 - Revision due to procedure and template revision.

03 6/30/16 - Updated procedure references.

04 11/9/17 - Updated to new JPM template. Updated procedure references.

05 8/19/20 - Updated to new JPM template. Updated procedure references.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 01 Page 4 of 10 JPM451 SETUP INSTRUCTIONS

1. This is an in-plant JPM. No simulator setup is required.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 01 Page 5 of 10 JPM451 INITIAL CONDITIONS You are an Extra Operator.

The Division III Diesel Generator tripped, due to an overspeed condition, while performing a post maintenance test run. The cause of the overspeed trip has been determined and corrected.

INITIATING CUE Reset the Division III Diesel Generator overspeed trip per CPS 3506.01, section 8.4.5.

Inform the CRS after completing the task.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

Ensure the examinee understands the following ground rules:

  • No equipment or controls will be manipulated during this evaluation, only SIMULATED actions will occur.
  • Do NOT shine any type light into a panel.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 01 Page 6 of 10 JPM451 JPM Start Time: JPM Sequence #: of Task Standard:

The examinee will latch the DG 1C overspeed reset lever and reset the lockout relays to return DG 1C to operation following an overspeed trip.

Comment STEP ELEMENT STANDARD SAT UNSAT Number CUE Provide the examinee with the Cue Sheet and the following:

  • CPS 3506.01 Diesel Generator and Support Systems (DG).

NOTE: Do NOT allow the examinee to climb on the DG platforms.

Simulations should be verbalized from the floor.

  • 01 8.4.5.1-8.4.5.2 Examinee simulates:

Re-latches the DG 1C

  • Pushing the overspeed overspeed reset lever. switch finger towards engine centerline. ___
  • Pulling down strongly (counter-clockwise) on the overspeed reset lever until it stops and latches.

CUE When the examinee re-latches the overspeed reset lever, cue him/her:

  • Overspeed switch finger is moved towards engine centerline.
  • Reset Lever is moved down and latched.

IF the examinee attempts to move the Reset Lever without repositioning the overspeed switch finger, then:

  • cue the operator that the Reset Lever doesnt move (the examinee should figure out what is restricting the required movement).

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 01 Page 7 of 10 JPM451 Comment STEP ELEMENT STANDARD SAT UNSAT Number 02 8.4.5.3 Examinee verifies match-marks are aligned on the overspeed Verifies overspeed switch ___

switch shaft/finger.

shaft/finger are positioned correctly.

NOTE: Step 8.4.5.4 is N/A for DG 1C.

Step 8.4.5.5 directs operator to reset lockout relays per section 8.4.6.

  • 03 8.4.6.1 Examinee locates and depresses the Safety RESET Resets DG 1C engine safety ___

push-button (S-7) on 1E22-shutdown relays.

S001B.

NOTE: Step 8.4.6.2 is N/A for DG 1C.

Holding Engine/Generator Lockout in reset for greater than 2 seconds will damage the lockout relay.

  • 04 8.4.6.3.1 Examinee locates DG Lockout Relay (86 device) on Resets DG 1C lock-out relay 1E22-S001B and simulates (86 device).

rotating handle in ___

CLOCKWISE direction until latched, but not greater than 2 seconds.

CUE When the examinee rotates the lockout relay handle, cue him/her:

  • The handle is rotating in the direction you have indicated. Handle is latched. White light is on.

05 8.4.6.3.2 Examinee locates Lockout Relay 1E22B-K1 (86G device)

Verifies status of DG 1C on 1H22-P028 and verifies 1E22B-K1 (86G device). ___

Lockout Relay 1E22B-K1 (86G device) is reset (blue light ON, white light OUT).

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 01 Page 8 of 10 JPM451 Comment STEP ELEMENT STANDARD SAT UNSAT Number CUE When the examinee locates lockout relay 1E22B-K1 (86G device) on 1H22-P028 cue him/her:

  • Blue light is ON, white light is OUT, Switch is vertical and black flagged.

JPM is complete.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 01 Page 9 of 10 JPM451 JPM

SUMMARY

Operators Name: Emp. ID#:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Reset 1C Diesel Generator After an Overspeed Trip JPM Number: JPM451 Revision Number: 05 Task Number and

Title:

350601.32 Reset Overspeed Trip Device Task Standard: The examinee will latch the DG 1C overspeed reset lever and reset the lockout relays to return DG 1C to operation following an overspeed trip.

K/A Number and Importance:

K/A System K/A Number Importance (RO/SRO) 264000 2.1.30 4.4 4.0 Suggested Testing Environment: Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

Procedure: CPS 3506.01 Revision: 40a Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory NOTE: Enter finalized grading, comments, and notes relevant to this evaluation in the associated TQ-AA-150-F03A/B. (See AR 4282419).

