ES-301 Operating Test Quality Checklist Form ES-301-3 Facility: CPS Date of Examination: 3/22/2021 Qperatina Test Number: 2021*301

1. General Criteria Initials a

b*

c'

a.

The operating test conforms to the previously approved outline; changes are consistent with f/1

'r samolino reauirements Ce.a., 10 CFR 55.45, ooerational imoortance, safetv function distribu1ion}.

b.

There is no day-to-day repetition between this and other operating tests to be administered I'/\\

durinQ this examination.



c.

The operatinQ test shall not duplicate items from the aoolicants' audit test!sl (see Section D.1.a.l. M...

d.

Overtap with the written examination and between different parts of the operating test is within t1 acceotable limits.

e.

It appears that the operating test will differentiate between competent and less-than-competent

/'II aoolicants at the desiQnated license level.

2. Walkthrough Criteria a.

Each JPM includes the following, as applicable:

initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific JV\\

designation if deemed to be time critical by the facility licensee operationally important specific performance criteria that include-detailed expected actions with exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the seauence of steos, if aoolicable

b.

Ensure that any changes from the previously approved systems and administrative walkthrough outlines (Forms ES-301-1 and ES-301*2) have not caused the test to deviate from any of the M,-

acceptance criteria (e.g., item distribution, bank use, repetition from the last two NRC examinations) specified on those forms and Form ES-201-2.

3. Simulator Criteria The associated simulator operating tests (scenario sets} have been reviewed in accordance with M,.

Form ES-301*4, and a copy is attached.

e/So



a.

Author Matthew Beeler

(

\\)

b.

Facility Reviewer (')

Tim Windinaland

.----...

 l:2s.

c.

NRC Chief Examiner(#)

Greg Roach



d.

NRC Supervisor

  • The facility licensee signature is not applicable for NRC*developed tests.
  1. The independent NRC reviewer initials items in column "c"; the chief examiner concurrence is reauired.

GMR GMR GMR GMR GMR GMR GMR GMR GMR Gregory M. Roach Digitally signed by Gregory M. Roach Date: 2021.02.16 09:35:03 -06'00' Patricia J. Pelke Digitally signed by Patricia J. Pelke Date: 2021.03.22 10:58:03 -05'00'