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 01 Page 10 of 10 JPM451 INITIAL CONDITIONS You are an Extra Operator.

The Division III Diesel Generator tripped, due to an overspeed condition, while performing a post maintenance test run. The cause of the overspeed trip has been determined and corrected.

INITIATING CUE Reset the Division III Diesel Generator overspeed trip per CPS 3506.01, section 8.4.5.

Inform the CRS after completing the task.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 01 Page 1 of 9 Job Performance Measure Place an IA Ring Header Automatic Isolation Valve into Service JPM Number: JPM428 Revision Number: 02 Date: 8/25/2020 Developed By: Matt Beeler / 8/25/20 Instructor: Print / Sign Date Reviewed By: /

SME or Instructor: Print / Sign Date Reviewed By: /

Operations Representative: Print / Sign Date Approved By: /

Training Department: Print / Sign Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 01 Page 2 of 9 JPM428 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by instructor or SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. IAW NUREG 1021 Appendix C, clearly identify the task standard (i.e., the predetermined qualitative or quantitative outcome) against which task performance will be measured.
9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure: CPS 3214.01 Revision: 27c Procedure: Revision:

Procedure: Revision:

Procedure: Revision:

10. Verify cues both verbal and visual are free of conflict.
11. Verify performance time is accurate.
12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
13. When JPM is initially validated, sign and date JPM cover page. For subsequent validations, sign and date below:

/

SME / Instructor (Print/Sign) Date

/

SME / Instructor (Print/Sign) Date

/

SME / Instructor (Print/Sign) Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 01 Page 3 of 9 JPM428 Revision Record (Summary)

Revision # Summary 00 7/28/20 - Updated references and JPM number (32140120NSN01) 01 6/23/15 - Updated Format. Updated Procedure Revision Number.

02 8/19/20 - Updated to new JPM template. Updated procedure references.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 01 Page 4 of 9 JPM428 SETUP INSTRUCTIONS

1. This is an in-plant JPM. No simulator setup is required.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 01 Page 5 of 9 JPM428 INITIAL CONDITIONS You are an extra Operator.

The Control Building IA ring header has automatically isolated due to a leak on the Radwaste Building ring header. The leak has been subsequently repaired.

INITIATING CUE Restore the Control Building IA ring header to service in accordance with CPS No. 3214.01, PLANT AIR (IA & SA), section 8.2.1.5, by supplying air from the Aux/Fuel Building IA Ring Header.

Inform the MCR when the task is complete.

NOTE: All pre-job briefings are complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

Ensure the examinee understands the following ground rules:

  • No equipment or controls will be manipulated during this evaluation, only SIMULATED actions will occur.
  • Do NOT shine any type light into a panel.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 01 Page 6 of 9 JPM428 JPM Start Time: JPM Sequence #: of Task Standard:

The examinee will place an IA Ring Header Automatic Isolation Valve into Service.

Comment STEP ELEMENT STANDARD SAT UNSAT Number CUE Provide the examinee with the Cue Sheet and a copy of CPS 3214.01 Plant Air (IA & SA).

  • 01 8.2.1.5.1 Examinee locates and simulates operating (slowly Opens one or both of the per caution) 1IA024, Auto auto isolation valve Isolation Bypass.

bypasses as necessary to slowly repressurize the ring Examinee turns handwheel in ___

header. the CCW direction until resistance is felt in the open position.

CUE Pressure indicator 1PI-IA055 shows an increasing pressure (1PI-IA055 is on left hand side if facing the Aux Bldg).

02 8.2.1.5.2 Examinee locates pressure gages and verifies pressure has Waits until the isolated ring header pressure is 70 psig equalized.

or above and equalized across the auto isolation valves.

CUE After several seconds - 1PI-IA055 reads nearly the same pressure as indicated on 1PI-IA054.

If requested, flow noise has died off to near nothing.

If requested, Low Pressure Control Building IA Ring Header annunciator has cleared.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 01 Page 7 of 9 JPM428 Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • 03 8.2.1.5.3 Examinee locates and simulates moving the lever to Returns the Latch/Unlatch ___

the latch position for 1IA022.

lever arm to the Latch Position.

CUE Lever arm is latched and holding.

04 8.2.1.5.4 Examinee locates 1IA022 and observes valve position ___

Verifies the auto isolation indication to verify open.

valve opens.

CUE Component is in the position described.

  • 05 8.2.1.5.5 Examinee locates and Closes or checks closed the simulates turning 1IA024 ___

handwheel clockwise until it auto isolation valve stops turning.

bypasses.

CUE 1IA024 handwheel stops moving.

06 8.2.1.5.6 Examinee inquires if there are any loads that need to be ___

Restores air loads as restored at this time.

necessary.

CUE No further loads are required to be placed in service.

CUE JPM is complete.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 01 Page 8 of 9 JPM428 JPM

SUMMARY

Operators Name: Emp. ID#:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Place an IA Ring Header Automatic Isolation Valve Into Service JPM Number: JPM428 Revision Number: 02 Task Number and

Title:

321401.20 - Repressurize an Isolated Ring Header.

Task Standard: The examinee will place an IA Ring Header Automatic Isolation Valve Into Service IAW CPS No. 3214.01 rev. 26d, PLANT AIR (IA & SA).

K/A Number and Importance:

K/A System K/A Number Importance (RO/SRO) 295019 AA1.02 3.3 3.1 Suggested Testing Environment: Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

Procedure: CPS 3214.01 Revision: 27c Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 10 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory NOTE: Enter finalized grading, comments, and notes relevant to this evaluation in the associated TQ-AA-150-F03A/B. (See AR 4282419).

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 01 Page 9 of 9 JPM428 INITIAL CONDITIONS You are an extra Operator.

The Control Building IA ring header has automatically isolated due to a leak on the Radwaste Building ring header. The leak has been subsequently repaired.

INITIATING CUE Restore the Control Building IA ring header to service in accordance with CPS No. 3214.01, PLANT AIR (IA & SA), section 8.2.1.5, by supplying air from the Aux/Fuel Building IA Ring Header.

Inform the MCR when the task is complete.

NOTE: All pre-job briefings are complete.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 01 Page 1 of 10 Job Performance Measure RSP - Div 2 LPCI Operation JPM Number: JPM533 Revision Number: 03 Date: 8/24/2020 Developed By: Matt Beeler / 8/24/20 Instructor: Print / Sign Date Reviewed By: /

SME or Instructor: Print / Sign Date Reviewed By: /

Operations Representative: Print / Sign Date Approved By: /

Training Department: Print / Sign Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 01 Page 2 of 10 JPM533 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by instructor or SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. IAW NUREG 1021 Appendix C, clearly identify the task standard (i.e., the predetermined qualitative or quantitative outcome) against which task performance will be measured.
9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure: CPS 4003.01C011 Revision: 1a Procedure: Revision:

Procedure: Revision:

Procedure: Revision:

10. Verify cues both verbal and visual are free of conflict.
11. Verify performance time is accurate.
12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
13. When JPM is initially validated, sign and date JPM cover page. For subsequent validations, sign and date below:

/

SME / Instructor (Print/Sign) Date

/

SME / Instructor (Print/Sign) Date

/

SME / Instructor (Print/Sign) Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 01 Page 3 of 10 JPM533 Revision Record (Summary)

Revision # Summary 00 6/23/15 - New JPM.

9/26/17 - Updated to reflect support of Time Sensitive Action 18. Minor 01 Revision to add a tie to the time sensitive action #18.

02 3/6/18 - Updated procedure references and JPM template.

03 8/24/20 - Updated to new JPM template. Updated procedure references.

Corrective Action AR#03969254 This training material supports the demonstration/execution of Time Sensitive Action

18. Do NOT change this material without reviewing OP-AA-102-106 Operator Response Time Program and OP-CL-102-106-1001 Operator Response Time Master List at CPS to verify that any changes made do not affect the demonstration/execution of Time Sensitive Action 18.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 01 Page 4 of 10 JPM533 SETUP INSTRUCTIONS

1. This is an in-plant JPM. No simulator setup is required.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 01 Page 5 of 10 JPM533 INITIAL CONDITIONS A plant transient has occurred.

The plant is shutdown with High Pressure Core Spray and Reactor Core Isolation Cooling inoperable. 4160V Bus 1A1 has de-energized due to a fault. Automatic Depressurization System was activated due to Reactor Coolant leak into the Secondary Containment. The Main Control Room had to be abandoned due to a major fire.

You are an Extra Operator.

INITIATING CUE Inject into the RPV using CPS 4003.01C011, RSP - Div 2 LPCI Operation Section 4.0, DIV 2 LPCI STARTUP.

The Remote Shutdown Panel (RSP) is manned and an additional Operator has been dispatched to AB 707 to support you as required.

Report to the CRS when Div 2 LPCI is injecting to the RPV.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

Ensure the examinee understands the following ground rules:

  • No equipment or controls will be manipulated during this evaluation, only SIMULATED actions will occur.
  • Do NOT shine any type light into a panel.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 01 Page 6 of 10 JPM533 JPM Start Time: JPM Sequence #: of Task Standard:

The examinee will inject into the RPV using Div 2 LPCI from the Remote Shutdown Panel.

Comment STEP ELEMENT STANDARD SAT UNSAT Number CUE Provide the examinee with the Cue Sheet and a copy of CPS 4003.01C011 RSP -

Div 2 LPCI Operation.

NOTE: Do NOT allow the Examinee to remove items from the RSP supply podium.

CUE Required items from the RSP supply podium are in the examinees possession.

4.1 01 At AB MCC 1B2 Cub 5C Opens 1E12-F004B, RHR (1AP76E5C), AB 781 West, PUMP 1B SUCT VLV. Examinee verifies red light is ON and green light is OFF for 1E12-F004B, RHR PUMP 1B SUCT VLV.

CUE Component is in the position described.

CIRCUIT BREAKER CONTROL handswitch to CLOSE.

CUE When switch is repositioned, red light is ON and green light is OFF.

NOTE: For the following steps, cues will be provided when requested from the Operator who was dispatched to AB 707. Steps 4.4.1 and 4.4.2 may be performed more than once.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 01 Page 7 of 10 JPM533 Comment STEP ELEMENT STANDARD SAT UNSAT Number 03 4.3 Examinee contacts the Operator in AB 707 and Verifies RHR PUMP ROOM ___

requests status of 1VY06C.

1B SUPPLY FAN, 1VY06C starts.

CUE 1VY06C is running.

04 4.4 Examinee contacts the Monitors the RHR Pump B for Operator in AB 707 and ___

requests RHR B pump D/P.

proper D/P.

CUE RHR pump D/P is 374 psid.

05 4.4 Examinee determines 1E12-F064B, RHR PUMP 1B MIN Monitors the RHR Pump B FLOW VLV should be open.

minimum flow valve for proper operation.

At AB MCC 1B2 Cub 8C ___

(1AP76E8C), AB 781 West, Examinee verifies red light is ON and green light is OFF for 1E12-F064B, RHR PUMP 1B MIN FLOW VLV.

CUE The component is in the position described.

NOTE: For the following step, cue for RPV pressure will be provided when requested from the Operator at the RSP.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 01 Page 8 of 10 JPM533 Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • 06 4.5 Examinee contacts the Operator at the RSP and Aligns RHR B for injection requests RPV pressure.

when RPV pressure < 472 psig.

At AB MCC 1B3 Cub 8C (1AP77E8C), AB 781 West, Examinee opens 1E12-F042B, RHR PUMP 1B LPCI CNMT VLV.

CUE When the examinee requests RPV pressure, respond that RPV pressure is 250 psig and lowering.

If requested, the as-found condition of 1E12-F042B is red light is OFF and green light is ON.

(when switch is repositioned) - red light is ON and green light is ON.

(20 seconds later) - red light is ON and green light is OFF.

If requested, state pump D/P is 250 psid and 1E12-F064B indicates shut.

07 Reports to the CRS that Div 2 Examinee reports to the CRS LPCI is injecting to the RPV. that Div 2 LPCI is injecting to ___

the RPV.

CUE JPM is complete.

JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 01 Page 9 of 10 JPM533 JPM

SUMMARY

Operators Name: Emp. ID#:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

RSP - Div 2 LPCI Operation JPM Number: JPM533 Revision Number: 03 Task Number and

Title:

400301.04 Remote Shutdown Panel tasks that DO Require MCR Evacuation (licensed task).

Task Standard: The examinee will inject into the RPV using Div 2 LPCI from the Remote Shutdown Panel.

K/A Number and Importance:

K/A System K/A Number Importance (RO/SRO) 295016 A1.07 4.2 4.3 Suggested Testing Environment: Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s):

Procedure: CPS 4003.01C011 Revision: 1a Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 20 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory NOTE: Enter finalized grading, comments, and notes relevant to this evaluation in the associated TQ-AA-150-F03A/B. (See AR 4282419).

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 01 Page 10 of 10 JPM533 INITIAL CONDITIONS A plant transient has occurred.

The plant is shutdown with High Pressure Core Spray and Reactor Core Isolation Cooling inoperable. 4160V Bus 1A1 has de-energized due to a fault. Automatic Depressurization System was activated due to Reactor Coolant leak into the Secondary Containment. The Main Control Room had to be abandoned due to a major fire.

You are an Extra Operator.

INITIATING CUE Inject into the RPV using CPS 4003.01C011, RSP - Div 2 LPCI Operation Section 4.0, DIV 2 LPCI STARTUP.

The Remote Shutdown Panel (RSP) is manned and an additional Operator has been dispatched to AB 707 to support you as required.

Report to the CRS when Div 2 LPCI is injecting to the RPV.

SRRS: 3D.100; There are no retention requirements for this section